CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRMU20260421
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Building Plan Review Fee | $48,723.19 | $48,723.19 | Paid | 04/24/2026 |
| Plumbing Plan Review Fee | $5,746.65 | $5,746.65 | Paid | 04/24/2026 |
| Mechanical Plan Review Fee | $4,504.89 | $4,504.89 | Paid | 04/24/2026 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
| Planning Landscape Review Fee | $300.00 | $0.00 | Not payable | Not Paid |
| Exhaust Vent Fan (Bath) Fee | $1,748.40 | $0.00 | Not payable | Not Paid |
| Building Permit Fee | $74,958.75 | $0.00 | Not payable | Not Paid |
| Planning Building Permit Fee | $120.00 | $0.00 | Not payable | Not Paid |
| Plumbing Fixtures Fee | $7,475.00 | $0.00 | Not payable | Not Paid |
| Plumbing Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
| Water Heater Fee | $1,326.00 | $0.00 | Not payable | Not Paid |
| Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
| WA State Building Code Council Fee (Residential) | $204.50 | $0.00 | Not payable | Not Paid |
| Traffic Impact Fee (Commercial) | $108,450.00 | $0.00 | Not payable | Not Paid |
| Park Impact Fee | $209,502.08 | $0.00 | Not payable | Not Paid |
| Water System Development Charge Fee - Tenant Improvment/Addition | $5,521.00 | $0.00 | Not payable | Not Paid |
| Sewer System Development Charge | $505,107.10 | $0.00 | Not payable | Not Paid |
|
$511,819.49
|
||||
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $6,712.39 | $0.00 | Not payable | Not Paid |
| Water System Development Charge | $415,455.25 | $0.00 | Not payable | Not Paid |
|
$420,976.25
|
||||
| Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $1,998.20 | $0.00 | Not payable | Not Paid |
| Mechanical Duct Work Fee | $3,144.00 | $0.00 | Not payable | Not Paid |
|
$24.00
|
||||
| Ventilation System (apart from Heating/AC) Fee | $1,438.20 | $0.00 | Not payable | Not Paid |
|
$0.00
|
||||
| Resubmittal/Revision Fee | $180.00 | $0.00 | $180.00 | Not Paid |
| Totals: | $1,402,960.60 | $58,974.73 | $180.00 | |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$180.00 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Engineering Commercial Standard Conditions | Open | Standard Conditions |
|
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control.
- Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow.
- Steps shall be taken to prevent drainage onto adjacent lots.
- All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District.
- Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection.
- Water meter box grade may have to be adjusted, at owners’ expense, due to the grade of the proposed driveway.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
(For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums.
(For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade).
- Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)).
- If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities.
- No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
- No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
|
||
| Ready to Issue - Need School District Letter | Open | Prior to Issuance |
|
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid.
|
||
| Ready to Issue - Need Contractor Info | Open | Prior to Issuance |
|
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
| Ready to Issue - Need Business License Endorsement | Open | Prior to Issuance |
|
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Development & Permitting Services
PRCCP20260425 must be approved before PRMU20260421 can be approved and issued. It is the applicants responsibility to ensure PRMU20260421 matches the approved civil plans to avoid redundant reviews.
|
||
| Backflow Protection Device - Commercial RPBA | Open | Prior to Completion |
|
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
| Miscellaneous Condition | Open | Prior to Issuance |
|
Development & Permitting Services
Puyallup Municipal Code Chapter 19.06.020 provides specific and mandatory circumstances under which contiguous parcels must be combined as a condition of development plan approval. These include situations where an existing or proposed structure extends over a property line, where contiguous parcels share common facilities without existing easements or legal instruments, or where parcels need a boundary line adjustment or lot combination to meet city development requirements. According to the submitted development plans, contiguous parcels share such common facilities and a recorded lot combination is required. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument, of which the City must review and approve prior to recording, for the continuous ownership, use, and maintenance of the common facilities.
|
||
| Date Uploaded | File Type | Name |
|---|---|---|
| 03/20/2026 | Form | APPLICATION FORM |
| 03/24/2026 | Other | Early Submittal FINAL Signed Bell Place PLPSP20250082 032426 |
| 03/24/2026 | Letter | Incomplete Submittal Notice |
| 04/22/2026 | Letter | Incomplete Submittal Notice |
| 04/24/2026 | Receipt | Receipt for transaction:2026-000733 |
| 05/26/2026 | Letter | Permit Review Correction Letter |
| 05/26/2026 | Plans | SitePlan-Bell Place (Flattened) |
| 05/26/2026 | Plans | ConstructionPlanSet-Bell Place (Flattened) |
| 05/26/2026 | Report | StructuralCalculations-Bell Place (Flattened) |
| 05/26/2026 | Report | ConstSWPPP_v1-Bell Place (Flattened) |
| 05/26/2026 | Other | TrafficScoping-AOB Bell (Flattened) |
| 05/26/2026 | Form | Plumbing fixture worksheet_Bell (Flattened) |