Permit Application Status
PRCTI20250011
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 05/09/2025 |
Air Handling Unit (Over 10,000 cfm) Fee | $23.92 | $23.92 | Paid | 05/09/2025 |
Building Permit Fee | $2,684.95 | $2,684.95 | Paid | 05/09/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 05/09/2025 |
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 01/06/2025 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 05/09/2025 |
Drinking Fountain, Water Cooler, Ice Machine Fee | $120.75 | $120.75 | Paid | 05/09/2025 |
Plumbing Fixtures Fee | $169.00 | $169.00 | Paid | 05/09/2025 |
Water Heater Fee | $26.00 | $26.00 | Paid | 05/09/2025 |
Building Plan Review Fee | $1,745.22 | $1,745.22 | Paid | 01/06/2025 |
Mechanical Plan Review Fee | $41.55 | $41.55 | Paid | 01/06/2025 |
Plumbing Plan Review Fee | $248.14 | $248.14 | Paid | 01/06/2025 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 05/09/2025 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $18,006.38 | $18,006.38 | Paid | 05/09/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 02/21/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/23/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $23,821.91 | $23,821.91 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exit Lighting Test Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydronic Piping Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Shower Pan Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Final Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Wallboard / Drywall Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Pending | 6/25/2025 | 6/25/2025 | |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Partial Pass | 5/15/2025 | 5/15/2025 | 05/15/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/15/2025
ok to 1 side store front wall.
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/20/2025 | 5/20/2025 | 05/20/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/20/2025
1:restroom below slab ok
2:north half cafe below slab ok
3:provide designated vent for interceptor and remove dishwasher line from interceptor.
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/21/2025 | 5/21/2025 | 05/21/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/21/2025
1:below slab plumbing approved
|
||||
Foundation/Rebar Inspection | Partial Pass | 5/21/2025 | 5/21/2025 | 05/21/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/21/2025
1:slab infill minus kitchen area ok.
|
||||
Slab/Insulation Inspection | Passed | 5/22/2025 | 5/22/2025 | 05/22/2025 |
Monty Johnson ((253) 770-3326) | ||||
Wallboard / Drywall Inspection | Partial Pass | 6/3/2025 | 6/3/2025 | 06/03/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/03/2025
1: 1st layer on mall side of storefront wall ok.
|
||||
Frame Inspection | Not Ready | 6/12/2025 | 6/12/2025 | 06/12/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/12/2025
provide approved plans
provide as build approval for store front wall, (gravity) as header was removed by shell contractor.
|
||||
Frame Inspection | Not Ready | 6/13/2025 | 6/13/2025 | 06/13/2025 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Partial Pass | 6/18/2025 | 6/18/2025 | 06/18/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/18/2025
duct work above bathrooms ok to insulate
|
||||
Wallboard / Drywall Inspection | Not Ready | 6/18/2025 | 6/18/2025 | 06/18/2025 |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Partial Pass | 6/18/2025 | 6/18/2025 | 06/18/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/18/2025
1:provide test on rain leaders west ext wall
2:ext firred walls ok to insulate
3:ok to insulate full height wall.
|
||||
Plumbing Rough In Inspection | Partial Pass | 6/24/2025 | 6/24/2025 | 06/24/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/24/2025
1:restrooms, drinking fountain and break room ok
|
||||
Frame Inspection | Partial Pass | 6/24/2025 | 6/24/2025 | 06/24/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/24/2025
frame ok minus cafe area and hardlids
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/24/2025 | 6/24/2025 | 06/24/2025 |
Monty Johnson ((253) 770-3326) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• In existing buildings all required service and maintenance to be completed prior to inspection for the Fire Alarm, and Fire Sprinkler Systems.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
New Fire Alarm System Conditions | Open | Standard Conditions |
Fire Prevention
• Appointment required for all inspections am/pm is not guaranteed without appointment. Larger systems taking more than 1 hour will require 48-72hr notice prior to scheduling.
• Provide plans and permit on site for inspection.
• Complete labor and industries inspections prior to requesting city inspection.
• If there is an existing annunciator on the exterior of the building it will need to be moved inside the main entrance. Please contact fire inspector for further information.
• Exterior fire bell required outside fire sprinkler room.
• Above ceiling detection is required.
• Device maps required at the annunciator and fire alarm panel prior to calling in final. The annunciator map will need to be weatherproof.
• Total coverage is required, subject to field inspection. Comply with NFPA 72.
• Fire alarm system shall be placarded per NFPA 72. The UL certificate shall be posted at time of final inspection. The system will need to be UL certified.
• Pre-test shall be conducted with a printout for inspector at time of inspection.
• Labeling of all devices above and below ceiling required.
• Fire sprinkler tamper valves and PIV will be required to be tested at inspection. Fire sprinkler contractor to be onsite.
• RTU’S and smoke dampeners will be required to be tested during inspection. RTU’S of 2000cfm or higher are required to be monitored and will require shutdown.
• The city of Puyallup allows one FACP per building. The panel will need to be large enough to handle multiple tenants if applicable.
• In existing buildings all above ceiling detection is to remain. Do not remove.
• Due to unforeseeable construction design, all device locations to be field verified for compliance.
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. For larger system please make an appointment prior to scheduling first.
David Drake ddrake@puyallupwa.gov
|
||
Fire Sprinkler System (New) Conditions | Open | Standard Conditions |
Development & Permitting Services
• Provide plans and permit on site for inspection.
• Cover and final inspections are required.
• Fire watch is required when sprinkler system is out of service in existing buildings.
• Contractor required at all inspections.
• Hydro test will be required on all new and existing buildings. Appointment required.
• Hydro test, two inspections will be required 2hrs apart. Call to schedule times. Am/pm is not guaranteed without appointment.
• Fire pumps will be required to be tested and witnessed by inspector.
• Tool kit required at time of final.
• NFPA placards required.
• In existing buildings all upright fire sprinklers to remain, do not remove.
• In existing buildings all required service and maintenance to be completed prior to inspection.
• Due to unforeseeable construction design, all head locations to be field verified for compliance.
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. For larger system please make an appointment prior to scheduling first.
David Drake ddrake@puyallupwa.gov
|
||
Certificate of Water Availability - Fruitland Mutual Water Company | Resolved | Prior to Issuance |
Engineering Division
A certificate of water availability is required from Fruitland Mutual Water Company, the site’s water purveyor. You can initiate the certificate request by completing the application found here: http://www.fruitlandwater.com/Water_availability_letter_only.pdf and submitting it to Fruitland Mutual. (PMC 14.22.020)
Certificate dated January 13, 2025 has been received. [Yianni Charitou @ 02/06/2025 10:09 AM]
|
||
Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
*5.9.25 CONTRACTOR PROVIDED EMAIL RECEIPT OF BUS LICENSE [Jeannesha Frazier @ 05/09/2025 11:58 AM]
|
||
Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
5.9.25: CENSOR COMMERCIAL CONSTUCTION WB CONTRACTOR [Jeannesha Frazier @ 05/09/2025 11:04 AM]
|
Reference Number | Status | Type |
---|---|---|
PRCTI20241136 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRSG20250665 | Ready for Issuance | Sign/Awning |
PRFA20250712 | In Plan Check | Fire Alarms |
Date Uploaded | File Type | Name |
---|---|---|
01/06/2025 | Receipt | Receipt for transaction:2025-000021 |
02/21/2025 | Receipt | Receipt for transaction:2025-000375 |
03/05/2025 | Plans | SEISMIC DRWG (Stamped) |
03/05/2025 | Plans | SHELVING DRWG (Stamped) |
03/05/2025 | Plans | STRUCTURAL SET (Stamped) |
03/05/2025 | Plans | MEP SET (Stamped) |
03/05/2025 | Plans | ARCHITECT SET (Stamped) |
03/06/2025 | Form | LIGHTING COMPLIANCE (Stamped) |
03/06/2025 | Report | FIXTURE ANCHORAGE CALCS (Stamped) |
03/06/2025 | Report | INTERIOR FRAMING CALCS (Stamped) |
03/06/2025 | Report | SHELVING CALCS (Stamped) |
03/06/2025 | Form | PLUMBING FIXTURE WRKSHEET (Stamped) |
03/06/2025 | Form | 0011 WA (Stamped) |
05/09/2025 | Receipt | Receipt for transaction:2025-000913 |
05/09/2025 | Permit | Permit - Detailed |
05/09/2025 | Letter | Permit Job Card |
05/23/2025 | Receipt | Receipt for transaction:2025-000991 |
05/29/2025 | Form | REVISION SUMMARY - REV (1) (Stamped) |
05/29/2025 | Plans | CONSTRUCTION PLAN SET - REVISION 1 (Stamped) |