CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRGR20230876


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRGR20230876
Clear, Fill, & Grade Permit
Closed
PFHC-PUYALLUP LLC
Other
Create offsite parking and temporary material laydown~ HAMPTON INN PARKING B-20-0078 E-20-0052
06/13/2023
08/15/2023
12/10/2024
06/13/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 08/01/2023 07/18/2023
Engineering Civil Review Approved 08/01/2023 07/14/2023
Engineering Traffic Review Approved 08/01/2023 07/12/2023
Fire Review Approved 08/01/2023 07/11/2023
Public Works Collection Review VOID 08/01/2023 07/11/2023
Public Works Streets Review VOID 08/01/2023 07/11/2023
Public Works Water Review VOID 08/01/2023 07/11/2023
Engineering Civil Review Approved 08/01/2023 06/30/2023
Planning Review Failed 08/01/2023 06/30/2023
Fire Review Approved 08/01/2023 06/26/2023
Engineering Traffic Review Approved 08/01/2023 06/23/2023
Public Works Streets Review VOID 08/01/2023 06/22/2023
Public Works Collection Review VOID 08/01/2023 06/21/2023
Public Works Water Review VOID 08/01/2023 06/21/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Civil Review Fee $470.00 $470.00 Paid 06/16/2023
Record Drawing Review Fee $200.00 $200.00 Paid 06/16/2023
Stormwater Report Review Fee $360.00 $360.00 Paid 06/16/2023
Clear Fill and Grading Review Fee $40.00 $40.00 Paid 08/15/2023
$510.00
Clear Fill Grading Permit Fee $190.00 $190.00 Paid 08/15/2023
Engineering Inspection Fee (3%) $349.92 $349.92 Paid 08/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Preconstruction Inspection (Pre-Con Meeting) VOID 08/15/2023
Robyn Buck ((253) 435-3617)
Job Start Inspection Partial Pass 9/28/2023 09/28/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/2/2023 10/02/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/3/2023 10/03/2023
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Passed w/ Conditions 10/04/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/4/2023 10/04/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/6/2023 10/06/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/5/2023 12/05/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/6/2023 12/06/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/7/2023 12/07/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/18/2023 12/18/2023
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/19/2023 12/19/2023
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Partial Pass 1/9/2024 01/09/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/11/2024 01/11/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/31/2024 01/31/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/1/2024 03/01/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/2/2024 04/02/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/3/2024 04/03/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/4/2024 04/04/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/5/2024 04/05/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/8/2024 04/08/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/9/2024 04/09/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/10/2024 04/11/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/11/2024 04/11/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/12/2024 04/12/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/15/2024 04/15/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/16/2024 04/16/2024
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Resolved Engineering Division Standard Conditions
: Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Performance Bond Resolved Engineering Division Prior to Issuance
: A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Certificate of Insurance/CG2012 Resolved Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond Resolved Engineering Division Prior to Issuance
: A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
General Permit Conditions Open Traffic Division Standard Conditions
: PERMIT CONDITIONS: 1. 17th AVE SE may not be blocked by vehicle/equipment or material staging for the Hampton Inn project. 2. The south side of 17th should not be used for parking of vehicles or equipment. 3. All incoming material deliveries must be off loaded on site without disruption to S Meridian or 17th AVE SE. 4. Material/Equipment transfer between sites should not use S Meridian 5. At the discretion of site inspector, track-out must be properly mitigated.
Overtime Inspection and Watermain Shutdown Fee Resolved Engineering Division Prior to Issuance
: This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Miscellaneous Condition Resolved Development & Permitting Services Prior to Issuance
: INADVERTENT DISCOVERY PLAN SIGNATURE PAGE

Related Permit & Planning Applications

Reference Number Status Type
B-20-0078 Permit(s) Issued Commercial - New Construction
E-20-0052 Permit(s) Issued Civil Construction Permit
PRFS20231302 Permit(s) Issued Fire Sprinklers
PRRWF20240597 Permit(s) Issued Retaining Wall

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.