CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20240216


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20240216
Commercial - New Construction
Closed
PUGET SOUND ENERGY INC
THE PROPOSED PROJECT IS FOR A NEW OPERATIONAL TRAINING CENTER. THE PROJECT IS COMPOSED OF THE MAIN OTC BUILDING, AND OUTDOOR TRAINING AREA. IT WILL BE USED AS A VOCATIONAL SCHOOL FOR UTILITY FIRST RESPONDERS AND CONSTRUCTION TRADES. THE OTC BUILDING WILL CONSIST OF OFFICE/COMMERCIAL/INSTRUCTIONAL SPACES, AND COVERED AREA.THE OUTDOOR TRAINING AREA WILL CONSIST OF MULTIPLE ENCLOSED SINGLE STORY STRUCTURES. * REV (1) 10/11/2024 - GYPSUM BOARD ASSEMBLIES (EXTERIOR) WITH ENGINEERING & (10/21/2024 ADDED TO REV (1)) - OPEN WEB STEEL JOISTS * REVISION (2) - 10/31/2024 - BRACE FRAME * REVISION (3) - 11/20/2024 - COLD FORMED METAL FRAMING DESIGN (INTERIOR) * REVISION (4) - 1/2/2025 - VILLAGE BUILDINGS WOOD TRUSS DESIGN SUBMITTAL
02/12/2024
07/23/2024
01/07/2026
07/11/2025

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 01/31/2025 01/10/2025
Building Review Approved 12/20/2024 12/04/2024
Building Review Approved 12/03/2024 11/14/2024
Building Review Approved 11/19/2024 10/22/2024
Building Review Failed 11/08/2024 10/16/2024
Engineering Traffic Review Approved 06/27/2024 06/24/2024
Building Review Approved 06/27/2024 06/13/2024
Engineering Review Approved 06/27/2024 06/12/2024
Planning Review Approved 06/27/2024 06/12/2024
Fire Review Approved 06/27/2024 05/30/2024
Building Review Failed 05/16/2024 05/20/2024
Fire Review Approved 05/16/2024 05/20/2024
Planning Review Approved 05/16/2024 05/17/2024
Engineering Review Failed 05/16/2024 05/13/2024
Engineering Traffic Review Approved 05/16/2024 04/22/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 07/22/2024
Planning Landscape Review Fee $300.00 $300.00 Paid 07/22/2024
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $215.70 $215.70 Paid 07/22/2024
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $58.20 $58.20 Paid 07/22/2024
Mechanical Duct Work Fee $24.00 $24.00 Paid 07/22/2024
Unclassified Appliance or Equipment Fee $225.60 $225.60 Paid 07/22/2024
Suspended, Recessed Wall, or Floor unit Heater Fee $156.40 $156.40 Paid 07/22/2024
Ventilation System (apart from Heating/AC) Fee $42.30 $42.30 Paid 07/22/2024
Air Handling Unit (Up to 10,000 cfm) Fee $352.50 $352.50 Paid 07/22/2024
Building Permit Fee $13,777.45 $13,777.45 Paid 07/22/2024
Planning Building Permit Fee $120.00 $120.00 Paid 07/22/2024
Mechanical Permit Fee $40.00 $40.00 Paid 07/22/2024
Backflow Preventor Fee $78.00 $78.00 Paid 02/22/2024
Plumbing Permit Fee $40.00 $40.00 Paid 07/22/2024
Drinking Fountain, Water Cooler, Ice Machine Fee $80.50 $80.50 Paid 07/22/2024
Garbage Disposal Fee $13.00 $13.00 Paid 07/22/2024
Gas Piping (Plumbing) Fee $134.50 $134.50 Paid 07/22/2024
Plumbing Fixtures Fee $546.00 $546.00 Paid 07/22/2024
Water Heater Fee $273.00 $273.00 Paid 07/22/2024
Building Plan Review Fee $8,955.34 $8,955.34 Paid 02/22/2024
Mechanical Plan Review Fee $724.56 $724.56 Paid 02/22/2024
Plumbing Plan Review Fee $757.25 $757.25 Paid 02/22/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/22/2024
Mechanical Plan Review Fee $724.56 $724.56 Paid 03/14/2024
Traffic Impact Fee (Commercial) $261,000.00 $261,000.00 Paid 07/22/2024
Park Impact Fee (Manufacturing) $33,756.00 $33,756.00 Paid 07/22/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 05/28/2024
Sewer System Development Charge $53,189.79 $53,189.79 Paid 07/22/2024
Water System Development Charge $26,665.92 $26,665.92 Paid 07/22/2024
Inspection Fee - Outside Of Business Hours $180.00 $180.00 Paid 10/01/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 10/14/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 10/23/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 11/04/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 11/27/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 01/06/2025
Inspection Fee - Outside Of Business Hours $540.00 $540.00 Paid 02/14/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Not Ready 8/5/2024 8/5/2024 08/05/2024
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection Not Ready 8/26/2024 8/26/2024 08/26/2024
Kevin Spruell ((253) 841-5590)
Footing/Setback Inspection Not Ready 8/26/2024 8/26/2024 08/26/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/26/2024
1. this was a comment inspection 2. discussed job and sequence of inspections

