CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
B-20-0306
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Sewer System Development Charge | $23,468.76 | $23,468.76 | Paid | 02/18/2021 |
|
No
|
||||
| Building Division Fee (Hourly) | $130.00 | $130.00 | Paid | 02/18/2021 |
|
No
|
||||
| Mechanical Plan Review Fee | $59.93 | $59.93 | Paid | 02/18/2021 |
|
No
|
||||
| WA State Building Code Council Fee (Residential) | $25.00 | $25.00 | Paid | 02/18/2021 |
|
No
|
||||
| Mechanical Permit Fee | $92.20 | $92.20 | Paid | 02/18/2021 |
|
No
|
||||
| Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 02/18/2021 |
|
No
|
||||
| Building Plan Review Fee | $3,882.94 | $3,882.94 | Paid | 02/18/2021 |
|
No
|
||||
| Plumbing Permit Fee | $339.00 | $339.00 | Paid | 02/18/2021 |
|
No
|
||||
| Plumbing Plan Review Fee | $220.35 | $220.35 | Paid | 02/18/2021 |
|
No
|
||||
| Planning Building Permit Fee | $120.00 | $120.00 | Paid | 02/18/2021 |
|
No
|
||||
| Building Permit Fee | $5,973.75 | $5,973.75 | Paid | 02/18/2021 |
|
No
|
||||
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 02/18/2021 |
|
No
|
||||
| Water System Development Charge | $13,736.34 | $13,736.34 | Paid | 02/18/2021 |
|
No
|
||||
| Building Division Fee (Hourly) | $130.00 | $130.00 | Paid | 01/26/2022 |
| Building Division Fee (Hourly) | $130.00 | $130.00 | Paid | 07/05/2022 |
| Resubmittal/Revision Fee | $130.00 | $130.00 | Paid | 07/05/2022 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $49,003.27 | $49,003.27 | $0.00 | |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Footing/Setback Inspection | Not Ready | 2/8/2022 | 2/8/2022 | 02/08/2022 |
| Monty Johnson ((253) 770-3326) | ||||
| Foundation/Rebar Inspection | Not Ready | 2/8/2022 | 2/8/2022 | 02/08/2022 |
| Monty Johnson ((253) 770-3326) | ||||
| Foundation/Rebar Inspection | Not Ready | 2/10/2022 | 2/10/2022 | 02/10/2022 |
| Gary Webster ((253) 841-5590) | ||||
| Foundation/Rebar Inspection | Not Ready | 2/16/2022 | 2/16/2022 | 02/16/2022 |
| Gary Webster ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2022
footings only
|
||||
| Footing/Setback Inspection | Partial Pass | 2/16/2022 | 2/16/2022 | 02/16/2022 |
| Gary Webster ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2022
received geo-tech approval & special inspection of rebar
progressing with special inspection
|
||||
| Plumbing Rough In Inspection | Failed | 2/22/2022 | 02/22/2022 | |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/22/2022
1 ; provide City Approved plans on-site at time of inspection. ( not ready)
|
||||
| Plumbing Below Slab Inspection | Passed w/ Conditions | 2/23/2022 | 02/23/2022 | |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/23/2022
1 ; below slab plumbing approved pending as -built plumbing plans approved by Mechanical Engineer of Record.
|
||||
| Foundation/Rebar Inspection | Partial Pass | 3/2/2022 | 3/2/2022 | 03/02/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/02/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter at exterior walls
2 ; approved with special inspection approval.
|
||||
| Energy (Insulation) Inspection | Not Ready | 3/2/2022 | 3/2/2022 | 03/02/2022 |
| Shannon King ((253) 840-6684) | ||||
| Footing/Setback Inspection | Passed | 3/21/2022 | 3/21/2022 | 03/21/2022 |
| Gary Webster ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
02/16/2022
received geo-tech approval & special inspection of rebar
progressing with special inspection
|
||||
| Energy (Insulation) Inspection | Partial Pass | 3/22/2022 | 3/22/2022 | 03/22/2022 |
| Gary Webster ((253) 841-5590) | ||||
| Frame Inspection | Not Ready | 5/2/2022 | 5/2/2022 | 05/02/2022 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Failed | 6/3/2022 | 6/3/2022 | 06/03/2022 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
06/03/2022
INSP FOR ROOF NAILING
1: COMPLETE ALL DETAILS ON SHEET S3.3 FOR NAILING.
2:PROVIDE SPECIAL INSP APPROVAL FOR NAILING 4" OC AND LESS.
|
||||
| Frame Inspection | Partial Pass | 6/7/2022 | 6/7/2022 | 06/07/2022 |
| Shannon King ((253) 840-6684) | ||||
| Shear Wall Inspection | Failed | 6/10/2022 | 6/10/2022 | 06/10/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
06/10/2022
1 ; complete shear wall nailing as per City approved plans and renail overdriven nails at grid line - (a,2-5) (5,a-b2)
|
||||
| Energy (Insulation) Inspection | Partial Pass | 6/14/2022 | 6/14/2022 | 06/14/2022 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Partial Pass | 6/14/2022 | 6/14/2022 | 06/14/2022 |
| Shannon King ((253) 840-6684) | ||||
| Shear Wall Inspection | Passed | 6/14/2022 | 06/14/2022 | |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
06/10/2022
1 ; complete shear wall nailing as per City approved plans and renail overdriven nails at grid line - (a,2-5) (5,a-b2)
|
||||
| Energy (Insulation) Inspection | Partial Pass | 6/15/2022 | 6/15/2022 | 06/15/2022 |
| Shannon King ((253) 840-6684) | ||||
| Mechanical Rough In Inspection | Not Ready | 7/26/2022 | 7/26/2022 | 07/26/2022 |
| Shannon King ((253) 840-6684) | ||||
| Gas Test Inspection | Passed | 9/8/2022 | 9/8/2022 | 09/08/2022 |
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | Failed | 9/14/2022 | 9/14/2022 | 09/14/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/14/2022
1 ; provide City Approved plans on-site at time of inspection. ( not ready)
|
||||
|
Other/Miscellaneous
Carried Forward
09/14/2022
1. complete DWV thru roof and put on test prior to next inspection
|
||||
| Frame Inspection | Not Ready | 9/22/2022 | 9/22/2022 | 09/22/2022 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/22/2022
1.add anchor bolts under stairs as discussed with contractor
2.complete draft stops and poly seal
3. strap plates at entrance to gym
|
||||
| Frame Inspection | Partial Pass | 9/23/2022 | 9/23/2022 | 09/23/2022 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
09/23/2022
1.add anchor bolts under stairs as discussed with contractor
2.complete draft stops and poly seal
3. strap plates at entrance to gym
|
||||
| Energy (Insulation) Inspection | Failed | 9/29/2022 | 9/29/2022 | 09/29/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/29/2022
1.complete insulation as discussed with the contractor
2.complete draft stop as discussed with contractor
|
||||
| Plumbing Rough In Inspection | Failed | 9/29/2022 | 9/29/2022 | 09/29/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/29/2022
1 ; provide City Approved plans on-site at time of inspection. ( not ready)
|
||||
|
Other/Miscellaneous
Carried Forward
09/29/2022
1. complete DWV thru roof and put on test prior to next inspection
|
||||
|
Other/Miscellaneous
Carried Forward
09/29/2022
1.complete DWV thru roof and put on test
2.provide nail plate at plumbing as discussed with contractor
|
||||
| Frame Inspection | Not Ready | 10/3/2022 | 10/3/2022 | 10/03/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete blocking at ceiling as discussed with contractor
|
||||
| Energy (Insulation) Inspection | Not Ready | 10/3/2022 | 10/3/2022 | 10/03/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/03/2022
1.complete insulation as discussed with the contractor
2.complete draft stop as discussed with contractor
|
||||
|
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete insulation in stair well as discussed with contractor
|
||||
| Energy (Insulation) Inspection | Partial Pass | 10/4/2022 | 10/4/2022 | 10/04/2022 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Partial Pass | 10/4/2022 | 10/4/2022 | 10/04/2022 |
| Shannon King ((253) 840-6684) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 10/17/2022 | 10/17/2022 | 10/17/2022 |
| Shannon King ((253) 840-6684) | ||||
| Wallboard / Drywall Inspection | Failed | 11/10/2022 | 11/10/2022 | 11/10/2022 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/10/2022
1:provide architects listing for 1hr rated wall with metal expansion joints
2: if dattoed rock is ok by architect and listing screw off at 7" o.c.
|
||||
| Mechanical Rough In Inspection | Partial Pass | 12/5/2022 | 12/5/2022 | 12/05/2022 |
| Kevin Spruell ((253) 841-5590) | ||||
| Ceiling Grid/T-Bar Inspection | Not Ready | 12/8/2022 | 12/8/2022 | 12/08/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/08/2022
1 ; complete all ceiling grid requirements as per City approved plans as discussed with contractor.
|
||||
| Exit Lighting Test Inspection | Passed | 12/12/2022 | 12/12/2022 | 12/12/2022 |
| David Drake ((253) 864-4171) | ||||
| Ceiling Grid/T-Bar Inspection | Passed | 12/19/2022 | 12/19/2022 | 12/19/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
12/19/2022
1 ; complete all ceiling grid requirements as per City approved plans as discussed with contractor.
|
||||
| Engineering Final Inspection | Not Ready | 12/20/2022 | 12/20/2022 | 12/20/2022 |
| Michael Rosenau ((253) 344-6753) | ||||
| Mechanical Final Inspection | Failed | 12/20/2022 | 12/20/2022 | 12/20/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2022
1. ; provide balance report as discussed with contractor.
2 ; paint gas pipe on roof.
3 ; protect insulation on refrigeration line set from u.v. rays.
4 ; seal penetration in exterior of building at refrigeration line set.
5 ; complete install of ladder for roof to access.
|
||||
| Mechanical Final Inspection | Not Ready | 12/27/2022 | 12/27/2022 | 12/27/2022 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/03/2023
1. ; provide balance report as discussed with contractor.
2 ; paint gas pipe on roof.
3 ; protect insulation on refrigeration line set from u.v. rays.
4 ; seal penetration in exterior of building at refrigeration line set.
5 ; complete install of ladder for roof to access.
|
||||
| Engineering Final Inspection | Failed | 1/6/2023 | 1/6/2023 | 01/06/2023 |
| Michael Rosenau ((253) 344-6753) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
01/11/2023
-Cut down C.O.'s on east end of building and all along the south side of the building, install threaded adaptors, threaded caps, and Carson boxes.
|
||||
| Planning Final Inspection | Passed | 1/6/2023 | 01/09/2023 | |
| Chris Beale ((253) 841-5418) | ||||
| Engineering Final Inspection | Passed | 1/11/2023 | 1/11/2023 | 01/11/2023 |
| Michael Rosenau ((253) 344-6753) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
01/11/2023
-Cut down C.O.'s on east end of building and all along the south side of the building, install threaded adaptors, threaded caps, and Carson boxes.
|
||||
| Building Final Inspection | Partial Pass | 1/12/2023 | 1/12/2023 | 01/17/2023 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/12/2023
1 ; complete accessible route from pubic sidewalk to building as per code.
2 ; complete #2 accessible parking spaces & signage as required per city approved plans.
3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.)
4 ; caulk mop sink in room 102.
5 ; provide trap primmer at floor drain of eye wash station.
6 ; complete threshold and door sweep at west exterior exit door.
7 ; complete self closing access doors at stairwells.
8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA)
9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor.
10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs.
11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps.
12 ; complete exterior grade to drain away from building as per code as discussed with contractor.
13 ; seal penetrations in exterior of building.
|
||||
|
Other/Miscellaneous
Outstanding
01/17/2023
1 ; complete accessible route from pubic sidewalk to building as per code.
2 ; complete #2 accessible parking spaces & signage as required per city approved plans.
3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.)
4 ; caulk mop sink in room 102.
5 ; provide trap primmer at floor drain of eye wash station.
6 ; complete threshold and door sweep at west exterior exit door.
7 ; complete self closing access doors at stairwells.
8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA)
9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor.
10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs.
11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps.
12 ; complete exterior grade to drain away from building as per code as discussed with contractor.
13 ; seal penetrations in exterior of building.
14 ; T.C.O. approved for 30 days only from1/17/2023 at 1st floor only.
|
||||
| Building Final Inspection | Partial Pass | 1/17/2023 | 1/17/2023 | 01/17/2023 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/25/2023
1 ; complete accessible route from pubic sidewalk to building as per code.
2 ; complete #2 accessible parking spaces & signage as required per city approved plans.
3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.)
4 ; caulk mop sink in room 102.
5 ; provide trap primmer at floor drain of eye wash station.
6 ; complete threshold and door sweep at west exterior exit door.
7 ; complete self closing access doors at stairwells.
8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA)
9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor.
10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs.
11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps.
12 ; complete exterior grade to drain away from building as per code as discussed with contractor.
13 ; seal penetrations in exterior of building.
14 ; T.C.O. approved for 30 days only from1/17/2023 at 1st floor only.
|
||||
| Comment Building Div Inspection | Failed | 1/26/2023 | 1/26/2023 | 01/26/2023 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/26/2023
1 ; complete fire stop at interior of elevator.
|
||||
| Building Final Inspection | Failed | 2/16/2023 | 2/16/2023 | 02/16/2023 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2023
1 ; complete accessible route from pubic sidewalk to building as per code.
2 ; complete #2 accessible parking spaces & signage as required per city approved plans.
3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.)
4 ; caulk mop sink in room 102.
5 ; provide trap primmer at floor drain of eye wash station.
6 ; complete threshold and door sweep at west exterior exit door.
7 ; complete self closing access doors at stairwells.
8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA)
9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor.
10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs.
11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps.
12 ; complete exterior grade to drain away from building as per code as discussed with contractor.
13 ; seal penetrations in exterior of building.
14 ; T.C.O. approved for 30 days only from1/17/2023 at 1st floor only.
|
||||
|
Other/Miscellaneous
Carried Forward
02/16/2023
1 ; complete accessible parking signage min. 60'' above parking surface at accessible parking stalls.
