CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20240424


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20240424
Commercial - New Construction
Permit(s) Issued
WESLEY HOMES BRADLEY PARK LLC
New
UPDATED SCOPE OF WORK - Wesley Bradley Park PH2 Care Center which is being built adjacent to the existing Lodge Building. This project will be a licensed Care Center with 36 beds in 35 sleeping units all on Level 1. The lower level will include a swimming pool and Physical Therapy Area with other staff support and building operation spaces for the nursing home above. CARE CENTER
03/13/2024
08/21/2025
02/17/2026

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 08/29/2025 08/20/2025
Engineering Review Approved 08/29/2025 08/19/2025
Engineering Traffic Review Approved 08/29/2025 08/14/2025
Fire Review Approved 08/29/2025 08/14/2025
Planning Review Approved 08/29/2025 08/14/2025
Engineering Review Failed 05/15/2025 05/14/2025
Planning Review Failed 05/15/2025 05/13/2025
Engineering Traffic Review Approved 05/15/2025 05/07/2025
Fire Review Approved 05/15/2025 05/05/2025
Building Review Approved 05/15/2025 04/18/2025
Engineering Review Failed 01/14/2025 01/17/2025
Engineering Traffic Review Approved 01/14/2025 01/15/2025
Fire Review Approved 01/14/2025 01/14/2025
Building Review Approved 01/14/2025 01/14/2025
Planning Review Approved 01/14/2025 12/30/2024
Building Review Failed 05/17/2024 05/23/2024
Fire Review Approved 05/17/2024 05/22/2024
Engineering Review Failed 05/17/2024 05/15/2024
Engineering Traffic Review Approved 05/17/2024 05/14/2024
Planning Review Approved 05/17/2024 04/30/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 08/21/2025
Planning Landscape Review Fee $300.00 $300.00 Paid 08/21/2025
Air Handling Unit (Over 10,000 cfm) Fee $23.92 $23.92 Paid 08/21/2025
Air Handling Unit (Up to 10,000 cfm) Fee $28.20 $28.20 Paid 08/21/2025
Exhaust Hood, With Make Up Air - Commercial Fee $35.95 $35.95 Paid 08/21/2025
Mechanical Duct Work Fee $24.00 $24.00 Paid 08/21/2025
Suspended, Recessed Wall, or Floor unit Heater Fee $117.30 $117.30 Paid 08/21/2025
Ventilation System (apart from Heating/AC) Fee $28.20 $28.20 Paid 08/21/2025
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $179.75 $179.75 Paid 08/21/2025
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $77.60 $77.60 Paid 08/21/2025
Building Permit Fee $118,758.75 $118,758.75 Paid 08/21/2025
Planning Building Permit Fee $120.00 $120.00 Paid 08/21/2025
Mechanical Permit Fee $40.00 $40.00 Paid 08/21/2025
Backflow Preventor Fee $208.00 $208.00 Paid 03/13/2024
Plumbing Permit Fee $40.00 $40.00 Paid 08/21/2025
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 08/21/2025
Garbage Disposal Fee $13.00 $13.00 Paid 08/21/2025
Gas Piping (Plumbing) Fee $14.50 $14.50 Paid 08/21/2025
Grease Trap or Interceptor Fee $13.00 $13.00 Paid 08/21/2025
Plumbing Fixtures Fee $2,964.00 $2,964.00 Paid 08/21/2025
Sump, Sewage, or Ejector Pumps Fee $52.00 $52.00 Paid 08/21/2025
Water Heater Fee $26.00 $26.00 Paid 08/21/2025
Building Plan Review Fee $77,193.19 $77,193.19 Paid 03/13/2024
Mechanical Plan Review Fee $360.70 $360.70 Paid 03/13/2024
Plumbing Plan Review Fee $2,182.54 $2,182.54 Paid 03/13/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 08/21/2025
Traffic Impact Fee (Commercial) $22,500.00 $22,500.00 Paid 08/21/2025
Sewer System Development Charge $115,495.45 $115,495.45 Paid 08/21/2025
Water System Development Charge $79,463.20 $79,463.20 Paid 08/21/2025
Resubmittal Fee $180.00 $180.00 Paid 12/10/2024
Resubmittal Fee $180.00 $180.00 Paid 04/16/2025
Resubmittal Fee $180.00 $180.00 Paid 08/12/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Pending
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Gas Test Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Shower Pan Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Job Start Inspection Pending
Engineering Daily Inspection Pending
Engineering Final Inspection Pending
Floodproof Certification Inspection Pending
Elevation Verification Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • CO/NO2 Testing required for Fire Final • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems. • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: ** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20231028 for specifications ** ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20231028 for specifications ** ** The pool shall be filled with a hose/ water truck. The pool cannot be connected to the City's water system unless the water service is protected by a reduced pressure backflow assembly (RPBA). Installation, filling, and draining of the pool shall comply with applicable county health department requirements. Pool water shall be dechlorinated and have a neutral PH prior to entering the storm sewer system ** ** In accordance with Puyallup Municipal Code 14.02.220(3) this project is required to install a reduce pressure backflow assembly (RPBA). Building occupancy will not be granted until the installation is completed, and a final approval granted. See civil permit PRCCP20231028 ** ** The applicant is responsible to schedule all utility inspections prior to backfilling ** ** In accordance with City Standard 04.03.04 this project is required to install a sewer sampling tee on the existing sewer lateral. See civil permit PRCCP20231028 ** - The applicant is responsible to schedule all utility inspections prior to backfilling - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Do not release this builidng permit until civil permit PRCCP20231028 has been issued. PRCCP20231028 issued on 10/2/2024. [Yianni Charitou @ 08/19/2025 4:04 PM]
Miscellaneous Condition Open Prior to Completion
Engineering Division
This permit will not receive occupancy until all work associated with civil permit PRCCP20231028 has been completed and a final approval granted - refer to PCR002 for must up to date civil plans.
Fire Sprinkler System (New) Conditions Open Standard Conditions
Development & Permitting Services
• Provide plans and permit on site for inspection. • Cover and final inspections are required. • Fire watch is required when sprinkler system is out of service in existing buildings. • Contractor required at all inspections. • Hydro test will be required on all new and existing buildings. Appointment required. • Hydro test, two inspections will be required 2hrs apart. Call to schedule times. Am/pm is not guaranteed without appointment. • Fire pumps will be required to be tested and witnessed by inspector. • Tool kit required at time of final. • NFPA placards required. • In existing buildings all upright fire sprinklers to remain, do not remove. • In existing buildings all required service and maintenance to be updated prior to inspection. • Due to unforeseeable construction design, all head locations to be field verified for compliance. Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. For larger system please make an appointment prior to scheduling first. David Drake ddrake@puyallupwa.gov
New Fire Alarm System Conditions Open Standard Conditions
Development & Permitting Services
• Appointment required for all inspections am/pm is not guaranteed without appointment. Larger systems taking more than 1 hour will require 48-72hr notice prior to scheduling. • Provide plans and permit on site for inspection. • Complete labor and industries inspections prior to requesting city inspection. • Exterior fire bell required outside fire sprinkler room. • Above ceiling detection is required. • Device maps required at the annunciator and fire alarm panel prior to calling in final. The annunciator map will need to be weatherproof. • Total coverage is required, subject to field inspection. Comply with NFPA 72. • Fire alarm system shall be placarded per NFPA 72. The UL certificate shall be posted at time of final inspection. The system will need to be UL certified. • Pre-test shall be conducted with a printout for inspector at time of inspection. • Labeling of all devices above and below ceiling required. • Fire sprinkler tamper valves and PIV will be required to be tested at inspection. Fire sprinkler contractor to be onsite. • RTU’S and smoke dampeners will be required to be tested during inspection. • The city of Puyallup allows one FACP per building. The panel will need to be large enough to handle multiple tenants if applicable. • In existing buildings all above ceiling detection is to remain. Do not remove. • Due to unforeseeable construction design, all device locations to be field verified for compliance. Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. For larger system please make an appointment prior to scheduling first. David Drake ddrake@puyallupwa.gov
Fire Review Conditions Open Standard Conditions
Development & Permitting Services
• Email Ron Taylor for all required Radio frequencies ron@rtfidelity.solutions o Cc. ddrake@puyallupwa.gov o Cc. rayc@puyallupwa.gov o Responding agencies are Central Pierce Fire & Rescue, Puyallup Police Department • Prior to requesting City Inspection, reply to email chain above with passing test results and include all frequencies tested in a full report. • Once the report has been reviewed, a request for inspection can be approved. • Appointment required for inspection. • Fire Alarm contractor required to be onsite for testing. • Provide plans and permit on site for inspection. • A smoke detector is required above riser. • ERRS to be labeled on door. • Complete labor and industries inspections prior to requesting city inspection. Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Miscellaneous Condition Open Prior to Completion
Traffic Division
As shown on civil plans, sight distance at 39th Ave SE driveway must be verified prior to building occupancy. Significant re-grade + tree removal is required to meet sight distance. Landscaping design must comply with sight distance requirements.
Miscellaneous Condition Open Prior to Completion
Engineering Division
Prior to occupancy, provide a fully executed landscape easement between Wesley Homes and Lowes Corporation as require by Mark Higginson's approval of PCR 002 dated 8/4/2025.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Business License Endorsement Resolved Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
PRRWF20250002 Returned for Correction Retaining Wall
PRHM20250155 Closed Hydraulic Modeling
PLZV20240115 File Closed Zoning Verification

Documents & Images

Date Uploaded File Type Name
03/13/2024 Receipt Receipt for transaction:2024-000503
12/10/2024 Receipt Receipt for transaction:2024-002558
04/16/2025 Receipt Receipt for transaction:2025-000734
08/12/2025 Receipt Receipt for transaction:2025-001584
08/20/2025 Plans SITE PLAN - RESUB (Stamped)
08/20/2025 Plans CONSTRUCTION PLAN SET LV plans Permit Set (Stamped)
08/20/2025 Plans CONSTRUCTION PLAN SET Structural Dwgs (Stamped)
08/20/2025 Plans CONSTRUCTION PLAN SET KITCHEN FOOD SERVICE EQUIPMENT (Stamped)
08/20/2025 Plans CONSTRUCTION PLAN SET MEP Bradley Park Care Center MEP Permit Set (Stamped)
08/20/2025 Plans CONSTRUCTION PLAN SET ARCH (Stamped)
08/20/2025 Form WSEC LIGHTING COMPLIANCE SUMMARY FORM (Stamped)
08/20/2025 Form WSEC MECHANICAL COMPLIANCE SUMMARY FORM (Stamped)
08/20/2025 Form ENERGY CODE WSEC PROJECT ENVELOPE REQUIREMENTS (Stamped)
08/20/2025 Form ENERGY CODE PROJECT SUMMARY FORM (Stamped)
08/20/2025 Form WSEC LIGHTING REQUIREMENTS (Stamped)
08/20/2025 Form WSEC MECHANICAL REQUIREMENTS (Stamped)
08/20/2025 Report STRUCTURAL CALCS - RESUB (Stamped)
08/20/2025 Specifications PROJECT SPECS VOL II (Stamped)
08/20/2025 Specifications PROJECT SPECS VOL (Stamped)
08/20/2025 Report HMIS (Stamped)
08/20/2025 Report Phase 2-Traffic Scoping Worksheet-2024-02-15 (Stamped)
08/20/2025 Form PLUMBING FIXTURE WORKSHEET - RESUB (Stamped)
08/21/2025 Receipt Receipt for transaction: 2025-001659


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.