Erosion And Sediment Inspection Partial Pass 08/27/2024
Jeff Hill ((253) 204-5633)
Foundation/Rebar Inspection Not Ready 8/29/2024 8/29/2024 08/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/29/2024 1. called in error

Footing/Setback Inspection Partial Pass 8/29/2024 8/29/2024 08/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
08/30/2024
1. this was a comment inspection 2. discussed job and sequence of inspections

Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Plumbing Below Slab Inspection Partial Pass 8/30/2024 8/30/2024 08/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/30/2024
date of inspection 8/30/2024 1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D

Footing/Setback Inspection Failed 9/6/2024 9/6/2024 09/06/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Foundation/Rebar Inspection Not Ready 9/6/2024 9/6/2024 09/06/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
09/06/2024
date of inspection 8/29/2024 1. called in error

Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 9/6/2024 1.see notes on footing inspection todays date

Plumbing Below Slab Inspection Partial Pass 9/6/2024 9/6/2024 09/09/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/09/2024
date of inspection 8/30/2024 1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D

Other/Miscellaneous
Carried Forward
09/09/2024
date of inspection 9/6/2024 1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D

Footing/Setback Inspection Partial Pass 9/10/2024 9/10/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Foundation/Rebar Inspection Not Ready 9/16/2024 9/16/2024 09/16/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/16/2024
date of inspection 9/6/2024 1.see notes on footing inspection todays date

Other/Miscellaneous
Carried Forward
09/16/2024
9/16/2024 cancelled by contractor by phone

Plumbing Below Slab Inspection Partial Pass 9/17/2024 9/17/2024 09/18/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 8/30/2024 1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D

Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/6/2024 1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D

Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/17/2024 1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D

Footing/Setback Inspection Partial Pass 9/17/2024 9/17/2024 09/18/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Carried Forward
09/18/2024
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Footing/Setback Inspection Partial Pass 9/19/2024 9/19/2024 09/19/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Footing/Setback Inspection Partial Pass 9/24/2024 9/24/2024 09/24/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/24/2024 1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02 2. footings approved by special inspection as marked up on city approved plans PG S2.01

Footing/Setback Inspection Partial Pass 9/30/2024 9/30/2024 09/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/24/2024 1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02 2. footings approved by special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/30/2024 1. walls approved per special inspection as marked up on city approved plans PG S20.1

Plumbing Below Slab Inspection Partial Pass 10/1/2024 10/1/2024 10/01/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 8/30/2024 1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 9/6/2024 1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 9/17/2024 1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 10/1/2024 1. supply approved at 100 psi as marked up on city approved plans PG P1.01.D 2.fix leaks on DWV at trench drain and retest as discussed with contractor

Plumbing Below Slab Inspection Partial Pass 10/2/2024 10/2/2024 10/02/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 10/2/2024 1.this is the final under slab plumbing inspection approved as marked up on city approved plans PG P1.01D

Foundation/Rebar Inspection Partial Pass 10/2/2024 10/2/2024 10/02/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 9/6/2024 1.see notes on footing inspection todays date

Other/Miscellaneous
Carried Forward
10/02/2024
9/16/2024 cancelled by contractor by phone

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 10/2/2024 1. phase 1 of slab pour approved per special inspection as marked up on city approved plans

Footing/Setback Inspection Partial Pass 10/9/2024 10/9/2024 10/09/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/24/2024 1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02 2. footings approved by special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 9/30/2024 1. walls approved per special inspection as marked up on city approved plans PG S20.1

Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 10/9/2024 1. 2nd phase of slab approved to pour per special inspection

Frame Inspection Failed 11/8/2024 11/8/2024 11/08/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/08/2024
INSP FOR WEST EXT WALL. provide details from architect/engineer for wall framing.

Frame Inspection Partial Pass 11/12/2024 11/12/2024 11/12/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 11/13/2024 11/13/2024 11/13/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 11/15/2024 11/15/2024 11/15/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
11/15/2024
parapet wall framing minus east wall ok.

Wallboard / Drywall Inspection Failed 11/18/2024 11/18/2024 11/18/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/18/2024
provide architects attachment detail for denseglass

Frame Inspection Not Ready 11/19/2024 11/19/2024 11/19/2024
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Partial Pass 11/19/2024 11/19/2024 11/19/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/19/2024
dense glass on parapets ok.

Frame Inspection Partial Pass 11/20/2024 11/20/2024 11/20/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
11/20/2024
ok to dense glass exterior walls of main building.

Wallboard / Drywall Inspection Partial Pass 11/25/2024 11/25/2024 11/25/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/25/2024
dense glass ext walls ok

Energy (Insulation) Inspection Partial Pass 12/3/2024 12/3/2024 12/03/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/03/2024
roof insulation progressing with special insp.

Frame Inspection Partial Pass 12/6/2024 12/6/2024 12/06/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
12/06/2024
ok to one side corridor head of wall.

Wallboard / Drywall Inspection Partial Pass 12/12/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/12/2024
1:head of wall at corridors ok.

Frame Inspection Not Ready 12/12/2024 12/12/2024 12/12/2024
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Not Ready 12/23/2024 12/23/2024 12/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.

Frame Inspection Not Ready 12/23/2024 12/23/2024 12/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.

Plumbing Rough In Inspection Not Ready 12/23/2024 12/23/2024 12/23/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/23/2024
1 ; cancel per contractor.

Plumbing Rough In Inspection Partial Pass 12/30/2024 12/30/2024 12/30/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
12/30/2024
1 ; cancel per contractor.

Other/Miscellaneous
Carried Forward
12/30/2024
1:overhead supply in corridors ok

Comment Building Div Inspection Not Ready 1/4/2025 1/4/2025 01/03/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/03/2025
cancelled

Plumbing Rough In Inspection Partial Pass 1/7/2025 1/7/2025 01/07/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/07/2025
compressed air lines minus line to compressor ok at 235 psi

Plumbing Rough In Inspection Not Ready 1/8/2025 1/8/2025 01/08/2025
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 1/8/2025 1/8/2025 01/08/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/08/2025
1 ; frame approved at grid line - (2 , west wall only as noted on sheet A2.20 & A2.21 except areas at hose Bibbs, and electrical at doors)

Energy (Insulation) Inspection Partial Pass 1/10/2025 1/10/2025 01/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/10/2025
west ext wall ok

Plumbing Rough In Inspection Partial Pass 1/10/2025 1/10/2025 01/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/10/2025
supply for ext walls ok and for main bathroom

Frame Inspection Partial Pass 1/10/2025 1/10/2025 01/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
01/10/2025
1:ext walls from grid line 2 to 4 -a- to -b- and 2 to 5 at -e- line ok to insulate, will need engineers rfi on ext wall bottom track attachment.

Energy (Insulation) Inspection Partial Pass 1/13/2025 1/13/2025 01/13/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/13/2025
west ext wall ok

Plumbing Rough In Inspection Partial Pass 1/13/2025 1/13/2025 01/13/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/13/2025
in wall plumbing approved.

Other/Miscellaneous
Carried Forward
01/13/2025
rough in approved

Frame Inspection Partial Pass 1/13/2025 1/13/2025 01/13/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
01/13/2025
1 ; cancel per contractor.

Other/Miscellaneous
Carried Forward
01/13/2025
ext int walls ok

Hydrostatic Test 200Lbs 2Hrs Passed 1/13/2025 1/13/2025 01/13/2025
David Drake ((253) 864-4171)
Wallboard / Drywall Inspection Partial Pass 1/15/2025 1/15/2025 01/15/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
01/15/2025
1 ; cancel per contractor.

Other/Miscellaneous
Carried Forward
01/15/2025
1:rock on corridor side of corridors west of restrooms ok 2:1st layer of dbl layer wall rm 126 ok

Energy (Insulation) Inspection Partial Pass 1/15/2025 1/15/2025 01/15/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/15/2025
sound insulation electrical rm east wall of grid line 2 & grid line 2 north.

Energy (Insulation) Inspection Partial Pass 1/22/2025 1/22/2025 01/22/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/22/2025
ext walls complete, interior sound insulation progressing with special inspection.

Wallboard / Drywall Inspection Partial Pass 1/23/2025 1/23/2025 01/23/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/23/2025
progressing

Mechanical Rough In Inspection Not Ready 1/27/2025 1/27/2025 01/27/2025
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Partial Pass 1/30/2025 1/30/2025 01/30/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/30/2025
1:rock progressing and is screwed correctly with some of the bottom plate screws touched up.

Energy (Insulation) Inspection Partial Pass 1/30/2025 1/30/2025 01/30/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/30/2025
perimeter walls on main building approved, sound insulation progressing with special.

Mechanical Rough In Inspection Partial Pass 1/31/2025 1/31/2025 01/31/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/31/2025
1:bathroom and com room exhaust duct ok.

Fire Or Smoke Damper Inspection Not Ready 2/7/2025 2/7/2025 02/07/2025
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Outstanding
02/07/2025
Email sent to Sean, do not schedule this permit for another permit. This creates a paper trail issue. Inspection has been canceled and will need to be recalled using the fire sprinkler permit. Fire Inspections are Monday - Thursday as stated in your permit conditions.

Wallboard / Drywall Inspection Partial Pass 2/10/2025 2/10/2025 02/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/10/2025
progressing.

Mechanical Final Inspection Partial Pass 2/11/2025 2/11/2025 02/11/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/11/2025
INSP FOR REFER LINES ONLY 1:all refer lines ninus appliance lab ok at 620 plus psi.

Wallboard / Drywall Inspection Partial Pass 2/12/2025 2/12/2025 02/12/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/12/2025
approved 1st layer of 2 layer sound walls

Ceiling Grid/T-Bar Inspection Partial Pass 2/15/2025 2/15/2025 02/15/2025
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 2/14/2025 2/14/2025 02/15/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
02/15/2025
1 ; complete hanger wires as per plans in room 104.( inspection of room 104 only)

Foundation/Rebar Inspection Passed w/ Conditions 2/14/2025 2/14/2025 02/15/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 9/6/2024 1.see notes on footing inspection todays date

Other/Miscellaneous
Outstanding
10/02/2024
9/16/2024 cancelled by contractor by phone

Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 10/2/2024 1. phase 1 of slab pour approved per special inspection as marked up on city approved plans

Other/Miscellaneous
Outstanding
02/15/2025
1 ; provide min. clearances from forms to rebar and soil to rebar. 2 ; complete corner bars as discussed with contractor. ok to our with special inspection approval of corrections at retaining wall.

Wallboard / Drywall Inspection Partial Pass 2/18/2025 02/18/2025
Shannon King ((253) 840-6684)
Frame Inspection Failed 2/19/2025 2/19/2025 02/19/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/19/2025
1:provide framing details for cloud framing on both sides of curtain wall.

Energy (Insulation) Inspection Not Ready 2/19/2025 2/19/2025 02/19/2025
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Partial Pass 2/19/2025 2/19/2025 02/19/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/19/2025
overhead mech above bathrooms ok

Ceiling Grid/T-Bar Inspection Partial Pass 2/19/2025 2/19/2025 02/19/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/19/2025
bathrooms ok.

Wallboard / Drywall Inspection Partial Pass 2/19/2025 2/19/2025 02/19/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/19/2025
1:rock at ext and most of interior approved, will need fsk, foil over exposed insulation.

Footing/Setback Inspection Partial Pass 2/20/2025 2/20/2025 02/20/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
02/20/2025
date of inspection 8/29/2024 1. provide letter from EOR with comments regarding pipes running thru footing 2. footings approved per special inspection as marked up on city approved plans pages S.202 and S.201

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/6/2024 1. provide engineers comments on conduits being to close together from previous pour 2.complete footings per city approved plans (size of footings) 3. complete min rebar clearances per city approved plans 4. provide new special inspection reports 5. complete rebar at wall locations as discussed with contractor 6.do not pour

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/10/2024 1. provide letter from EOR regarding reduced clearances for rebar as discussed with contractor 2. footings and foundation walls approved per special inspection as marked up on city approved plans pages S2.02 S2.01 3. ok to pour

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/17/2024 1.provide engineer of record approved documents to support footing that due not city approved plans at electrical trench do not pour this area 2.footings and walls approved per special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/24/2024 1.plench's at westside of building approved by special inspection as marked up on city approved plans PG S2.02 2. footings approved by special inspection as marked up on city approved plans PG S2.01

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 9/30/2024 1. walls approved per special inspection as marked up on city approved plans PG S20.1

Other/Miscellaneous
Resolved
02/20/2025
date of inspection 10/9/2024 1. 2nd phase of slab approved to pour per special inspection

Other/Miscellaneous
Carried Forward
02/20/2025
progressing with special insp.

Frame Inspection Failed 2/20/2025 2/20/2025 02/20/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/20/2025
complete framing at clouds next to curtain wall as discussed.

Ceiling Grid/T-Bar Inspection Failed 2/20/2025 2/20/2025 02/20/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/20/2025
insp for hard lids in bathrooms complete seismic bracing as discussed with mech contractor

Mechanical Rough In Inspection Not Ready 2/20/2025 2/20/2025 02/20/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/20/2025
complete bracing as discussed

Ceiling Grid/T-Bar Inspection Partial Pass 2/21/2025 2/21/2025 02/21/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/21/2025
1:restrooms ok

Frame Inspection Partial Pass 2/21/2025 2/21/2025 02/21/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
02/21/2025
cloud walls both side of curtain wall ok.

Mechanical Rough In Inspection Partial Pass 2/21/2025 2/21/2025 02/21/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/21/2025
siesmic bracing for mech above bathroom lids ok, ok to cover.

Wallboard / Drywall Inspection Partial Pass 2/27/2025 2/27/2025 02/27/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/27/2025
classroom and restroom and entry way rock ok.

Gas Test Inspection Partial Pass 3/14/2025 3/14/2025 03/14/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
03/14/2025
approved main gas line test into building at 15 psi

Mechanical Rough In Inspection Partial Pass 3/19/2025 3/19/2025 03/19/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
03/19/2025
rtu (cu5) refer lines ok at 610 psi cu3 appliance lab refer lines ok at 610 psi

Wallboard / Drywall Inspection Partial Pass 4/1/2025 4/1/2025 04/01/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/01/2025
ext concrete board approved.

Mechanical Rough In Inspection Partial Pass 4/1/2025 4/1/2025 04/01/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/01/2025
talked about condensing units and drain pans.

Mechanical Rough In Inspection Partial Pass 4/17/2025 4/17/2025 04/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/17/2025
super provided paper work for shut off switches for overhead units, overhead units ok.

Ceiling Grid/T-Bar Inspection Passed 4/21/2025 4/21/2025 04/21/2025
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Not Ready 4/21/2025 4/21/2025 04/21/2025
Monty Johnson ((253) 770-3326)
Building Final Inspection Not Ready 4/30/2025 4/30/2025 04/30/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/30/2025
TALKED ABOUT FINAL REQUIRMENTS 1:provide all dept finals prior to building final 2:provide engineers, architects and special inspection final letters. 3:if rpba installed provide backflow cert. 4:complete life safety prior to equipment and furniture stocking.

Building Final Inspection Not Ready 5/5/2025 5/5/2025 05/05/2025
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection Partial Pass 5/13/2025 5/13/2025 05/13/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/13/2025
ok to insulate water lines at appliance lab.

Mechanical Rough In Inspection Not Ready 5/16/2025 5/16/2025 05/16/2025
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection Failed 6/17/2025 6/17/2025 06/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/17/2025
1:provide backflow certs 2:complete plumbing boots 3:provide hammer arrestor at dishwasher and ice machine.

Mechanical Final Inspection Failed 6/17/2025 6/17/2025 06/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/17/2025
RECEIVED BALANCE REPORT 1:PROVIDE MECH ENGINEERS CLEARANCES TO COMBUSTIBLES AT DURAVENT WITH WORST CASE SCENERIO (ALL OR MOST EQUIPMENT GOING AT ONCE) 2:PROVIDE CARBONS THRU OUT AS PER MECH ENGINEERS DIRECTION.

Plumbing Final Inspection Passed 6/24/2025 6/24/2025 06/24/2025
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection Passed 6/24/2025 6/24/2025 06/24/2025
Monty Johnson ((253) 770-3326)
Emergency Radio Test Review Inspection Passed 07/07/2025
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection VOID 07/07/2025
David Drake ((253) 864-4171)
Fire Final Inspection Passed 7/1/2025 7/3/2025 07/07/2025
David Drake ((253) 864-4171)
Comment Engineering Div Inspection VOID 07/09/2025
Jeff Hill ((253) 204-5633)
Job Start Inspection Passed 07/09/2025
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Passed 07/09/2025
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Passed 07/09/2025
Jeff Hill ((253) 204-5633)
Engineering Final Inspection Passed 07/10/2025
Jeff Hill ((253) 204-5633)
Building Final Inspection Passed 7/10/2025 7/11/2025 07/11/2025
Monty Johnson ((253) 770-3326)
Underfloor Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Slab/Insulation Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Block Wall Rebar Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Shear Wall Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Firewall/Firestop Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Refrigeration Line Test Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Exhaust/Vent Fans Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Planning Final Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Plumbing Below Slab Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Corrections:


Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 8/30/2024 1.under slab DWV approved as marked up on city approved plans pages P1.01C and P1.01D

Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 9/6/2024 1.DWV under slab approved as marked up on city approved plans pages P1.01A , P1.01C ,P1.01D

Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 9/17/2024 1. below slab plumbing approved as marked up on city approved plans pgs P1.01A and P1.01D

Other/Miscellaneous
Outstanding
10/01/2024
date of inspection 10/1/2024 1. supply approved at 100 psi as marked up on city approved plans PG P1.01.D 2.fix leaks on DWV at trench drain and retest as discussed with contractor

Plumbing Below Slab Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Corrections:


Other/Miscellaneous
Outstanding
10/02/2024
date of inspection 10/2/2024 1.this is the final under slab plumbing inspection approved as marked up on city approved plans PG P1.01D