2 ; complete accessible path not to exceed 2% side slope as discussed with contractor.
|
||||
| Building Final Inspection | Passed | 2/21/2023 | 2/21/2023 | 02/21/2023 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/21/2023
1 ; complete accessible route from pubic sidewalk to building as per code.
2 ; complete #2 accessible parking spaces & signage as required per city approved plans.
3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.)
4 ; caulk mop sink in room 102.
5 ; provide trap primmer at floor drain of eye wash station.
6 ; complete threshold and door sweep at west exterior exit door.
7 ; complete self closing access doors at stairwells.
8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA)
9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor.
10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs.
11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps.
12 ; complete exterior grade to drain away from building as per code as discussed with contractor.
13 ; seal penetrations in exterior of building.
14 ; T.C.O. approved for 30 days only from1/17/2023 at 1st floor only.
|
||||
|
Other/Miscellaneous
Resolved
02/21/2023
1 ; complete accessible parking signage min. 60'' above parking surface at accessible parking stalls.
2 ; complete accessible path not to exceed 2% side slope as discussed with contractor.
|
||||
| Combination Frame And Rough In Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Carbon Monoxide Detectors Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Fire Final Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Foundation/Rebar Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
03/02/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter at exterior walls
2 ; approved with special inspection approval.
|
||||
| Shear Wall Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Wallboard / Drywall Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Energy (Insulation) Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Energy (Insulation) Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/03/2022
1.complete insulation as discussed with the contractor
2.complete draft stop as discussed with contractor
|
||||
|
Other/Miscellaneous
Outstanding
10/03/2022
1. complete insulation in stair well as discussed with contractor
|
||||
| Frame Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/03/2022
1. complete blocking at ceiling as discussed with contractor
|
||||
| Plumbing Rough In Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
09/29/2022
1 ; provide City Approved plans on-site at time of inspection. ( not ready)
|
||||
|
Other/Miscellaneous
Outstanding
09/29/2022
1. complete DWV thru roof and put on test prior to next inspection
|
||||
|
Other/Miscellaneous
Outstanding
09/29/2022
1.complete DWV thru roof and put on test
2.provide nail plate at plumbing as discussed with contractor
|
||||
| Mechanical Rough In Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
| Mechanical Final Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/03/2023
1. ; provide balance report as discussed with contractor.
2 ; paint gas pipe on roof.
3 ; protect insulation on refrigeration line set from u.v. rays.
4 ; seal penetration in exterior of building at refrigeration line set.
5 ; complete install of ladder for roof to access.
|
||||
| Comment Building Div Inspection | VOID | 02/21/2023 | ||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/26/2023
1 ; complete fire stop at interior of elevator.
|
||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Resolved | Standard Conditions |
|
Building Division
PERMIT CONDITIONS:
1- Comply with 2018 IFC and 2018 IBC
2- Total coverage required in the city of puyallup
3- Exit lighting test required contractor to provide light meter
4- Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
5- Separate permits required for Fire Alarm and Fire Sprinkler.
6- RTU’S will be required to be tested for shut down.
7- Fire extinguishers required per code
8- A Knox box is required at the front entry on the exterior of the building
9- PIV must have a Knox lock or approved lock with an extra key provided in Knox box
10- Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
11- All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Call morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake at 253-864-4171 or Ray Cockerham at 253-841-5585
|
||
| Engineering Commercial Standard Conditions | Open | Standard Conditions |
|
Development & Permitting Services
* Prior to STARTING site work; request inspection for Erosion and Sediment
** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-XX-XXXX IS COMPLETED AND APPROVAL HAS BEEN PROVIDED **
* THE APPLICANT IS RESPONSIBLE TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING.
** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW.
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE.
* Curb, gutter, sidewalk and approach must be poured per City Standards.
* Driveway approach must be a minimum of 30' wide.
* The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
* No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
* All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
* All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03.
* A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap.
* Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway.
* Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards.
* Property owner must install a private pump system per city standards to tie into existing force main.
* All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards.
This property lies within a regulated Flood Zone. Both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
(For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums.
(For A0 Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade).
Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1 foot above grade. (PMC 21.07.060(2))
If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities.
No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f)
Steps shall be taken to prevent drainage onto adjacent lots.
No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Flood Elevation Certificate is completed based on "Finished Construction" and reviewed and accepted by the City of Puyallup.
PERMIT CONDITIONS:
1 COMPLY WITH 2018 IFC AND 2018 IBC
2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP
3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER
4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED
5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN.
6 FIRE EXTINGUISHERS REQUIRED PER CODE
7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.
|
||
| Pipeline Notfication Rcw 19.122.033 | Resolved | Standard Conditions |
|
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView