PRCTI20251049
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $13,788.13 | $13,788.13 | Paid | 08/28/2025 |
Mechanical Plan Review Fee | $144.24 | $144.24 | Paid | 08/28/2025 |
Plumbing Plan Review Fee | $242.78 | $242.78 | Paid | 08/28/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 09/22/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
Exhaust Hood, With Make Up Air - Commercial Fee | $143.80 | $0.00 | Not payable | Not Paid |
Mechanical Duct Work Fee | $24.00 | $0.00 | Not payable | Not Paid |
Unclassified Appliance or Equipment Fee | $14.10 | $0.00 | Not payable | Not Paid |
Building Permit Fee | $21,212.50 | $0.00 | Not payable | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Gas Piping (Plumbing) Fee | $8.50 | $0.00 | Not payable | Not Paid |
Plumbing Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Grease Trap or Interceptor Fee | $13.00 | $0.00 | Not payable | Not Paid |
Plumbing Fixtures Fee | $312.00 | $0.00 | Not payable | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | Not payable | Not Paid |
Water System Development ChargeFee - Tenant Improvment/Addition | $2,528.61 | $0.00 | Not payable | Not Paid |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $13,614.58 | $0.00 | Not payable | Not Paid |
Totals: | $52,596.24 | $14,355.15 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down.
• Fire extinguishers required per code
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Open | Standard Conditions |
Development & Permitting Services
No garbage disposals shall be installed in any commercial kitchen areas. (PMC 14.06)
|
Reference Number | Status | Type |
---|---|---|
PRCTI20250548 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20250558 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRAMR20251080 | Closed | Alternative Methods / Materials Request |
PRFS20251125 | Permit(s) Issued | Fire Sprinklers |
PRFA20251154 | In Plan Check | Fire Alarms |
PLPRE20250019 | File Closed | Pre-Application |
Date Uploaded | File Type | Name |
---|---|---|
08/04/2025 | Form | APPLICATION |
08/04/2025 | Letter | Incomplete Submittal Notice |
08/28/2025 | Receipt | Receipt for transaction: 2025-001703 |
09/09/2025 | Letter | Permit Review Correction Letter |
09/09/2025 | Plans | MultiCare Kitchen Expansion Phase 2 - Construction Set (Flattened) |
09/09/2025 | Form | PRCTI202251049_Energy Code Worksheet (Flattened) |
09/09/2025 | Report | STRUCT CALCS (Flattened) |
09/09/2025 | Form | PLUMB FIXTURE WORKSHEET (Flattened) |
09/09/2025 | Report | MultiCare Kitchen Expansion - Frontage Improvement Scope (Flattened) |
09/22/2025 | Receipt | Receipt for transaction:2025-001847 |