Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Paid Fees
Amount
Paid
Owing
Date Paid
Building Plan Review Fee
$3,028.19
$3,028.19
Paid
10/10/2025
Resubmittal/Revision Fee
$180.00
$180.00
Paid
12/11/2025
Resubmittal/Revision Fee
$180.00
$180.00
Paid
01/20/2026
Outstanding Fees
Amount
Paid
Owing
Date Paid
Fire Review Fee (Commercial Building)
$265.00
$0.00
$265.00
Not Paid
Building Permit Fee
$4,658.75
$0.00
$4,658.75
Not Paid
WA State Building Code Council Fee (Commercial)
$25.00
$0.00
$25.00
Not Paid
Traffic Impact Fee (Commercial)
$17,640.00
$0.00
$17,640.00
Not Paid
Totals:
$25,976.94
$3,388.19
$22,588.75
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
There are no inspections for this permit application, or you are not authorized to view them.
Condition
Status
Category
Building Permit Standard Conditions
Open
Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions
Open
Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Ready to Issue - Need Business License Endorsement
Resolved
Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Certificate of Water Availability - Fruitland Mutual Water Company
Resolved
Prior to Issuance
Engineering Division
A certificate of water availability is required from Fruitland Mutual Water Company, the site’s water purveyor since the proposed work crosses the existing water line and easement (Recording Info # 9610150317 per provided survey). Fruitland Mutual must indicate that the proposed work does not conflict with the easement terms or irrigation standards. You can initiate the certificate request by completing the application found here: http://www.fruitlandwater.com/Water_availability_letter_only.pdf and submitting it to Fruitland Mutual. (PMC 14.22.020)
Engineering Commercial Standard Conditions
Open
Standard Conditions
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCP20251408 has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20251408 for approved method of control.
- Steps shall be taken to prevent drainage onto adjacent lots.
- A backflow protection device may be required as directed by Fruitland Mutual Water Company.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Stormwater Maintenance Agreement (SWA)
Resolved
Prior to Completion
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
The need for an updated SWA currently under consideration with the civil permit review engineer. They return from vacation on 1/22. [Yianni Charitou @ 01/14/2026 2:04 PM]
Updated SWA not required as verified by civil permit review engineer. [Yianni Charitou @ 01/22/2026 8:53 AM]
Miscellaneous Condition
Open
Prior to Issuance
Engineering Division
The PRCTI20251350 building permit plans may be reviewed sequentially with the PRCCP20251408 civil construction plans. Since the civil plans are the foundation of the building plans, the civil plans must be approved before the building plans. Therefore, building permit PRCTI20251350 cannot be issued until civil construction permit PRCCP20251408 is issued first. The building permit site plan design must be a continuation of the approved civil plans, free of design discontinuity or discrepancies. It is the applicant's responsibility to coordinate building permit application resubmissions to avoid redundant reviews and fees in coordination with the civil permit application status since both permit applications are currently under review.
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a right-of-way or civil construction permit issued. A right-of-way permit is required if there is existing vertical curb in good condition and a civil construction permit is required if there is no existing vertical curbing. For convenience, the frontage improvements may be included in the civil permit PRCCP20251408 scope to consolidate permits needed for this project.
The subject site may qualify for the fee-in-lieu program in which the applicant may request and submit justification to pay a fee rather than constructing all or part of the required frontage improvements. Allowance of fee-in-lieu shall be at the discretion of the City and may be denied if the City Engineer determines it will be more beneficial to the public to have frontage improvements built along the street frontage adjoining the property or access to the property. The justification to allow use of the fee-in-lieu program shall not be based on cost savings to the applicant in comparison with constructing required improvement adjacent to the property.
Development Engineering Manager Ken Cook determined that the project does not trigger frontage improvements. [Yianni Charitou @ 01/15/2026 3:47 PM]
Building occupancy cannot be granted or final inspection cannot be passed until the frontage improvements are completed and approved.
Development Engineering Manager Ken Cook determined that the project does not trigger frontage improvements. [Yianni Charitou @ 01/15/2026 3:47 PM]