Permit Application Status
PRCTI20250548
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Backflow Preventor Fee | $650.00 | $650.00 | Paid | 06/05/2025 |
Building Plan Review Fee | $29,135.83 | $29,135.83 | Paid | 06/05/2025 |
Mechanical Plan Review Fee | $98.85 | $98.85 | Paid | 06/05/2025 |
Plumbing Plan Review Fee | $694.36 | $694.36 | Paid | 06/05/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 08/05/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 08/05/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
Air Handling Unit (Over 10,000 cfm) Fee | $23.92 | $0.00 | Not payable | Not Paid |
Exhaust Hood, With Make Up Air - Commercial Fee | $35.95 | $0.00 | Not payable | Not Paid |
Mechanical Duct Work Fee | $24.00 | $0.00 | Not payable | Not Paid |
Unclassified Appliance or Equipment Fee | $14.10 | $0.00 | Not payable | Not Paid |
Ventilation System (apart from Heating/AC) Fee | $14.10 | $0.00 | Not payable | Not Paid |
Building Permit Fee | $44,824.35 | $0.00 | Not payable | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Plumbing Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $0.00 | Not payable | Not Paid |
Grease Trap or Interceptor Fee | $13.00 | $0.00 | Not payable | Not Paid |
Plumbing Fixtures Fee | $325.00 | $0.00 | Not payable | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | Not payable | Not Paid |
Sewer System Development Charge | $0.00 | $0.00 | Not payable | Not Paid |
Water Connection Fee | $0.00 | $0.00 | Not payable | Not Paid |
Water System Development Charge | $0.00 | $0.00 | Not payable | Not Paid |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $36,012.76 | $0.00 | Not payable | Not Paid |
Water System Development ChargeFee - Tenant Improvment/Addition | $9,211.37 | $0.00 | Not payable | Not Paid |
Totals: | $121,847.84 | $30,939.04 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
Fire Prevention
• Comply with 2021 IFC and 2021 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required contractor to provide light meter
• A separate permit may be required if fire alarm or sprinkler system is altered
• RTU’S will be required to be tested for shut down.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Frontage Improvements - Non-Residential Tenant Improvements | Open | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a right-of-way or civil construction permit issued. A right-of-way permit is required if there is existing vertical curb in good condition and a civil construction permit is required if there is no existing vertical curbing. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved.
In December 2024 a list of proposed frontage improvements was provided to the city (attached in documents and images) The City of Puyallup will require all items on the list be completed at this time. Refer to docs & images in CityView - document titled "Proposal kitchen frontage improvements"
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Development & Permitting Services
Prior to issuance, approval of non-standard grease interceptor must be obtained. Hydromechanical GI proposed indoors (building has concerns with poly material indoors / fire concerns & collections concerned about HGI efficacy) - standard is 750 gravity GI outdoors.
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Development & Permitting Services
PRCTI20250548 shall not be issued until requested AMR is reviewed and approved.
|
Reference Number | Status | Type |
---|---|---|
PRCTI20250558 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20251049 | Submittals Incomplete | Commercial - Tenant Improvement/Remodel |
PLPRE20250019 | File Closed | Pre-Application |
Date Uploaded | File Type | Name |
---|---|---|
04/25/2025 | Letter | Incomplete Application Notice |
06/05/2025 | Receipt | Receipt for transaction: 2025-001076 |
06/13/2025 | Letter | Permit Review Correction Letter |
06/13/2025 | Form | Building Permit Application_Phase 1_signed (Flattened) |
06/13/2025 | Report | STRUCTURAL CALCULATIONS (Flattened) |
06/13/2025 | Form | City of Puyallup Plumbing Fixture Worksheet_PRCTI20250548 (Flattened) |
06/16/2025 | PROPOSAL Kitchen Frontage Improvements (GSH) | |
07/25/2025 | Form | Multicare GSH Grease Interceptor Fire Protection AHJ Assessment |
07/25/2025 | Form | CORRECTION RESPONSE LETTER |
08/05/2025 | Letter | Permit Review Correction Letter |
08/05/2025 | Report | MultiCare GSH Kitchen Expansion - Sheet Specifications (Flattened) |
08/05/2025 | Plans | CONSTRUCTION PLAN SET - RESUB (Flattened) |
08/05/2025 | Receipt | Receipt for transaction:2025-001544 |