CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRRF20230760


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRRF20230760
Re-Roof
Closed
Alteration/Remodel
Install new re-roof over roof section A2. FRED MEYER DISTRIBUTION CTR
05/30/2023
06/21/2023
04/15/2024
10/18/2023

Locations

Property
0420215004

Address
2200 N MERIDIAN, PUYALLUP, WA 98371

2200 North Meridian Street , Puyallup WA 98371

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/08/2023 06/06/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $2,393.75 $2,393.75 Paid 06/21/2023
Building Plan Review Fee $1,555.94 $1,555.94 Paid 05/30/2023
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 06/21/2023
Building Re-Inspection Fee $180.00 $180.00 Paid 09/20/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Roof Sheathing Inspection Not Ready 8/14/2023 8/14/2023 08/14/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/14/2023
1. no contact from contractor prior to 8:30 am 2.no one on site at time of inspection 11:05 am

Building Final Inspection Not Ready 8/24/2023 8/24/2023 08/24/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/24/2023
1.no one on site from roofing company at time of inspection 1:15 pm 2.no one made contact prior to 8:30 am to meet on site 3. not ready

Re-Roof Inspection Failed with Fee 9/13/2023 9/13/2023 09/14/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/14/2023
1. no one on site at time of inspection 1:10 pm 2. no contact from roofing contractor as previously discussed 3.talked to fred meyer representative at time of inspection he was not notified of pending inspection today 4.pay 180.00 reinspect fee prior to scheduling next inspection

Re-Roof Inspection Not Ready 9/25/2023 9/25/2023 09/25/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/25/2023
1. no one on site at time of inspection 1:10 pm 2. no contact from roofing contractor as previously discussed 3.talked to fred meyer representative at time of inspection he was not notified of pending inspection today 4.pay 180.00 reinspect fee prior to scheduling next inspection

Other/Miscellaneous
Carried Forward
09/25/2023
1. no one on site at time of inspection 11:25 am 2. called contractor he had to leave

Building Final Inspection Not Ready 9/27/2023 9/27/2023 09/27/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
09/27/2023
1.no one on site from roofing company at time of inspection 1:15 pm 2.no one made contact prior to 8:30 am to meet on site 3. not ready

Other/Miscellaneous
Carried Forward
09/27/2023
1. set up time to due core sample with inspector present as discussed with contractors 2. provide all warranties as discussed at time of next inspection 3. not ready

Re-Roof Inspection Not Ready 9/28/2023 9/28/2023 09/29/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
09/29/2023
1. no one on site at time of inspection 1:10 pm 2. no contact from roofing contractor as previously discussed 3.talked to fred meyer representative at time of inspection he was not notified of pending inspection today 4.pay 180.00 reinspect fee prior to scheduling next inspection

Other/Miscellaneous
Resolved
09/29/2023
1. no one on site at time of inspection 11:25 am 2. called contractor he had to leave

Other/Miscellaneous
Carried Forward
09/29/2023
1. core sample approved 2. complete fastener attachment at all coping and flashing per city approved plans as discussed with contractor

Re-Roof Inspection Not Ready 10/13/2023 10/13/2023 10/13/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
10/13/2023
1. core sample approved 2. complete fastener attachment at all coping and flashing per city approved plans as discussed with contractor

Other/Miscellaneous
Carried Forward
10/13/2023
arrived on site 11:55 talked to roofer he stated there was nothing to inspect

Building Final Inspection Passed 10/18/2023 10/18/2023 10/18/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
10/18/2023
1. set up time to due core sample with inspector present as discussed with contractors 2. provide all warranties as discussed at time of next inspection 3. not ready

Comment Building Div Inspection VOID 10/18/2023
Kevin Spruell ((253) 841-5590)
Roof Sheathing Inspection VOID 10/18/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
08/14/2023
1. no contact from contractor prior to 8:30 am 2.no one on site at time of inspection 11:05 am

Re-Roof Inspection VOID 10/18/2023
Kevin Spruell ((253) 841-5590)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Re-Roof Conditions Open Standard Conditions
RE-ROOF 1) PROVIDE MANUFACTURES SPECIFICATIONS AND INSTALLATION DETAILS ON SITE FOR INSPECTION 2) CALL FOR REQUIRED INSPECTIONS PRIOR TO COVER; REQUIRED FOR SHEATHING REPLACEMENT, STRUCTURAL REPAIR OR INSULATION 3) PROVIDE INSPECTION ACCESS 4) PROVIDE A COPY OF THE PERMIT ON SITE ***MUST PROVIDE DRIP EDGE ON ALL ROOF EDGES***

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
05/30/2023 Receipt Receipt for transaction:2023-000968
06/01/2023 Letter Incomplete Application Notice
06/06/2023 Form Building Permit Application 2023_202305181229557439 (Flattened)
06/06/2023 Plans Site Plan (Stamped)
06/06/2023 Other FMDC Puyallup Submittals (Stamped)
06/06/2023 Other FMDC Puyallup pin report (Stamped)
06/06/2023 Other Puyallup A2 Plans (Stamped)
06/21/2023 Letter Permit - Detailed
06/21/2023 Receipt Receipt for transaction:2023-001158
08/14/2023 Report Inspection Report (Roof Sheathing Inspection)
09/14/2023 Report Inspection Report (Re-Roof Inspection)
09/20/2023 Receipt Receipt for transaction:2023-001808
09/25/2023 Report Inspection Report (Re-Roof Inspection)
09/27/2023 Report Inspection Report (Building Final Inspection)
09/29/2023 Roof warranty
09/29/2023 Roof warranty 0
09/29/2023 Roof warranty 1
09/29/2023 Roof warranty 2
09/29/2023 Report Inspection Report (Re-Roof Inspection)
10/18/2023 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.