Summary

P-21-0141
330 3RD ST SW
Pre-Application
Pre-Application
File Closed
11/09/2021
RAY RUTH

Locations

Property
5745001371

* Address
330 3RD ST SW

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review Revisions Required 12/14/2021 12/14/2021
Engineering Review Revisions Required 12/14/2021 12/14/2021
Engineering Review Revisions Required 12/14/2021 12/14/2021
Engineering Review Approved 12/14/2021 11/29/2021
Engineering Review Approved 12/14/2021 11/18/2021

Meetings

There are no hearings for this planning application.

Conditions

Condition Status Department Category Expiration Date Due Date
Miscellaneous Condition Resolved Development & Permitting Services Critical Area
: N/A
Miscellaneous Condition Resolved Development & Permitting Services Submit With Building Permit Application
: Building Comments; 1. Plans must be complete with all building, plumbing, mechanical, energy code items, and accessibility requirements at time of submittal, per the Codes in place at the time. Once a complete application meeting all requirements are met it will be put in the que for review. 2. Will need to supply all truss specs, sealed by the truss engineer per the codes in place at the time of submittal. 3. Make sure to address all requirements for the type A and B units clearly on the plans. 4. Show the required infrastructure for the charging stations per the Washington State amendments of the IBC on the plans. 5. If a fire pump room is to be installed for this project, then make sure to show the 2 hour pump room on the plans per 2018 IBC section 913.2.1(WA ST amendment) in complete details. 6. Please keep in mind there are a multitude of Washington State amendments to the 2018 codes that will need to be addressed in the plans. 7. Will need a complete plumbing schematic for this building in the plans. 8. These plans will need to meet all requirements of RCW 64.55. 9. The Codes that are currently adopted by Washington State are the 2018 versions along with all Washington State Amendments. 10. As discussed in the pre-app meeting these units will be reviewed and given a certificate of occupancy as R-2 apartments so all codes that are related to an R-2 will be required i.e., type A and B accessible units, charging stations etc.as mentioned above and during the meeting. As mentioned in the meeting the term of Condo does not exist in the IBC.

Related Permit & Planning Applications

Reference Number Status Type
PLPSP20220085 Canceled Preliminary Site Plan
PLDDG20220086 Canceled Downtown Design Review