CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20240469
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 04/09/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 04/09/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Building Permit Fee | $0.00 | $0.00 | Not payable | Not Paid |
Building Plan Review Fee | $0.00 | $0.00 | Not payable | Not Paid |
Totals: | $290.00 | $290.00 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Not Ready | 4/25/2024 | 4/25/2024 | 04/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. discussed old permit new permit and current scope of work
|
||||
Energy (Insulation) Inspection | Failed | 6/4/2024 | 6/4/2024 | 06/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.complete vapor barrier as discussed with contractor
|
||||
Comment Engineering Div Inspection | Passed | 6/7/2024 | 6/7/2024 | 06/07/2024 |
Jeff Hill ((253) 204-5633) | ||||
Energy (Insulation) Inspection | Failed | 6/10/2024 | 6/10/2024 | 06/10/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.complete vapor barrier as discussed with contractor
|
||||
Other/Miscellaneous
Resolved
09/17/2024
1. complete vapor barrier as discussed with contractor
2. provide head of wall detail at north end of office space at time of next inspection
|
||||
Energy (Insulation) Inspection | Failed | 6/12/2024 | 6/12/2024 | 06/12/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.complete vapor barrier as discussed with contractor
|
||||
Other/Miscellaneous
Resolved
09/17/2024
1. complete vapor barrier as discussed with contractor
2. provide head of wall detail at north end of office space at time of next inspection
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 6/12/2024
1. complete corrections from previous inspection prior to scheduling next inspection
|
||||
Energy (Insulation) Inspection | Partial Pass | 6/17/2024 | 6/17/2024 | 06/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
06/17/2024
1.complete vapor barrier as discussed with contractor
|
||||
Other/Miscellaneous
Resolved
06/17/2024
1. complete vapor barrier as discussed with contractor
2. provide head of wall detail at north end of office space at time of next inspection
|
||||
Other/Miscellaneous
Resolved
06/17/2024
date of inspection 6/12/2024
1. complete corrections from previous inspection prior to scheduling next inspection
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 6/17/2024
1.insulation and vapor barrier at roof approved
|
||||
Frame Inspection | Partial Pass | 6/27/2024 | 6/27/2024 | 06/27/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.framing at fill ins approved pending electrical approval
2.ok to insulate as discussed with contractor
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/27/2024 | 6/27/2024 | 06/27/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. drywall at fill in on inside approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 7/3/2024 | 7/3/2024 | 07/03/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 6/17/2024
1.insulation and vapor barrier at roof approved
|
||||
Other/Miscellaneous
Resolved
09/17/2024
insulation in demising walls at three places ok
|
||||
Shear Wall Inspection | Partial Pass | 7/9/2024 | 7/9/2024 | 07/10/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.plywood nailing and vapor barrier at east demising wall approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/9/2024 | 7/9/2024 | 07/10/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. drywall at fill in on inside approved
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 7/9/2024
1. drywall fill ins in north demising wall exterior side approved
|
||||
Shear Wall Inspection | Partial Pass | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.plywood nailing and vapor barrier at east demising wall approved
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 7/16/2024
1.plywood strips at east dismissing wall approved ok to drywall
|
||||
Exhaust/Vent Fans Inspection | Passed | 7/17/2024 | 7/17/2024 | 07/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/17/2024
1.duct sealing approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/17/2024 | 7/17/2024 | 07/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. drywall at fill in on inside approved
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 7/9/2024
1. drywall fill ins in north demising wall exterior side approved
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 7/17/2024
1. drywall at east demising wall approved
|
||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 7/23/2024 | 7/23/2024 | 07/23/2024 |
David Drake ((253) 864-4171) | ||||
Ceiling Grid/T-Bar Inspection | Not Ready | 7/29/2024 | 7/29/2024 | 07/29/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1.provide engineering for pods on site at time of next inspection
2.complete pods in areas that exceed 1,000 sq ft
3. provide seismic separation joint in areas that exceed 2,500 sq ft
4. not a complete list
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 7/31/2024 | 08/01/2024 | |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/01/2024
1.provide engineering for pods on site at time of next inspection
2.complete pods in areas that exceed 1,000 sq ft
3. provide seismic separation joint in areas that exceed 2,500 sq ft
4. not a complete list
|
||||
Other/Miscellaneous
Resolved
09/17/2024
7/31/2024
1.provide engineering for pods on site at time of next inspection (will submit from architect)
2.complete pods in areas that exceed 1,000 sq ft (contractor will create soffit/separation at kitchenette)
3. provide seismic separation joint in areas that exceed 2,500 sq ft (Completed)
4. not a complete list
|
||||
Comment Building Div Inspection | Passed w/ Conditions | 7/31/2024 | 08/01/2024 | |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. discussed old permit new permit and current scope of work
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 8/5/2024 | 8/5/2024 | 08/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/07/2024
7/31/2024
1.provide engineering for pods on site at time of next inspection (will submit from architect)
2.complete pods in areas that exceed 1,000 sq ft (contractor will create soffit/separation at kitchenette)
3. provide seismic separation joint in areas that exceed 2,500 sq ft (Completed)
