Review Type
Outcome
Est. Completion Date
Completed
Planning Review
No Comments
04/13/2026
03/24/2026
Reviewer:
Building Review
No Comments
04/13/2026
03/24/2026
Reviewer:
Engineering Traffic Review
VOID
03/06/2026
02/09/2026
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
The City is actively reviewing the Traffic Impact Analysis for this project (Submitted via email 1/5/26). The City will coordinate directly with the applicant's traffic engineer to resolve any corrections prior to the next submittal.
Provide detailed sight distance analysis at driveway location & W Pioneer/4th St SW & W Meeker/4th St SW per City standards. Identify any obstructions that may impact entering sight distance triangle.
Correction 2:
See Document Markup
Comments:
To safely accommodate additional vehicle trips at this intersection, the City may require minor restriping of 5th St SW & W Meeker to allow a center TWLTL or SBL turn pocket. This will allow safer and more efficient ingress/egress. Additional coordination needed with applicant's traffic engineer.
Correction 3:
See Document Markup
Comments:
It is assumed the existing 4hr parking restriction to remain along the W Meeker frontage.
Correction 4:
See Document Markup
Comments:
Identify existing tree located in this area.
Correction 5:
See Document Markup
Comments:
Show existing curb/radius and in this area to verify alignment with new W Meeker frontage.
Correction 6:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included improvements in this short segment of W Meeker to accommodate pedestrian connectivity between the new W Meeker frontage and 5th St SW. Currently, there is a ~50ft gap between ADA accessible improvements
Correction 7:
See Document Markup
Comments:
Pierce Transit bus STOP improvements will be installed at the West Pioneer and 5th St SW. Puyallup staff will coordinate with Pierce Transit to determine the scope and specific locations of improvements.
Correction 8:
See Document Markup
Comments:
Back of sidewalk located on private property.
Correction 9:
See Document Markup
Comments:
Show preliminary locations of City Standards streetlights along all frontage (Pioneer, 4th St SW, Meeker)
Correction 10:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 5.5ft sidewalk along the entire W Pioneer frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 11:
See Document Markup
Comments:
3.5ft of sidewalk between ROW and back of planter box
Correction 12:
See Document Markup
Comments:
Missing landscaping cutout
Correction 13:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 20ft half-street width along the entire W Pioneer frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 14:
See Document Markup
Comments:
Pending sight distance analysis, City may require modification of landscaping near the intersection to minimize sight distance impacts. Additional coordination needed prior to resubmittal.
Correction 15:
See Document Markup
Comments:
ADA ramp/landing encroaching into private property
Correction 16:
See Document Markup
Comments:
City standards require 25ft minimum curb radius
Correction 17:
See Document Markup
Comments:
Need to verify the proposed W Pioneer curb alignment matches existing. Show existing infrastructure in this area
Correction 18:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 4.5ft planter strip and 5ft sidewalk along the entire 4th St SW frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 19:
See Document Markup
Comments:
Need to verify W Meeker face of curb alignment (offset) matches existing on the east side of 4th St SW. Show existing infrastructure in this area
Correction 20:
See Document Markup
Comments:
City standards require 25ft minimum curb radius
Correction 21:
See Document Markup
Comments:
ADA landing encroaching into private property
Correction 22:
See Document Markup
Comments:
Need to verify 4th St SW face of curb alignment (offset) matches existing on the north side of W Meeker.
Show existing infrastructure in this area
Correction 23:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 4.5ft planter strip and 5ft sidewalk along the entire W Meeker frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 24:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 20ft half-street width to align face of curb with existing. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 25:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included a City standard 30-foot commercial driveway. Additionally, building allowed for clear sight lines (thru building) on either side of vehicle opening @ W Meeker. This will provide improved visibility for exiting vehicles & approaching pedestrians (using sidewalk). Please coordinate with the City to resolve scope of this improvement prior to resubmittal.
Engineering Review
VOID
03/06/2026
02/09/2026
Reviewer:
Corrections:
Correction 1:
See Document Markup
Comments:
The direct discharge is permitted by the Washington State Department of Ecology when certain circumstances exist. The city is not making an exemption for this project.
Correction 2:
See Document Markup
Comments:
These assertions are incorrect and are probably referring to the AOB project. Revise.
Correction 3:
See Document Markup
Comments:
Reference the SWMMWW's direct discharge provision to avoid the appearance of not meeting the manual requirements or preferential deals.
Correction 4:
See Document Markup
Comments:
Civil Construction Permit. A ROW permit is inherent to the civil.
Correction 5:
See Document Markup
Comments:
For civil submittal do not run the vault simulation. Section titles still say AOB.
Correction 6:
See Document Markup
Comments:
Storm pipe location is likely not feasible because of very large tree. Improve survey and show all surface features and existing utilities. Consider connecting new storm line to storm system at 5th St SW and W Pioneer or at 4th St SW and W Pioneer. Show existing storm system on 4th St SW and 5th St SW and all other existing utilities in project area. City can provide detailed utility maps if needed.
Correction 7:
See Document Markup
Comments:
Confirm one catch basin for underground parking area is sufficient.
Correction 8:
See Document Markup
Comments:
These street patches are not to city standard. Review and adhere to detail 01.01.20 for restoration in the public roadway. Areas of full depth restoration shall count toward replaced PGHS stormwater thresholds while areas of grind and overlay will be considered like for like.
Correction 9:
See Document Markup
Comments:
Extend water replacement east to end of 10 inch cast iron pipe (approximately 230 feet). Connect to 12-inch ductile iron pipe in Pioneer adjacent to AOB project.
Correction 10:
Other/Miscellaneous
Comments:
City of Puyallup Design Standards 204.2(3) stipulate that for projects considering direct discharge to the Puyallup River, conveyance capacity shall be determined by the 25-year storm event AND the corresponding river elevations at the specific river outfall. These elevations shall be incorporated into the analysis.
Fire Review
VOID
03/06/2026
02/09/2026
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
1. Provide a fire aerial apparatus site plan that shows the following: All on street parking spots that will be created. Painted curb areas in front of Fire Hydrants, FDC's, Emergency Loading Zone, and garage entrance.
Building Review
VOID
03/06/2026
02/09/2026
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
Provide a building area calculation. Include all areas classifications for all spaces.
Engineering Traffic Review
Comments
01/16/2026
01/16/2026
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
The City is actively reviewing the Traffic Impact Analysis for this project (Submitted via email 1/5/26). The City will coordinate directly with the applicant's traffic engineer to resolve any corrections prior to the next submittal.
Provide detailed sight distance analysis at driveway location & W Pioneer/4th St SW & W Meeker/4th St SW per City standards. Identify any obstructions that may impact entering sight distance triangle.
Correction 2:
See Document Markup
Comments:
To safely accommodate additional vehicle trips at this intersection, the City may require minor restriping of 5th St SW & W Meeker to allow a center TWLTL or SBL turn pocket. This will allow safer and more efficient ingress/egress. Additional coordination needed with applicant's traffic engineer.
Correction 3:
See Document Markup
Comments:
It is assumed the existing 4hr parking restriction to remain along the W Meeker frontage.
Correction 4:
See Document Markup
Comments:
Identify existing tree located in this area.
Correction 5:
See Document Markup
Comments:
Show existing curb/radius and in this area to verify alignment with new W Meeker frontage.
Correction 6:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included improvements in this short segment of W Meeker to accommodate pedestrian connectivity between the new W Meeker frontage and 5th St SW. Currently, there is a ~50ft gap between ADA accessible improvements
Correction 7:
See Document Markup
Comments:
Pierce Transit bus STOP improvements will be installed at the West Pioneer and 5th St SW. Puyallup staff will coordinate with Pierce Transit to determine the scope and specific locations of improvements.
Correction 8:
See Document Markup
Comments:
Back of sidewalk located on private property.
Correction 9:
See Document Markup
Comments:
Show preliminary locations of City Standards streetlights along all frontage (Pioneer, 4th St SW, Meeker)
Correction 10:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 5.5ft sidewalk along the entire W Pioneer frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 11:
See Document Markup
Comments:
3.5ft of sidewalk between ROW and back of planter box
Correction 12:
See Document Markup
Comments:
Missing landscaping cutout
Correction 13:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 20ft half-street width along the entire W Pioneer frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 14:
See Document Markup
Comments:
Pending sight distance analysis, City may require modification of landscaping near the intersection to minimize sight distance impacts. Additional coordination needed prior to resubmittal.
Correction 15:
See Document Markup
Comments:
ADA ramp/landing encroaching into private property
Correction 16:
See Document Markup
Comments:
City standards require 25ft minimum curb radius
Correction 17:
See Document Markup
Comments:
Need to verify the proposed W Pioneer curb alignment matches existing. Show existing infrastructure in this area
Correction 18:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 4.5ft planter strip and 5ft sidewalk along the entire 4th St SW frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 19:
See Document Markup
Comments:
Need to verify W Meeker face of curb alignment (offset) matches existing on the east side of 4th St SW. Show existing infrastructure in this area
Correction 20:
See Document Markup
Comments:
City standards require 25ft minimum curb radius
Correction 21:
See Document Markup
Comments:
ADA landing encroaching into private property
Correction 22:
See Document Markup
Comments:
Need to verify 4th St SW face of curb alignment (offset) matches existing on the north side of W Meeker.
Show existing infrastructure in this area
Correction 23:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 4.5ft planter strip and 5ft sidewalk along the entire W Meeker frontage. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 24:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included 20ft half-street width to align face of curb with existing. Please coordinate with the City to resolve scope of frontage improvement prior to resubmittal.
Correction 25:
See Document Markup
Comments:
Approval conditions of the previous preliminary site plan included a City standard 30-foot commercial driveway. Additionally, building allowed for clear sight lines (thru building) on either side of vehicle opening @ W Meeker. This will provide improved visibility for exiting vehicles & approaching pedestrians (using sidewalk). Please coordinate with the City to resolve scope of this improvement prior to resubmittal.
Engineering Review
Comments
01/16/2026
01/13/2026
Reviewer:
Corrections:
Correction 1:
See Document Markup
Comments:
The direct discharge is permitted by the Washington State Department of Ecology when certain circumstances exist. The city is not making an exemption for this project.
Correction 2:
See Document Markup
Comments:
These assertions are incorrect and are probably referring to the AOB project. Revise.
Correction 3:
See Document Markup
Comments:
Reference the SWMMWW's direct discharge provision to avoid the appearance of not meeting the manual requirements or preferential deals.
Correction 4:
See Document Markup
Comments:
Civil Construction Permit. A ROW permit is inherent to the civil.
Correction 5:
See Document Markup
Comments:
For civil submittal do not run the vault simulation. Section titles still say AOB.
Correction 6:
See Document Markup
Comments:
Storm pipe location is likely not feasible because of very large tree. Improve survey and show all surface features and existing utilities. Consider connecting new storm line to storm system at 5th St SW and W Pioneer or at 4th St SW and W Pioneer. Show existing storm system on 4th St SW and 5th St SW and all other existing utilities in project area. City can provide detailed utility maps if needed.
Correction 7:
See Document Markup
Comments:
Confirm one catch basin for underground parking area is sufficient.
Correction 8:
See Document Markup
Comments:
These street patches are not to city standard. Review and adhere to detail 01.01.20 for restoration in the public roadway. Areas of full depth restoration shall count toward replaced PGHS stormwater thresholds while areas of grind and overlay will be considered like for like.
Correction 9:
See Document Markup
Comments:
Extend water replacement east to end of 10 inch cast iron pipe (approximately 230 feet). Connect to 12-inch ductile iron pipe in Pioneer adjacent to AOB project.
Correction 10:
Other/Miscellaneous
Comments:
City of Puyallup Design Standards 204.2(3) stipulate that for projects considering direct discharge to the Puyallup River, conveyance capacity shall be determined by the 25-year storm event AND the corresponding river elevations at the specific river outfall. These elevations shall be incorporated into the analysis.
Fire Review
Comments
01/16/2026
01/12/2026
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
1. Provide a fire aerial apparatus site plan that shows the following: All on street parking spots that will be created. Painted curb areas in front of Fire Hydrants, FDC's, Emergency Loading Zone, and garage entrance.
Building Review
Comments
01/16/2026
12/31/2025
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
Provide a building area calculation. Include all areas classifications for all spaces.
Planning Review
No Comments
01/16/2026
12/29/2025
Reviewer:
Planning Review
VOID
11/26/2025
10/30/2025
Reviewer:
Building Review
VOID
11/26/2025
10/30/2025
Reviewer:
Fire Review
VOID
11/26/2025
10/30/2025
Reviewer:
Engineering Review
VOID
11/26/2025
10/30/2025
Reviewer:
Corrections:
Correction 1:
See Document Markup
Comments:
The direct discharge is permitted by the Washington State Department of Ecology when certain circumstances exist. The city is not making an exemption for this project.
Correction 2:
See Document Markup
Comments:
These assertions are incorrect and are probably referring to the AOB project. Revise.
Correction 3:
See Document Markup
Comments:
Reference the SWMMWW's direct discharge provision to avoid the appearance of not meeting the manual requirements or preferential deals.
Correction 4:
See Document Markup
Comments:
Civil Construction Permit. A ROW permit is inherent to the civil.
Correction 5:
See Document Markup
Comments:
For civil submittal do not run the vault simulation. Section titles still say AOB.
Correction 6:
See Document Markup
Comments:
Storm pipe location is likely not feasible because of very large tree. Improve survey and show all surface features and existing utilities. Consider connecting new storm line to storm system at 5th St SW and W Pioneer or at 4th St SW and W Pioneer. Show existing storm system on 4th St SW and 5th St SW and all other existing utilities in project area. City can provide detailed utility maps if needed.
Correction 7:
See Document Markup
Comments:
Confirm one catch basin for underground parking area is sufficient.
Correction 8:
See Document Markup
Comments:
These street patches are not to city standard. Review and adhere to detail 01.01.20 for restoration in the public roadway. Areas of full depth restoration shall count toward replaced PGHS stormwater thresholds while areas of grind and overlay will be considered like for like.
Correction 9:
See Document Markup
Comments:
Extend water replacement east to end of 10 inch cast iron pipe (approximately 230 feet). Connect to 12-inch ductile iron pipe in Pioneer adjacent to AOB project.
Correction 10:
Other/Miscellaneous
Comments:
City of Puyallup Design Standards 204.2(3) stipulate that for projects considering direct discharge to the Puyallup River, conveyance capacity shall be determined by the 25-year storm event AND the corresponding river elevations at the specific river outfall. These elevations shall be incorporated into the analysis.
Engineering Traffic Review
VOID
11/26/2025
10/30/2025
Reviewer:
Fire Review
Pending
04/13/2026
Reviewer:
Engineering Review
Pending
04/13/2026
Reviewer:
Engineering Traffic Review
Pending
04/13/2026
Reviewer: