PRCTI20241500
Commercial - Tenant Improvement/Remodel
Returned for Correction
IDIL PUYALLUP LLC
Alteration/Remodel
Installation of new vehicle environmental chamber, equipment mezzanine platform and plumbing work in test lab area of existing manufacturing shop.
09/19/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Failed 10/28/2024 10/24/2024
Engineering Review Approved 10/28/2024 10/23/2024
Fire Review Approved 10/28/2024 10/22/2024
Building Review Failed 10/28/2024 10/15/2024
Engineering Traffic Review Approved 10/28/2024 10/10/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $700.54 $700.54 Paid 09/30/2024
Plumbing Plan Review Fee $51.35 $51.35 Paid 09/30/2024
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Building Permit Fee $1,077.75 $0.00 Not payable Not Paid
Sump, Sewage, or Ejector Pumps Fee $39.00 $0.00 Not payable Not Paid
Plumbing Permit Fee $40.00 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid
Sewer System Development ChargeFee - Tenant Improvment/Addition $865.40 $0.00 Not payable Not Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: Fire Final required prior to Building Final.
Miscellaneous Condition Resolved Engineering Division Prior to Issuance
: Water system development charges for this area and scope were assessed and paid under PRCTI20230447 review #5 called RESUB FOR REVISION (1) - 10/6/2023 - ADDITION OF (1) LAB SINK, (1) HAND SINK AND (2) FLOOR SINKS IN THE TEST LAB. [Yianni Charitou @ 10/23/2024 9:06 AM] The PRCTI20221916 sewer system development charges for the powder coating booth and manufacturing area were deferred until the manufacturing discharge was formally connected to the municipal sewer system. As a condition of civil construction permit PRCCP20241039 that would authorize the sewer connection, the $865.40 sewer system development charge was assessed on this building permit to avoid a separate utility connection permit. See email with subject line: RE: PRCTI20221916 Powder Coating. [Yianni Charitou @ 10/23/2024 1:46 PM]
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Until the City approves the pre-treatment facilities under PRCCP20241039, the manufacturing process water shall be pumped and hauled off site for treatment. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. - Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
09/19/2024 Report STRUCTURAL CALCS - Enviro Chamber Framing - Supplemental Calcs - 2023-10-25
09/19/2024 Report STRUCTURAL CALCS - Enviro Chamber Framing Re-Use 2023-08-08 (NOT FOR PERMIT ISSUANCE)
09/30/2024 Receipt Receipt for transaction:2024-002048
10/24/2024 Form Application_Red Dot Shop TI - TEST LAB AREA (Flattened)
10/24/2024 Plans ConstructionPlanSet_Red Dot Shop TI - TEST LAB AREA 24-0823 (Flattened)
10/24/2024 Letter Permit Review Correction Letter
10/24/2024 Report StructuralCalcs_Red Dot Shop TI - Re-Used Mezzanine 2024-08-16 (Flattened)