Summary

PRCTI20250324
Commercial - Tenant Improvement/Remodel
Permit(s) Issued
BCC PUYALLUP LLC
Alteration/Remodel
Commercial tenant improvement to existing 50,767 sf space - COP ~ PUBLIC SAFETY BUILDING
03/04/2025
05/05/2025
11/01/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 05/05/2025 04/28/2025
Building Review Approved 05/05/2025 04/25/2025
Fire Review Approved 05/05/2025 04/24/2025
Engineering Review Approved 05/05/2025 04/23/2025
Engineering Traffic Review Approved 05/05/2025 04/22/2025
Building Review Failed 04/24/2025 04/18/2025
Engineering Review Approved 04/24/2025 04/17/2025
Engineering Traffic Review Approved 04/24/2025 04/15/2025
Planning Review Approved 04/24/2025 04/14/2025
Fire Review Approved 04/24/2025 04/14/2025
Engineering Review Approved 04/07/2025 04/01/2025
Building Review Failed 04/07/2025 03/31/2025
Fire Review Approved 04/07/2025 03/27/2025
Planning Review Approved 04/07/2025 03/24/2025
Engineering Traffic Review Approved 04/07/2025 03/13/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 05/05/2025
AC Unit Fee $78.20 $78.20 Paid 05/05/2025
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $35.95 $35.95 Paid 05/05/2025
Exhaust Vent Fan (Bath) Fee $14.10 $14.10 Paid 05/05/2025
Gas Piping (Mechanical) Fee $6.30 $6.30 Paid 03/04/2025
Building Permit Fee $29,833.80 $29,833.80 Paid 05/05/2025
Mechanical Permit Fee $40.00 $40.00 Paid 05/05/2025
Drinking Fountain, Water Cooler, Ice Machine Fee $80.50 $80.50 Paid 05/05/2025
Plumbing Permit Fee $40.00 $40.00 Paid 05/05/2025
Plumbing Fixtures Fee $377.00 $377.00 Paid 05/05/2025
Water Heater Fee $13.00 $13.00 Paid 05/05/2025
Building Plan Review Fee $19,391.97 $19,391.97 Paid 03/04/2025
Mechanical Plan Review Fee $113.46 $113.46 Paid 03/04/2025
Plumbing Plan Review Fee $331.83 $331.83 Paid 03/04/2025
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 05/05/2025
Mechanical Duct Work Fee $24.00 $24.00 Paid 05/05/2025
Water System Development ChargeFee - Tenant Improvment/Addition $13,726.74 $13,726.74 Paid 05/05/2025
Sewer System Development ChargeFee - Tenant Improvment/Addition $22,617.77 $22,617.77 Paid 05/05/2025
Resubmittal Fee $180.00 $180.00 Paid 04/02/2025
Resubmittal Fee $180.00 $180.00 Paid 05/05/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Pending
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Roof Sheathing Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Exit Lighting Test Inspection Pending
David Drake ((253) 864-4171)
Re-Roof Inspection Pending
Shannon King ((253) 840-6684)
Hydronic Piping Inspection Pending
Shannon King ((253) 840-6684)
Gas Test Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Carbon Monoxide Detectors Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust Hood Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Shower Pan Inspection Pending
Shannon King ((253) 840-6684)
Medical Gas Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • Separate permits required for Fire Alarm, Fire Sprinkler, and DAS • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final. • In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Ready to Issue - Need Business License Endorsement Resolved Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Fire Sprinkler Protection System Water Service and Backflow Protection Device Open Prior to Completion
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
PRCTI20250324 shall not be issued until associated civil application PRCCP20250372 is approved. TI issuance has been approved before civil issuance - see docs and images

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20250117 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCCP20250372 In Plan Check Civil Construction Permit
PLPRE20240085 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
03/04/2025 Receipt Receipt for transaction:2025-000441
04/02/2025 Receipt Receipt for transaction:2025-000640
04/29/2025 Form ENERGY CODE WORKSHEET (Stamped)
04/29/2025 Other LIGHTING REQUIREMENTS (Stamped)
04/29/2025 Report STRUCTURAL CALCS (Stamped)
04/29/2025 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
04/29/2025 Form PLUMBING FIXTURE WORKSHEET (Stamped)
04/29/2025 Other PROJECT SPECIFICATION SET (Stamped)
04/29/2025 Other STORM DRAINAGE REPORT (Stamped)
05/05/2025 Receipt Receipt for transaction: 2025-000871
05/05/2025 Permit Permit - Detailed
05/05/2025 Letter Permit Job Card


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.