| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Engineering Traffic Review
|
Approved
|
06/27/2024
|
06/24/2024
|
|
|
|
|
Building Review
|
Approved
|
06/27/2024
|
06/13/2024
|
|
|
|
|
|
See Document Markup
Per section 429 of the 2018 Washington State Building Code; five percent of parking spaces shall be provided with electric vehicle charging infrastructure (rounded up to the next whole number). Please show the number of EV charging spaces provided and show the locations on the site plan. [SITE PLAN, sheet A1.01]
|
|
|
See Document Markup
Per section 429 of the 2018 Washington State Building Code; five percent of parking spaces shall be provided with electric vehicle charging infrastructure (rounded up to the next whole number). Please show the number of EV charging spaces provided and show the locations on the site plan. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A2.22]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A2.23]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A3.03]
|
|
|
See Document Markup
Please provide the referenced geotechnical report supporting the 2500psf allowable soil bearing pressure. [CONSTRUCTION PLAN SET, sheet S0.01]
|
|
|
See Document Markup
Please include a typical note for the maximum allowable slope. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
|
See Document Markup
Please include a typical note for the maximum rise and minimum run. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
Engineering Review
|
Approved
|
06/27/2024
|
06/12/2024
|
|
|
|
|
|
See Document Markup
Complete the New Fixture Added Not a Replacement column [Plumbing Fixture Worksheet - Water]
|
|
|
See Document Markup
Remove the numbers from the Total FUWs City to Complete column [Plumbing Fixture Worksheet - Water]
|
|
|
See Document Markup
Complete the New Fixture Added Not a Replacement column [Plumbing Fixture Worksheet - Sewer]
|
|
|
See Document Markup
Remove the numbers from the Total FUWs City to Complete column [Plumbing Fixture Worksheet - Sewer]
|
|
|
See Document Markup
A complete review of these plans could not be completed without the plumbing fixture worksheet being completed with an accurate count of all proposed plumbing fixtures. [Construction Plan Set Sheet 1 of 170]
|
|
|
See Document Markup
A complete review of plumbing plans will be reviewed once the plumbing fixture worksheet is completed with an accurate count of all proposed plumbing fixtures. [Construction Plan Set Sheet 152(96 of 170)]
|
|
|
See Document Markup
This site plan will be reviewed by engineering against the civil site plan prior to its approval [Site Plan Sheet 1 of 1]
|
|
Planning Review
|
Approved
|
06/27/2024
|
06/12/2024
|
|
|
|
|
Fire Review
|
Approved
|
06/27/2024
|
05/30/2024
|
|
|
|
|
Building Review
|
Failed
|
05/16/2024
|
05/20/2024
|
|
|
|
|
|
See Document Markup
Per section 429 of the 2018 Washington State Building Code; five percent of parking spaces shall be provided with electric vehicle charging infrastructure (rounded up to the next whole number). Please show the number of EV charging spaces provided and show the locations on the site plan. [SITE PLAN, sheet A1.01]
|
|
|
See Document Markup
Per section 429 of the 2018 Washington State Building Code; five percent of parking spaces shall be provided with electric vehicle charging infrastructure (rounded up to the next whole number). Please show the number of EV charging spaces provided and show the locations on the site plan. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A2.22]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A2.23]
|
|
|
See Document Markup
Please clarify where the door Hardware Group is found. [CONSTRUCTION PLAN SET, sheet A3.03]
|
|
|
See Document Markup
Please provide the referenced geotechnical report supporting the 2500psf allowable soil bearing pressure. [CONSTRUCTION PLAN SET, sheet S0.01]
|
|
|
See Document Markup
Please include a typical note for the maximum allowable slope. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
|
See Document Markup
Please include a typical note for the maximum rise and minimum run. [CONSTRUCTION PLAN SET, sheet A1.01]
|
|
Fire Review
|
Approved
|
05/16/2024
|
05/20/2024
|
|
|
|
|
Planning Review
|
Approved
|
05/16/2024
|
05/17/2024
|
|
|
|
|
Engineering Review
|
Failed
|
05/16/2024
|
05/13/2024
|
|
|
|
|
|
See Document Markup
Complete the New Fixture Added Not a Replacement column [Plumbing Fixture Worksheet - Water]
|
|
|
See Document Markup
Remove the numbers from the Total FUWs City to Complete column [Plumbing Fixture Worksheet - Water]
|
|
|
See Document Markup
Complete the New Fixture Added Not a Replacement column [Plumbing Fixture Worksheet - Sewer]
|
|
|
See Document Markup
Remove the numbers from the Total FUWs City to Complete column [Plumbing Fixture Worksheet - Sewer]
|
|
|
See Document Markup
A complete review of these plans could not be completed without the plumbing fixture worksheet being completed with an accurate count of all proposed plumbing fixtures. [Construction Plan Set Sheet 1 of 170]
|
|
|
See Document Markup
A complete review of plumbing plans will be reviewed once the plumbing fixture worksheet is completed with an accurate count of all proposed plumbing fixtures. [Construction Plan Set Sheet 152(96 of 170)]
|
|
|
See Document Markup
This site plan will be reviewed by engineering against the civil site plan prior to its approval [Site Plan Sheet 1 of 1]
|
|
Engineering Traffic Review
|
Approved
|
05/16/2024
|
04/22/2024
|
|
|
|