CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
PRGR20230114
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Clear Fill and Grading Review Fee | $130.00 | $130.00 | Paid | 02/03/2023 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 02/03/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Engineering Inspection Fee (3%) | $0.00 | $0.00 | Not payable | Not Paid |
Clear Fill Grading Permit Fee | $190.00 | $0.00 | Not payable | Not Paid |
Civil Review Additional Fee | $540.00 | $0.00 | $540.00 | Not Paid |
Totals: | $1,060.00 | $330.00 | $540.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$540.00 Add Fees to My Cart
There are no inspections for this engineering permit application, or you are not authorized to view them.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Civil Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
Pre-Construction Meeting | Open | Engineering Division | Standard Conditions | ||
:
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
|
|||||
Performance Bond | Open | Engineering Division | Prior to Issuance | ||
:
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
|
|||||
Certificate of Insurance/CG2012 | Open | Engineering Division | Prior to Issuance | ||
:
Certificate or Insurance/CG2012 must be received prior to issuance
|
|||||
Clear, Fill, and Grade Bond | Open | Engineering Division | Prior to Issuance | ||
:
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
|
|||||
Miscellaneous Condition | Open | Engineering Division | Prior to Occupancy | ||
:
Implement the protections and Best Management Practices directed by the Mitigation Plan. City inspector to verify under this permit.
|
|||||
Critical Area Boundary Marking | Open | Planning Division | Prior to Completion | ||
:
Critical Area Boundary Marking: The boundary of all critical area buffers must be posted with the appropriate permanent signage provided by the City. The signage must be permanently staked in the ground and spaced every 50’ around the buffer edge.
|
|||||
Miscellaneous Condition | Open | Planning Division | Standard Conditions | ||
:
The approval of this clear, fill, and grade permit (PRGR20230114) is to retroactively address previously unpermitted clear, fill, and grade work onsite. This site cannot be used for outdoor storage, truck parking, and other related uses as a part of this permit approval. The use of the site remains a single-family residential use through the approval of this permit.
|
Reference Number | Status | Type |
---|---|---|
PLSSP20230011 | Waiting for Conditions | SEPA Standalone |
PLPSP20240046 | Waiting for Revisions | Preliminary Site Plan |
Date Uploaded | File Type | Name |
---|---|---|
02/03/2023 | Form | APL Properties C & G Application Form |
02/03/2023 | Other | APL Properties Cost Estimate Memo |
02/03/2023 | Report | APL Properties Geotech Report |
02/03/2023 | Plans | APL Properties TESC Plan |
02/03/2023 | Receipt | Receipt for transaction:2023-000164 |
03/16/2023 | Plans | APL Properties Critical Areas Report Checklist - Mitigation Plans |
03/16/2023 | Plans | APL Properties Mitigation Plan |
04/06/2023 | PRGR20230114 - Confluence APL Todd Rd 3rd party review_040623 | |
04/12/2023 | Report | APL Properties Critical Area Report (Flattened) |
04/12/2023 | Plans | APL Properties Plan Set (Flattened) |
04/12/2023 | Plans | APL Properties Site Plan (Flattened) |
04/12/2023 | Report | APL Properties Stormwater Report (Flattened) |
04/12/2023 | Report | APL Properties SWPPP (Flattened) |
04/12/2023 | Letter | Permit Review Correction Letter |
04/12/2023 | Letter | Permit Review Correction Letter |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.