CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20240669
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 09/11/2024 |
Building Permit Fee | $2,393.75 | $2,393.75 | Paid | 09/11/2024 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 09/11/2024 |
Plumbing Fixtures Fee | $39.00 | $39.00 | Paid | 09/11/2024 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 09/11/2024 |
Building Plan Review Fee | $1,555.94 | $1,555.94 | Paid | 04/25/2024 |
Mechanical Plan Review Fee | $26.00 | $26.00 | Paid | 04/25/2024 |
Plumbing Plan Review Fee | $51.35 | $51.35 | Paid | 04/25/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 09/11/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 06/05/2024 |
Building Division Fee (Hourly) | $540.00 | $540.00 | Paid | 12/13/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $0.00 | $0.00 | Not payable | Not Paid |
Totals: | $5,156.04 | $5,156.04 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Partial Pass | 10/8/2024 | 10/08/2024 | |
Jason Little ((253) 244-0387) | ||||
Sidesewer Inspection | Failed | 10/8/2024 | 10/08/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/08/2024
Tie side sewer into main line upstream from the c/o and sample tee.
Install a 6" sample tee upstream from the c/o.
The c/o riser needs to be replaced.
Install cap and adaptors for the risers.
Install castings with lids that say sewer.
The c/o and sample tee dimension may need to be adjusted to fit within excavation. Maintain separation for casting fitment.
|
||||
Plumbing Rough In Inspection | Partial Pass | 10/14/2024 | 10/14/2024 | 10/14/2024 |
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | Partial Pass | 10/15/2024 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/15/2024
slab pour back approved
|
||||
Plumbing Rough In Inspection | Passed | 10/15/2024 | 10/15/2024 | 10/15/2024 |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Not Ready | 10/28/2024 | 10/28/2024 | 10/28/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/28/2024
1:complete all bottom track anchors, top track anchors, bracing.
|
||||
Frame Inspection | Partial Pass | 10/29/2024 | 10/29/2024 | 10/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/29/2024
frame at front and middle of store ok to include floating hard lid.
|
||||
Plumbing Rough In Inspection | Partial Pass | 10/31/2024 | 10/31/2024 | 10/31/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/31/2024
test for back area approved, insulate water lines where needed (hot water)
frame back area minus hard lids ok.
|
||||
Frame Inspection | Partial Pass | 11/1/2024 | 11/1/2024 | 11/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/01/2024
1:FRAME APPROVED MINUS AREA UNDER AND NORTH OF 2ND RTU FROM THE EAST.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 11/5/2024 | 11/5/2024 | 11/05/2024 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 11/6/2024 | 11/6/2024 | 11/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/06/2024
deflection track corrections ok
|
||||
Plumbing Rough In Inspection | Not Ready | 11/6/2024 | 11/6/2024 | 11/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Not Ready | 11/6/2024 | 11/6/2024 | 11/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Passed | 11/8/2024 | 11/8/2024 | 11/08/2024 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Passed | 11/8/2024 | 11/8/2024 | 11/08/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Passed | 11/8/2024 | 11/8/2024 | 11/08/2024 |
Monty Johnson ((253) 770-3326) | ||||
Wallboard / Drywall Inspection | Passed | 11/12/2024 | 11/12/2024 | 11/12/2024 |
Shannon King ((253) 840-6684) | ||||
Plumbing Final Inspection | Not Ready | 12/2/2024 | 12/2/2024 | 12/02/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/10/2024
1 ; cancel per contractor at time of inspection.
not ready
|
||||
Plumbing Final Inspection | Passed | 12/10/2024 | 12/10/2024 | 12/10/2024 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/10/2024
1 ; cancel per contractor at time of inspection.
not ready
|
||||
Building Final Inspection | Failed | 12/12/2024 | 12/12/2024 | 12/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2024
1:provide fire, engineering and electrical final prior to building final
2:complete entrance facade and flatwork
|
||||
Mechanical Final Inspection | Failed | 12/12/2024 | 12/12/2024 | 12/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2024
provide balance report and electrical final.
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 12/12/2024 | 12/12/2024 | 12/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2024
1:provide 3 turns on all wires and mech attach diffuser to grid as discussed.
|
||||
Planning Final Inspection | Passed | 12/13/2024 | 12/13/2024 | |
Chris Beale ((253) 841-5418) | ||||
Engineering Final Inspection | Passed | 12/13/2024 | 12/13/2024 | 12/13/2024 |
Jason Little ((253) 244-0387) | ||||
Erosion And Sediment Inspection | Failed | 12/13/2024 | 12/13/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/13/2024
- Dilute, clean, and dry fire room floor.
- Vactor and jet ALL storm lines along the west and north side of the building to the outlet at the swale.
|
||||
Comment Engineering Div Inspection | VOID | 12/13/2024 | ||
Jason Little ((253) 244-0387) | ||||
Erosion And Sediment Inspection | VOID | 12/13/2024 | ||
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/13/2024
- Dilute, clean, and dry fire room floor.
- Vactor and jet ALL storm lines along the west and north side of the building to the outlet at the swale.
|
||||
Sidesewer Inspection | Passed | 12/13/2024 | 12/13/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/13/2024
Tie side sewer into main line upstream from the c/o and sample tee.
Install a 6" sample tee upstream from the c/o.
The c/o riser needs to be replaced.
Install cap and adaptors for the risers.
Install castings with lids that say sewer.
The c/o and sample tee dimension may need to be adjusted to fit within excavation. Maintain separation for casting fitment.
|
||||
Ceiling Grid/T-Bar Inspection | Passed | 12/16/2024 | 12/17/2024 | 12/17/2024 |
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Not Ready | 12/16/2024 | 12/17/2024 | 12/17/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Failed | 12/16/2024 | 12/17/2024 | 12/17/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/17/2024
provide balance report
|
||||
Fire Final Inspection | Not Ready | 12/16/2024 | 12/17/2024 | |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/17/2024
Talked with Boot Barn management, Brian Bennett, and Façade contractor. Use the exterior rear door for stocking until life safety is met overhead at front entrance.
|
||||
Fire Final Inspection | Partial Pass | 12/19/2024 | 12/19/2024 | 12/19/2024 |
David Drake ((253) 864-4171) | ||||
Corrections:
Fire Final
Carried Forward
12/19/2024
1. TCO will be approved for 30 days once Building approval is signed off.
2. Façade must be complete prior to Final.
3. Emergency lighting test required for exterior illumination.
4. Test main entrance EXIT sign as it did not work during the last test.
5. Complete sealing up of Fire Sprinkler Riser room. All penetrations, and venting for old fire pump. The current heating must be able to maintain the room at a minimum of 40 degrees.
6. Complete fire lane stripping no parking along with ped crossing.
7. Install horn strobe on front of building.
8. Shell space requires install of Beam detectors prior to shell approvals. Fire alarm permit was for both spaces.
9. Do not use front door until an approved plan is in motion.
|
||||
Building Final Inspection | Partial Pass | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2024
30 day tco ok
|
||||
Exit Lighting Test Inspection | Passed | 1/30/2025 | 02/03/2025 | |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 02/03/2025 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 02/03/2025 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 02/03/2025 | ||
David Drake ((253) 864-4171) | ||||
Fire Final Inspection | Passed | 1/30/2025 | 02/03/2025 | |
David Drake ((253) 864-4171) | ||||
Corrections:
Fire Final
Resolved
02/03/2025
1. TCO will be approved for 30 days once Building approval is signed off.
2. Façade must be complete prior to Final.
3. Emergency lighting test required for exterior illumination.
4. Test main entrance EXIT sign as it did not work during the last test.
5. Complete sealing up of Fire Sprinkler Riser room. All penetrations, and venting for old fire pump. The current heating must be able to maintain the room at a minimum of 40 degrees.
6. Complete fire lane stripping no parking along with ped crossing.
7. Install horn strobe on front of building.
8. Shell space requires install of Beam detectors prior to shell approvals. Fire alarm permit was for both spaces.
9. Do not use front door until an approved plan is in motion.
|
||||
Building Final Inspection | Passed | 3/6/2025 | 03/06/2025 | |
Monty Johnson ((253) 770-3326) | ||||
Comment Building Div Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Underfloor Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Block Wall Rebar Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Re-Roof Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Hydronic Piping Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Shower Pan Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | VOID | 03/11/2025 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems.
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Open | |
Development & Permitting Services
A separate sign permit needs to be applied for the facade signage.
|
||
Plumbing FUW Utility Service Credit | Open | Standard Conditions |
Engineering Division
14.5 of the 26.5 available sewer credits from PRDE20240877 have been redeemed on PRCTI20240669. 12 sewer credits remain for future development projects. See emails attached under Plumbing Fixture Worksheet submittal. [Yianni Charitou @ 07/01/2024 7:34 AM]
|
||
Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
Reference Number | Status | Type |
---|---|---|
PRFS20241520 | Closed | Fire Sprinklers |
PRUSR20241577 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRFS20241638 | Closed | Fire Sprinklers |
PRUSR20241718 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRFA20241727 | Permit(s) Issued | Fire Alarms |
PRSG20241748 | Closed | Sign/Awning |
PRFS20241876 | Closed | Fire Sprinklers |