Permit Application Status
PRCNC20240216
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 07/22/2024 |
| Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 07/22/2024 |
| Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $215.70 | $215.70 | Paid | 07/22/2024 |
| Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $58.20 | $58.20 | Paid | 07/22/2024 |
| Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 07/22/2024 |
| Unclassified Appliance or Equipment Fee | $225.60 | $225.60 | Paid | 07/22/2024 |
| Suspended, Recessed Wall, or Floor unit Heater Fee | $156.40 | $156.40 | Paid | 07/22/2024 |
| Ventilation System (apart from Heating/AC) Fee | $42.30 | $42.30 | Paid | 07/22/2024 |
| Air Handling Unit (Up to 10,000 cfm) Fee | $352.50 | $352.50 | Paid | 07/22/2024 |
| Building Permit Fee | $13,777.45 | $13,777.45 | Paid | 07/22/2024 |
| Planning Building Permit Fee | $120.00 | $120.00 | Paid | 07/22/2024 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 07/22/2024 |
| Backflow Preventor Fee | $78.00 | $78.00 | Paid | 02/22/2024 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 07/22/2024 |
| Drinking Fountain, Water Cooler, Ice Machine Fee | $80.50 | $80.50 | Paid | 07/22/2024 |
| Garbage Disposal Fee | $13.00 | $13.00 | Paid | 07/22/2024 |
| Gas Piping (Plumbing) Fee | $134.50 | $134.50 | Paid | 07/22/2024 |
| Plumbing Fixtures Fee | $546.00 | $546.00 | Paid | 07/22/2024 |
| Water Heater Fee | $273.00 | $273.00 | Paid | 07/22/2024 |
| Building Plan Review Fee | $8,955.34 | $8,955.34 | Paid | 02/22/2024 |
| Mechanical Plan Review Fee | $724.56 | $724.56 | Paid | 02/22/2024 |
| Plumbing Plan Review Fee | $757.25 | $757.25 | Paid | 02/22/2024 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/22/2024 |
| Mechanical Plan Review Fee | $724.56 | $724.56 | Paid | 03/14/2024 |
| Traffic Impact Fee (Commercial) | $261,000.00 | $261,000.00 | Paid | 07/22/2024 |
| Park Impact Fee (Manufacturing) | $33,756.00 | $33,756.00 | Paid | 07/22/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 05/28/2024 |
| Sewer System Development Charge | $53,189.79 | $53,189.79 | Paid | 07/22/2024 |
| Water System Development Charge | $26,665.92 | $26,665.92 | Paid | 07/22/2024 |
| Inspection Fee - Outside Of Business Hours | $180.00 | $180.00 | Paid | 10/01/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 10/14/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 10/23/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 11/04/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 11/27/2024 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 01/06/2025 |
| Inspection Fee - Outside Of Business Hours | $540.00 | $540.00 | Paid | 02/14/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $404,340.57 | $404,340.57 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Not Ready | 8/5/2024 | 8/5/2024 | 08/05/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
| Foundation/Rebar Inspection | Not Ready | 8/26/2024 | 8/26/2024 | 08/26/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
| Footing/Setback Inspection | Not Ready | 8/26/2024 | 8/26/2024 | 08/26/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/26/2024
1. this was a comment inspection
2. discussed job and sequence of inspections
|
||||
| Erosion And Sediment Inspection | Partial Pass | 08/27/2024 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Foundation/Rebar Inspection | Not Ready | 8/29/2024 | 8/29/2024 | 08/30/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/29/2024
1. called in error
|
||||
| Footing/Setback Inspection | Partial Pass | 8/29/2024 | 8/29/2024 | 08/30/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
08/30/2024
1. this was a comment inspection
2. discussed job and sequence of inspections
|
||||
|
Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
| Plumbing Below Slab Inspection | Partial Pass | 8/30/2024 | 8/30/2024 | 08/30/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/30/2024
1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D
|
||||
| Footing/Setback Inspection | Failed | 9/6/2024 | 9/6/2024 | 09/06/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
| Foundation/Rebar Inspection | Not Ready | 9/6/2024 | 9/6/2024 | 09/06/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
09/06/2024
date of inspection 8/29/2024
1. called in error
|
||||
|
Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 9/6/2024
1.see notes on footing inspection todays date
|
||||
| Plumbing Below Slab Inspection | Partial Pass | 9/6/2024 | 9/6/2024 | 09/09/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/09/2024
date of inspection 8/30/2024
1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
09/09/2024
date of inspection 9/6/2024
1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D
|
||||
| Footing/Setback Inspection | Partial Pass | 9/10/2024 | 9/10/2024 | 09/11/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
| Foundation/Rebar Inspection | Not Ready | 9/16/2024 | 9/16/2024 | 09/16/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/16/2024
date of inspection 9/6/2024
1.see notes on footing inspection todays date
|
||||
|
Other/Miscellaneous
Carried Forward
09/16/2024
9/16/2024
cancelled by contractor by phone
|
||||
| Plumbing Below Slab Inspection | Partial Pass | 9/17/2024 | 9/17/2024 | 09/18/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 8/30/2024
1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/6/2024
1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/17/2024
1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D
|
||||
| Footing/Setback Inspection | Partial Pass | 9/17/2024 | 9/17/2024 | 09/18/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
| Footing/Setback Inspection | Partial Pass | 9/19/2024 | 9/19/2024 | 09/19/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
| Footing/Setback Inspection | Partial Pass | 9/24/2024 | 9/24/2024 | 09/24/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/24/2024
1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02
2. footings approved by special inspection as marked up on city approved plans PG S2.01
|
||||
| Footing/Setback Inspection | Partial Pass | 9/30/2024 | 9/30/2024 | 09/30/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/24/2024
1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02
2. footings approved by special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/30/2024
1. walls approved per special inspection as marked up on city approved plans PG S20.1
|
||||
| Plumbing Below Slab Inspection | Partial Pass | 10/1/2024 | 10/1/2024 | 10/01/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 8/30/2024
1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 9/6/2024
1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 9/17/2024
1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D
|
||||
|
Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 10/1/2024
1. supply approved at 100 psi as marked up on city approved plans PG P1.01.D
2.fix leaks on DWV at trench drain and retest as discussed with contractor
|
||||
| Plumbing Below Slab Inspection | Partial Pass | 10/2/2024 | 10/2/2024 | 10/02/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 10/2/2024
1.this is the final under slab plumbing inspection approved as marked up on city approved plans PG P1.01D
|
||||
| Foundation/Rebar Inspection | Partial Pass | 10/2/2024 | 10/2/2024 | 10/02/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 9/6/2024
1.see notes on footing inspection todays date
|
||||
|
Other/Miscellaneous
Carried Forward
10/02/2024
9/16/2024
cancelled by contractor by phone
|
||||
|
Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 10/2/2024
1. phase 1 of slab pour approved per special inspection as marked up on city approved plans
|
||||
| Footing/Setback Inspection | Partial Pass | 10/9/2024 | 10/9/2024 | 10/09/2024 |
| Kevin Spruell ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/24/2024
1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02
2. footings approved by special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/30/2024
1. walls approved per special inspection as marked up on city approved plans PG S20.1
|
||||
|
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 10/9/2024
1. 2nd phase of slab approved to pour per special inspection
|
||||
| Frame Inspection | Failed | 11/8/2024 | 11/8/2024 | 11/08/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/08/2024
INSP FOR WEST EXT WALL.
provide details from architect/engineer for wall framing.
|
||||
| Frame Inspection | Partial Pass | 11/12/2024 | 11/12/2024 | 11/12/2024 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Partial Pass | 11/13/2024 | 11/13/2024 | 11/13/2024 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Partial Pass | 11/15/2024 | 11/15/2024 | 11/15/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
11/15/2024
parapet wall framing minus east wall ok.
|
||||
| Wallboard / Drywall Inspection | Failed | 11/18/2024 | 11/18/2024 | 11/18/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/18/2024
provide architects attachment detail for denseglass
|
||||
| Frame Inspection | Not Ready | 11/19/2024 | 11/19/2024 | 11/19/2024 |
| Monty Johnson ((253) 770-3326) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 11/19/2024 | 11/19/2024 | 11/19/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/19/2024
dense glass on parapets ok.
|
||||
| Frame Inspection | Partial Pass | 11/20/2024 | 11/20/2024 | 11/20/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
11/20/2024
ok to dense glass exterior walls of main building.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 11/25/2024 | 11/25/2024 | 11/25/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/25/2024
dense glass ext walls ok
|
||||
| Energy (Insulation) Inspection | Partial Pass | 12/3/2024 | 12/3/2024 | 12/03/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/03/2024
roof insulation progressing with special insp.
|
||||
| Frame Inspection | Partial Pass | 12/6/2024 | 12/6/2024 | 12/06/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
12/06/2024
ok to one side corridor head of wall.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 12/12/2024 | ||
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2024
1:head of wall at corridors ok.
|
||||
| Frame Inspection | Not Ready | 12/12/2024 | 12/12/2024 | 12/12/2024 |
| Monty Johnson ((253) 770-3326) | ||||
| Wallboard / Drywall Inspection | Not Ready | 12/23/2024 | 12/23/2024 | 12/23/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.
|
||||
| Frame Inspection | Not Ready | 12/23/2024 | 12/23/2024 | 12/23/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.
|
||||
| Plumbing Rough In Inspection | Not Ready | 12/23/2024 | 12/23/2024 | 12/23/2024 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.
|
||||
| Plumbing Rough In Inspection | Partial Pass | 12/30/2024 | 12/30/2024 | 12/30/2024 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
12/30/2024
1 ; cancel per contractor.
|
||||
|
Other/Miscellaneous
Carried Forward
12/30/2024
1:overhead supply in corridors ok
|
||||
| Comment Building Div Inspection | Not Ready | 1/4/2025 | 1/4/2025 | 01/03/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/03/2025
cancelled
|
||||
| Plumbing Rough In Inspection | Partial Pass | 1/7/2025 | 1/7/2025 | 01/07/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/07/2025
compressed air lines minus line to compressor ok at 235 psi
|
||||
| Plumbing Rough In Inspection | Not Ready | 1/8/2025 | 1/8/2025 | 01/08/2025 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Partial Pass | 1/8/2025 | 1/8/2025 | 01/08/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/08/2025
1 ; frame approved at grid line - (2 , west wall only as noted on sheet A2.20 & A2.21 except areas at hose Bibbs, and electrical at doors)
|
||||
| Energy (Insulation) Inspection | Partial Pass | 1/10/2025 | 1/10/2025 | 01/10/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/10/2025
west ext wall ok
|
||||
| Plumbing Rough In Inspection | Partial Pass | 1/10/2025 | 1/10/2025 | 01/10/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/10/2025
supply for ext walls ok and for main bathroom
|
||||
| Frame Inspection | Partial Pass | 1/10/2025 | 1/10/2025 | 01/10/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/10/2025
1:ext walls from grid line 2 to 4 -a- to -b- and 2 to 5 at -e- line ok to insulate, will need engineers rfi on ext wall bottom track attachment.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 1/13/2025 | 1/13/2025 | 01/13/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/13/2025
west ext wall ok
|
||||
| Plumbing Rough In Inspection | Partial Pass | 1/13/2025 | 1/13/2025 | 01/13/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/13/2025
in wall plumbing approved.
|
||||
|
Other/Miscellaneous
Carried Forward
01/13/2025
rough in approved
|
||||
| Frame Inspection | Partial Pass | 1/13/2025 | 1/13/2025 | 01/13/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
01/13/2025
1 ; cancel per contractor.
|
||||
|
Other/Miscellaneous
Carried Forward
01/13/2025
ext int walls ok
|
||||
| Hydrostatic Test 200Lbs 2Hrs | Passed | 1/13/2025 | 1/13/2025 | 01/13/2025 |
| David Drake ((253) 864-4171) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 1/15/2025 | 1/15/2025 | 01/15/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
01/15/2025
1 ; cancel per contractor.
|
||||
|
Other/Miscellaneous
Carried Forward
01/15/2025
1:rock on corridor side of corridors west of restrooms ok
2:1st layer of dbl layer wall rm 126 ok
|
||||
| Energy (Insulation) Inspection | Partial Pass | 1/15/2025 | 1/15/2025 | 01/15/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/15/2025
sound insulation electrical rm east wall of grid line 2 & grid line 2 north.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 1/22/2025 | 1/22/2025 | 01/22/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/22/2025
ext walls complete, interior sound insulation progressing with special inspection.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 1/23/2025 | 1/23/2025 | 01/23/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/23/2025
progressing
|
||||
| Mechanical Rough In Inspection | Not Ready | 1/27/2025 | 1/27/2025 | 01/27/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 1/30/2025 | 1/30/2025 | 01/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/30/2025
1:rock progressing and is screwed correctly with some of the bottom plate screws touched up.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 1/30/2025 | 1/30/2025 | 01/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/30/2025
perimeter walls on main building approved, sound insulation progressing with special.
|
||||
| Mechanical Rough In Inspection | Partial Pass | 1/31/2025 | 1/31/2025 | 01/31/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/31/2025
1:bathroom and com room exhaust duct ok.
|
||||
| Fire Or Smoke Damper Inspection | Not Ready | 2/7/2025 | 2/7/2025 | 02/07/2025 |
| David Drake ((253) 864-4171) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
02/07/2025
Email sent to Sean, do not schedule this permit for another permit. This creates a paper trail issue. Inspection has been canceled and will need to be recalled using the fire sprinkler permit. Fire Inspections are Monday - Thursday as stated in your permit conditions.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 2/10/2025 | 2/10/2025 | 02/10/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/10/2025
progressing.
|
||||
| Mechanical Final Inspection | Partial Pass | 2/11/2025 | 2/11/2025 | 02/11/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/11/2025
INSP FOR REFER LINES ONLY
1:all refer lines ninus appliance lab ok at 620 plus psi.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 2/12/2025 | 2/12/2025 | 02/12/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/12/2025
approved 1st layer of 2 layer sound walls
|
||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 2/15/2025 | 2/15/2025 | 02/15/2025 |
| Shannon King ((253) 840-6684) | ||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 2/14/2025 | 2/14/2025 | 02/15/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/15/2025
1 ; complete hanger wires as per plans in room 104.( inspection of room 104 only)
|
||||
| Foundation/Rebar Inspection | Passed w/ Conditions | 2/14/2025 | 2/14/2025 | 02/15/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 9/6/2024
1.see notes on footing inspection todays date
|
||||
|
Other/Miscellaneous
Outstanding
10/02/2024
9/16/2024
cancelled by contractor by phone
|
||||
|
Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 10/2/2024
1. phase 1 of slab pour approved per special inspection as marked up on city approved plans
|
||||
|
Other/Miscellaneous
Outstanding
02/15/2025
1 ; provide min. clearances from forms to rebar and soil to rebar.
2 ; complete corner bars as discussed with contractor.
ok to our with special inspection approval of corrections at retaining wall.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 2/18/2025 | 02/18/2025 | |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Failed | 2/19/2025 | 2/19/2025 | 02/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/19/2025
1:provide framing details for cloud framing on both sides of curtain wall.
|
||||
| Energy (Insulation) Inspection | Not Ready | 2/19/2025 | 2/19/2025 | 02/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Mechanical Rough In Inspection | Partial Pass | 2/19/2025 | 2/19/2025 | 02/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/19/2025
overhead mech above bathrooms ok
|
||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 2/19/2025 | 2/19/2025 | 02/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/19/2025
bathrooms ok.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 2/19/2025 | 2/19/2025 | 02/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/19/2025
1:rock at ext and most of interior approved, will need fsk, foil over exposed insulation.
|
||||
| Footing/Setback Inspection | Partial Pass | 2/20/2025 | 2/20/2025 | 02/20/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 8/29/2024
1. provide letter from EOR with comments regarding pipes running thru footing
2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/6/2024
1. provide engineers comments on conduits being to close together from previous pour
2.complete footings per city approved plans (size of footings)
3. complete min rebar clearances per city approved plans
4. provide new special inspection reports
5. complete rebar at wall locations as discussed with contractor
6.do not pour
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/10/2024
1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor
2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01
3. ok to pour
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/17/2024
1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area
2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/24/2024
1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02
2. footings approved by special inspection as marked up on city approved plans PG S2.01
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/30/2024
1. walls approved per special inspection as marked up on city approved plans PG S20.1
|
||||
|
Other/Miscellaneous
Resolved
02/20/2025
date of inspection 10/9/2024
1. 2nd phase of slab approved to pour per special inspection
|
||||
|
Other/Miscellaneous
Carried Forward
02/20/2025
progressing with special insp.
|
||||
| Frame Inspection | Failed | 2/20/2025 | 2/20/2025 | 02/20/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/20/2025
complete framing at clouds next to curtain wall as discussed.
|
||||
| Ceiling Grid/T-Bar Inspection | Failed | 2/20/2025 | 2/20/2025 | 02/20/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/20/2025
insp for hard lids in bathrooms
complete seismic bracing as discussed with mech contractor
|
||||
| Mechanical Rough In Inspection | Not Ready | 2/20/2025 | 2/20/2025 | 02/20/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/20/2025
complete bracing as discussed
|
||||
| Ceiling Grid/T-Bar Inspection | Partial Pass | 2/21/2025 | 2/21/2025 | 02/21/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/21/2025
1:restrooms ok
|
||||
| Frame Inspection | Partial Pass | 2/21/2025 | 2/21/2025 | 02/21/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
02/21/2025
cloud walls both side of curtain wall ok.
|
||||
| Mechanical Rough In Inspection | Partial Pass | 2/21/2025 | 2/21/2025 | 02/21/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/21/2025
siesmic bracing for mech above bathroom lids ok, ok to cover.
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 2/27/2025 | 2/27/2025 | 02/27/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/27/2025
classroom and restroom and entry way rock ok.
|
||||
| Gas Test Inspection | Partial Pass | 3/14/2025 | 3/14/2025 | 03/14/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/14/2025
approved main gas line test into building at 15 psi
|
||||
| Mechanical Rough In Inspection | Partial Pass | 3/19/2025 | 3/19/2025 | 03/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/19/2025
rtu (cu5) refer lines ok at 610 psi
cu3 appliance lab refer lines ok at 610 psi
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 4/1/2025 | 4/1/2025 | 04/01/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/01/2025
ext concrete board approved.
|
||||
| Mechanical Rough In Inspection | Partial Pass | 4/1/2025 | 4/1/2025 | 04/01/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/01/2025
talked about condensing units and drain pans.
|
||||
| Mechanical Rough In Inspection | Partial Pass | 4/17/2025 | 4/17/2025 | 04/17/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/17/2025
super provided paper work for shut off switches for overhead units, overhead units ok.
|
||||
| Ceiling Grid/T-Bar Inspection | Passed | 4/21/2025 | 4/21/2025 | 04/21/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Mechanical Rough In Inspection | Not Ready | 4/21/2025 | 4/21/2025 | 04/21/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Building Final Inspection | Not Ready | 4/30/2025 | 4/30/2025 | 04/30/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/30/2025
TALKED ABOUT FINAL REQUIRMENTS
1:provide all dept finals prior to building final
2:provide engineers, architects and special inspection final letters.
3:if rpba installed provide backflow cert.
4:complete life safety prior to equipment and furniture stocking.
|
||||
| Building Final Inspection | Not Ready | 5/5/2025 | 5/5/2025 | 05/05/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Plumbing Rough In Inspection | Partial Pass | 5/13/2025 | 5/13/2025 | 05/13/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
05/13/2025
ok to insulate water lines at appliance lab.
|
||||
| Mechanical Rough In Inspection | Not Ready | 5/16/2025 | 5/16/2025 | 05/16/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Plumbing Final Inspection | Failed | 6/17/2025 | 6/17/2025 | 06/17/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2025
1:provide backflow certs
2:complete plumbing boots
3:provide hammer arrestor at dishwasher and ice machine.
|
||||
| Mechanical Final Inspection | Failed | 6/17/2025 | 6/17/2025 | 06/17/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2025
RECEIVED BALANCE REPORT
1:PROVIDE MECH ENGINEERS CLEARANCES TO COMBUSTIBLES AT DURAVENT WITH WORST CASE SCENERIO (ALL OR MOST EQUIPMENT GOING AT ONCE)
2:PROVIDE CARBONS THRU OUT AS PER MECH ENGINEERS DIRECTION.
|
||||
| Plumbing Final Inspection | Passed | 6/24/2025 | 6/24/2025 | 06/24/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Mechanical Final Inspection | Passed | 6/24/2025 | 6/24/2025 | 06/24/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Emergency Radio Test Review Inspection | Passed | 07/07/2025 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Or Smoke Damper Inspection | VOID | 07/07/2025 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Final Inspection | Passed | 7/1/2025 | 7/3/2025 | 07/07/2025 |
| David Drake ((253) 864-4171) | ||||
| Comment Engineering Div Inspection | VOID | 07/09/2025 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Job Start Inspection | Passed | 07/09/2025 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Engineering Daily Inspection | Passed | 07/09/2025 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Erosion And Sediment Inspection | Passed | 07/09/2025 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Engineering Final Inspection | Passed | 07/10/2025 | ||
| Jeff Hill ((253) 204-5633) | ||||
| Building Final Inspection | Passed | 7/10/2025 | 7/11/2025 | 07/11/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Underfloor Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Slab/Insulation Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Block Wall Rebar Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Shear Wall Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Firewall/Firestop Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Refrigeration Line Test Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Exhaust/Vent Fans Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Planning Final Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Plumbing Below Slab Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 8/30/2024
1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D
|
||||
|
Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 9/6/2024
1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D
|
||||
|
Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 9/17/2024
1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D
|
||||
|
Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 10/1/2024
1. supply approved at 100 psi as marked up on city approved plans PG P1.01.D
2.fix leaks on DWV at trench drain and retest as discussed with contractor
|
||||
| Plumbing Below Slab Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 10/2/2024
1.this is the final under slab plumbing inspection approved as marked up on city approved plans PG P1.01D
|
||||
| Comment Building Div Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Frame Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Wallboard / Drywall Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Energy (Insulation) Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Footing/Setback Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Frame Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Ceiling Grid/T-Bar Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Frame Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Gas Test Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Wallboard / Drywall Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Plumbing Rough In Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Mechanical Rough In Inspection | VOID | 07/17/2025 | ||
| Joyce Kennedy ((253) 841-5405) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
Fire Prevention
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter. Battery backup required unless a generator is used for the lighting the circuit.
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
| Engineering Commercial Standard Conditions | Resolved | Standard Conditions |
|
Engineering Division
Development Engineering standard commercial conditions:
** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Occupancy will not be granted until all civil work associated with PRCCP20240215 has been completed and approval has been provided **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20240215 for specifications **
** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20240215 for specifications **
- All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Do not issue this permit until civil permit PRCCP20240215 has been issued. LL 04/02/2024
|
||
| Miscellaneous Condition | Resolved | Prior to Completion |
|
Engineering Division
Occupancy will not be granted until all work associated with civil permit PRCCP20240215 has been completed and a final inspection approved. LL 04/02/2024
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Planning Division
The multi-unit commercial / residential 4-plex and commercial / residential “village” is for training purposes associated with the vocational school use and not approved for residential use.
|
||
| Miscellaneous Condition | Open | SEPA Condition |
|
Planning Division
Planning Condition of Approval: Prior to starting earth work (ground disturbance) the Cultural Resource Consultants (CRC) shall notify Mike Shong, Puyallup Tribe of Indians Archaeologist, of the MIDP active monitoring schedule to ensure that there is opportunity for a site visit when cultural resource monitoring is occurring. Contact Mike Shong at Mike.Shong@puyalluptribe-nsn.gov or (253) 573-7897 or (253) 339-1967. CRC shall continue to coordinate with the Puyallup Tribe of Indians Archaeologist throughout the project and provide a Monitoring Report when completed. Contact Rachael Brown, Associate Planner with questions about this condition, RNBrown@puyallupwa.gov, 253-770-3363.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.