CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20250558
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 06/18/2025 |
Mechanical Duct Work Fee | $14.10 | $14.10 | Paid | 06/18/2025 |
Ventilation System (apart from Heating/AC) Fee | $14.10 | $14.10 | Paid | 06/18/2025 |
Building Permit Fee | $1,301.75 | $1,301.75 | Paid | 06/18/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 06/18/2025 |
Building Plan Review Fee | $846.14 | $846.14 | Paid | 06/05/2025 |
Mechanical Plan Review Fee | $44.33 | $44.33 | Paid | 06/05/2025 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 06/18/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $2,550.42 | $2,550.42 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Pending | |||
Comment Building Div Inspection | Pending | |||
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Foundation/Rebar Inspection | Pending | |||
Underfloor Inspection | Pending | |||
Slab/Insulation Inspection | Pending | |||
Block Wall Rebar Inspection | Pending | |||
Shear Wall Inspection | Pending | |||
Firewall/Firestop Inspection | Pending | |||
Energy (Insulation) Inspection | Pending | |||
Frame Inspection | Pending | |||
Ceiling Grid/T-Bar Inspection | Pending | |||
Wallboard / Drywall Inspection | Pending | |||
Re-Roof Inspection | Pending | |||
Gas Test Inspection | Pending | |||
Mechanical Rough In Inspection | Pending | |||
Refrigeration Line Test Inspection | Pending | |||
Exhaust/Vent Fans Inspection | Pending | |||
Fire Or Smoke Damper Inspection | Pending | |||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
Emergency Radio Test Review Inspection | Pending | |||
Engineering Final Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
Mechanical Final Inspection | Pending | |||
Building Final Inspection | Pending | |||
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection.
• In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
Reference Number | Status | Type |
---|---|---|
PRCTI20250548 | Returned for Correction | Commercial - Tenant Improvement/Remodel |
PRCTI20251049 | Submittals Incomplete | Commercial - Tenant Improvement/Remodel |
PLPRE20250019 | File Closed | Pre-Application |
Date Uploaded | File Type | Name |
---|---|---|
06/05/2025 | Receipt | Receipt for transaction: 2025-001077 |
06/10/2025 | Plans | CONSTRUCTION PLAN SET (PHASE 0) (Stamped) |
06/18/2025 | Receipt | Receipt for transaction: 2025-001194 |
06/18/2025 | Permit | Permit - Detailed |
06/18/2025 | Letter | Permit Job Card |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView
