Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $335.25 | $335.25 | Paid | 07/26/2022 |
Building Plan Review Fee | $217.91 | $217.91 | Paid | 05/03/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/26/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 06/06/2022 |
Traffic Impact Fee (Commercial) | $4,950.00 | $4,950.00 | Paid | 07/26/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 07/11/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $5,788.16 | $5,788.16 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Manufactured Or Modular Structure Setup | Failed | 8/3/2022 | 8/3/2022 | 08/03/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/03/2022
1.provide engineers fix or approval of slope of footing exceeding code
|
||||
Fire Final Inspection | Passed w/ Conditions | 08/27/2022 | ||
Ray Cockerham ((253) 841-5585) | ||||
Other/Miscellaneous
Outstanding
08/25/2022
Change building ID to match plans, electrical, fire alarm etc. P01
Fire Alarm Permit is OPEN ADD map at main panel (Portable Location) and summit bldg (FACP location).
Ray C
|
||||
Engineering Final Inspection | Failed | 8/31/2022 | 8/31/2022 | 08/31/2022 |
Michael Rosenau ((253) 344-6753) | ||||
Other/Miscellaneous
Resolved
09/02/2022
Downspouts on southside of building do not provide for flow away from the building.
|
||||
Plumbing Rough In Inspection | VOID | 09/07/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Residential Final Inspection | VOID | 09/07/2022 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
• A minimum of one 2a-10bc fire extinguisher is required in each room
• A fire alarm system is required
• A separate permit is required for fire alarm
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
Development Engineering standard commercial conditions
- Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet.
- Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Prior to Issuance | ||
: