Planning Application Status
P-21-0141
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Engineering Traffic Review | Revisions Required | 12/14/2021 | 12/14/2021 |
Bryan Roberts
((253) 841-5542)
Send Email
|
|||
Engineering Review | Revisions Required | 12/14/2021 | 12/14/2021 |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Other/Miscellaneous
Outstanding
12/13/2021
|
|||
ENG PLAN REVIEW CIVIL - No Comments | |||
Engineering Review | Revisions Required | 12/14/2021 | 12/14/2021 |
Jamie Carter
((253) 435-3616)
Send Email
|
|||
Engineering Review | Approved | 12/14/2021 | 11/29/2021 |
David Drake
((253) 864-4171)
Send Email
|
|||
ENG PLAN REVIEW CIVIL - No Comments | |||
Engineering Review | Approved | 12/14/2021 | 11/18/2021 |
David Leahy
((253) 435-3618)
Send Email
|
|||
Other/Miscellaneous
Outstanding
12/14/2021
See Conditions.
|
|||
ENG PLAN REVIEW CIVIL - No Comments |
There are no hearings for this planning application.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Miscellaneous Condition | Resolved | Development & Permitting Services | Critical Area | ||
:
N/A
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Submit With Building Permit Application | ||
:
Building Comments;
1. Plans must be complete with all building, plumbing, mechanical, energy code items, and accessibility requirements at time of submittal, per the Codes in place at the time. Once a complete application meeting all requirements are met it will be put in the que for review.
2. Will need to supply all truss specs, sealed by the truss engineer per the codes in place at the time of submittal.
3. Make sure to address all requirements for the type A and B units clearly on the plans.
4. Show the required infrastructure for the charging stations per the Washington State amendments of the IBC on the plans.
5. If a fire pump room is to be installed for this project, then make sure to show the 2 hour pump room on the plans per 2018 IBC section 913.2.1(WA ST amendment) in complete details.
6. Please keep in mind there are a multitude of Washington State amendments to the 2018 codes that will need to be addressed in the plans.
7. Will need a complete plumbing schematic for this building in the plans.
8. These plans will need to meet all requirements of RCW 64.55.
9. The Codes that are currently adopted by Washington State are the 2018 versions along with all Washington State Amendments.
10. As discussed in the pre-app meeting these units will be reviewed and given a certificate of occupancy as R-2 apartments so all codes that are related to an R-2 will be required i.e., type A and B accessible units, charging stations etc.as mentioned above and during the meeting. As mentioned in the meeting the term of Condo does not exist in the IBC.
|
Reference Number | Status | Type |
---|---|---|
PLPSP20220085 | Waiting for Revisions | Preliminary Site Plan |
PLDDG20220086 | Waiting for Revisions | Downtown Design Review |
Date Uploaded | File Type | Name |
---|---|---|
12/14/2021 | Plans | p-21-0141 application2 (Flattened) |
12/14/2021 | P-21-0141 PRE APP NOTES 12142021 | |
12/14/2021 | P-21-0141 AOB LOT UTILITIES | |
12/14/2021 | P-21-0141 Pre App Questions From Applicant_CityResponses 12142021 | |
05/16/2022 | Letter | Notice of meeting TRIFOLD - AOB |
05/16/2022 | Notice of Vicinity Meeting - AOB Lot 05112022 |