Comment Building Div Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Frame Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Wallboard / Drywall Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Energy (Insulation) Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Footing/Setback Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Frame Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Ceiling Grid/T-Bar Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Frame Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Gas Test Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Wallboard / Drywall Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Plumbing Rough In Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)
Mechanical Rough In Inspection VOID 07/17/2025
Joyce Kennedy ((253) 841-5405)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
Fire Prevention
• Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter. Battery backup required unless a generator is used for the lighting the circuit. • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: ** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** Occupancy will not be granted until all civil work associated with PRCCP20240215 has been completed and approval has been provided ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20240215 for specifications ** ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20240215 for specifications ** - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Do not issue this permit until civil permit PRCCP20240215 has been issued. LL 04/02/2024
Miscellaneous Condition Resolved Prior to Completion
Engineering Division
Occupancy will not be granted until all work associated with civil permit PRCCP20240215 has been completed and a final inspection approved. LL 04/02/2024
Miscellaneous Condition Open Standard Conditions
Planning Division
The multi-unit commercial / residential 4-plex and commercial / residential “village” is for training purposes associated with the vocational school use and not approved for residential use.
Miscellaneous Condition Open SEPA Condition
Planning Division
Planning Condition of Approval: Prior to starting earth work (ground disturbance) the Cultural Resource Consultants (CRC) shall notify Mike Shong, Puyallup Tribe of Indians Archaeologist, of the MIDP active monitoring schedule to ensure that there is opportunity for a site visit when cultural resource monitoring is occurring. Contact Mike Shong at Mike.Shong@puyalluptribe-nsn.gov or (253) 573-7897 or (253) 339-1967. CRC shall continue to coordinate with the Puyallup Tribe of Indians Archaeologist throughout the project and provide a Monitoring Report when completed. Contact Rachael Brown, Associate Planner with questions about this condition, RNBrown@puyallupwa.gov, 253-770-3363.

Related Permit & Planning Applications

Reference Number Status Type
E-19-0538 Closed Clear, Fill, & Grade Permit
PRAMR20231722 Closed Alternative Methods / Materials Request
PRCNC20231747 Canceled Commercial - New Construction
PRCCP20240215 Closed Civil Construction Permit
PRGR20240391 Closed Clear, Fill, & Grade Permit
PRCNC20241049 Closed Commercial - New Construction
PRCNC20241050 Closed Commercial - New Construction
PRCNC20241051 Closed Commercial - New Construction
PRCNC20241052 Closed Commercial - New Construction
PRFN20241253 Closed Fence
PRCNC20241576 Closed Commercial - New Construction
PRFS20241715 Closed Fire Sprinklers
PRFA20241983 Closed Fire Alarms
PRAMR20250001 Closed Alternative Methods / Materials Request
PRSOL20250112 Closed Solar Panel Permit
PRAMR20250344 Closed Alternative Methods / Materials Request
PRSG20250392 Closed Sign/Awning
PRCTI20250486 Closed Commercial - Tenant Improvement/Remodel
PRCTI20250781 Closed Commercial - Tenant Improvement/Remodel
PRMH20260004 Closed Mechanical - COMMERCIAL ONLY
PLPRE20220160 File Closed Pre-Application
PLLC20230017 File Closed Lot Combination
PLPSP20230096 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
02/22/2024 Receipt Receipt for transaction: 2024-000327
03/14/2024 Receipt Receipt for transaction:2024-000511
05/28/2024 Receipt Receipt for transaction:2024-001100
07/01/2024 Plans SITE PLAN - RESUB (Stamped)
07/01/2024 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
07/01/2024 Form ENVELOPE REQUIREMENTS - CONTROL HOUSE (Stamped)
07/01/2024 Form ENVELOPE REQUIREMENTS - OTC (Stamped)
07/01/2024 Form MECHANICAL COMPLIANCE - OTC (Stamped)
07/01/2024 Form ENVELOPE COMPLIANCE - CONTROL HOUSE (Stamped)
07/01/2024 Form ENVELOPE COMPLIANCE - OTC (Stamped)
07/01/2024 Form MECH REQUIREMENTS - CONTROL HOUSE (Stamped)
07/01/2024 Form MECH COMPLIANCE - CONTROL HOUSE (Stamped)
07/01/2024 Form LIGHTING COMPLIANCE - CONTROL HOUSE (Stamped)
07/01/2024 Form LIGHTING REQUIREMENTS - CONTROL HOUSE (Stamped)
07/01/2024 Form LIGHTING COMPLIANCE - OTC (Stamped)
07/01/2024 Form LIGHTING REQUIREMENTS - OTC (Stamped)
07/01/2024 Form MECH REQUIREMENTS - OTC (Stamped)
07/01/2024 Report STRUCT CALCS (Stamped)
07/01/2024 Plans HVAC LOADS (Stamped)
07/01/2024 Specifications PROJECT SPECIFICATIONS (Stamped)
07/01/2024 Report HAZARDOUS MATERIAL INVENTORY STATEMENT (Stamped)
07/01/2024 Form PLUMBING FIXTURE WORKSHEET - RESUB (Stamped)
07/01/2024 Report GEOTECH REPORT (Stamped)
07/22/2024 Receipt Receipt for transaction: 2024-001505
07/22/2024 Receipt Receipt for transaction: 2024-001505
07/23/2024 Permit Permit - Detailed
08/05/2024 Report Inspection Report (Comment Building Div Inspection)
08/26/2024 Report Inspection Report (Foundation/Rebar Inspection)
08/26/2024 Report Inspection Report (Footing/Setback Inspection)
08/30/2024 Report Inspection Report (Foundation/Rebar Inspection)
08/30/2024 Report Inspection Report (Footing/Setback Inspection)
08/30/2024 Report Inspection Report (Plumbing Below Slab Inspection)
09/06/2024 Report Inspection Report (Footing/Setback Inspection)
09/06/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/09/2024 Report Inspection Report (Plumbing Below Slab Inspection)
09/11/2024 Report Inspection Report (Footing/Setback Inspection)
09/16/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/18/2024 Report Inspection Report (Plumbing Below Slab Inspection)
09/18/2024 Report Inspection Report (Footing/Setback Inspection)
09/24/2024 Report Inspection Report (Footing/Setback Inspection)
09/30/2024 Report Inspection Report (Footing/Setback Inspection)
10/01/2024 Receipt Receipt for transaction:2024-002065
10/01/2024 Report Inspection Report (Plumbing Below Slab Inspection)
10/02/2024 Report Inspection Report (Plumbing Below Slab Inspection)
10/02/2024 Report Inspection Report (Foundation/Rebar Inspection)
10/09/2024 Report Inspection Report (Footing/Setback Inspection)
10/14/2024 Receipt Receipt for transaction:2024-002146
10/22/2024 Plans CONSTRUCTION PLAN SET REV (1) GYPSUM BOARD ASSEMBLIES (Stamped)
10/22/2024 Plans CONSTRUCTION PLAN SET REV (1) OPEN WEB STEEL JOISTS (Stamped)
10/23/2024 Receipt Receipt for transaction:2024-002205
11/04/2024 Receipt Receipt for transaction:2024-002288
11/12/2024 Report Inspection Report (Frame Inspection)
11/13/2024 Report Inspection Report (Frame Inspection)
11/15/2024 Report STRUCTURAL CALCS - RESUB (2) (Stamped)
11/15/2024 Plans CONSTRUCTION PLAN SET - REV (2) (Stamped)
11/15/2024 Plans STRUCTURAL PLANS - REV (2) (Stamped)
11/27/2024 Receipt Receipt for transaction:2024-002473
12/04/2024 Plans CONSTRUCTION PLAN SET - REV (3) (Stamped)
12/23/2024 Report Inspection Report (Wallboard / Drywall Inspection)
12/23/2024 Report Inspection Report (Frame Inspection)
01/06/2025 Receipt Receipt for transaction:2025-000022
01/08/2025 Report Inspection Report (Plumbing Rough In Inspection)
01/08/2025 Report Inspection Report (Frame Inspection)
01/13/2025 Report TRUSS SPECS W/ENGINEERS STAMPENGINEERS STAMP (Stamped)
02/14/2025 Receipt Receipt for transaction:2025-000321
02/15/2025 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
02/15/2025 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
02/15/2025 Report Inspection Report (Foundation/Rebar Inspection)
02/18/2025 Report Inspection Report (Wallboard / Drywall Inspection)
07/11/2025 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.