4. not a complete list
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 8/8/2024 | 8/8/2024 | 08/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
7/31/2024
1.provide engineering for pods on site at time of next inspection (will submit from architect)
2.complete pods in areas that exceed 1,000 sq ft (contractor will create soffit/separation at kitchenette)
3. provide seismic separation joint in areas that exceed 2,500 sq ft (Completed)
4. not a complete list
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 8/8/2024
1.kitchen area approved for cover
2.main area complete pods per city approved plans ( fasteners and spacing as discussed with contractor )
3. this is a complete list
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 8/16/2024 | 8/16/2024 | 08/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
7/31/2024
1.provide engineering for pods on site at time of next inspection (will submit from architect)
2.complete pods in areas that exceed 1,000 sq ft (contractor will create soffit/separation at kitchenette)
3. provide seismic separation joint in areas that exceed 2,500 sq ft (Completed)
4. not a complete list
|
||||
Other/Miscellaneous
Resolved
09/17/2024
date of inspection 8/8/2024
1.kitchen area approved for cover
2.main area complete pods per city approved plans ( fasteners and spacing as discussed with contractor )
3. this is a complete list
|
||||
Other/Miscellaneous
Resolved
09/17/2024
8/16/24
1:install clips on diffusers correctly or provide screws
2:complete siezmic wires on lights
3:patch holes in demising walls
|
||||
Ceiling Grid/T-Bar Inspection | Passed | 8/19/2024 | 8/19/2024 | 08/19/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/19/2024
7/31/2024
1.provide engineering for pods on site at time of next inspection (will submit from architect)
2.complete pods in areas that exceed 1,000 sq ft (contractor will create soffit/separation at kitchenette)
3. provide seismic separation joint in areas that exceed 2,500 sq ft (Completed)
4. not a complete list
|
||||
Other/Miscellaneous
Resolved
08/19/2024
date of inspection 8/8/2024
1.kitchen area approved for cover
2.main area complete pods per city approved plans ( fasteners and spacing as discussed with contractor )
3. this is a complete list
|
||||
Other/Miscellaneous
Outstanding
08/19/2024
date of inspection 8/19/2024
1.ceiling cover approved per city approved documents
2. ok to cover
|
||||
Exit Lighting Test Inspection | Passed | 9/4/2024 | 09/05/2024 | |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 09/05/2024 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 09/05/2024 | ||
David Drake ((253) 864-4171) | ||||
Fire Final Inspection | Passed | 9/4/2024 | 9/4/2024 | 09/05/2024 |
David Drake ((253) 864-4171) | ||||
Building Final Inspection | Failed | 9/5/2024 | 9/5/2024 | 09/05/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/17/2024
1. provide balance report as discussed with contractor
2.cap gas line on roof
3. fasten RTU to curb adapter on roof
4. provide fire final approval at time of next inspection
5. provide engineering final prior to next inspection
|
||||
Building Final Inspection | Passed | 9/12/2024 | 9/12/2024 | 09/12/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/12/2024
1. provide balance report as discussed with contractor
2.cap gas line on roof
3. fasten RTU to curb adapter on roof
4. provide fire final approval at time of next inspection
5. provide engineering final prior to next inspection
|
||||
Footing/Setback Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Foundation/Rebar Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Slab/Insulation Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Roof Sheathing Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Firewall/Firestop Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Combination Frame And Rough In Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Hydronic Piping Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Refrigeration Line Test Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Exhaust Hood Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Light Test For Grease Duct Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Medical Gas Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Engineering Final Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Frame Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/27/2024
1.framing at fill ins approved pending electrical approval
2.ok to insulate as discussed with contractor
|
||||
Energy (Insulation) Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Shear Wall Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/16/2024
1.plywood nailing and vapor barrier at east demising wall approved
|
||||
Other/Miscellaneous
Outstanding
07/16/2024
date of inspection 7/16/2024
1.plywood strips at east dismissing wall approved ok to drywall
|
||||
Wallboard / Drywall Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/17/2024
1. drywall at fill in on inside approved
|
||||
Other/Miscellaneous
Outstanding
07/17/2024
date of inspection 7/9/2024
1. drywall fill ins in north demising wall exterior side approved
|
||||
Other/Miscellaneous
Outstanding
07/17/2024
date of inspection 7/17/2024
1. drywall at east demising wall approved
|
||||
Comment Building Div Inspection | VOID | 09/17/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/01/2024
1. discussed old permit new permit and current scope of work
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
Reference Number | Status | Type |
---|---|---|
PRCTI20230310 | Closed | Commercial - Tenant Improvement/Remodel |
PRUSR20230614 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRFS20230864 | Expired | Fire Sprinklers |
PRFA20230883 | Closed | Fire Alarms |
PRFA20231139 | Closed | Fire Alarms |
PRFA20231193 | Closed | Fire Alarms |
PRFS20240702 | Permit(s) Issued | Fire Sprinklers |
PRCTI20250557 | Closed | Commercial - Tenant Improvement/Remodel |
PRSG20250891 | Closed | Sign/Awning |
PRCTI20251104 | Ready for Issuance | Commercial - Tenant Improvement/Remodel |
PRCTI20251201 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRSG20251300 | Permit(s) Issued | Sign/Awning |
PRFA20251359 | In Plan Check | Fire Alarms |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.