CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20251520


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20251520
Commercial - Tenant Improvement/Remodel
Closed
AMB INSTITUTIONAL ALLIANCE FUND III LP
Alteration/Remodel
Installation of Qty (3) open faced booths, Qty (1) Industrial Paint Mixing room, Qty (1) Industrial drying enclosure, Qty (5) Exhaust Ducts and Qty (1) Make-up air unit and intake ducting. - TRIMLITE @ PROLOGIS STE. 101 & 102
11/20/2025
12/30/2025
08/11/2026
02/12/2026

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 01/05/2026 12/29/2025
Planning Review Approved 12/22/2025 12/19/2025
Engineering Review Approved 12/22/2025 12/15/2025
Fire Review Approved 12/22/2025 12/08/2025
Building Review Failed 12/22/2025 12/08/2025
Engineering Traffic Review Approved 12/22/2025 12/02/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 12/30/2025
Air Handling Unit (Over 10,000 cfm) Fee $23.92 $23.92 Paid 12/30/2025
Exhaust Hood, With Make Up Air - Commercial Fee $35.95 $35.95 Paid 12/30/2025
Mechanical Duct Work Fee $14.10 $14.10 Paid 12/30/2025
Building Permit Fee $2,113.75 $2,113.75 Paid 12/30/2025
Mechanical Permit Fee $40.00 $40.00 Paid 12/30/2025
Building Plan Review Fee $1,373.94 $1,373.94 Paid 12/01/2025
Mechanical Plan Review Fee $74.08 $74.08 Paid 11/20/2025
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 12/30/2025
Resubmittal/Revision Fee $180.00 $180.00 Paid 12/27/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Mechanical Rough In Inspection Partial Pass 2/3/2026 2/3/2026 02/03/2026
James LaVergne ((253) 841-5590)
Mechanical Final Inspection Not Ready 2/3/2026 2/3/2026 02/03/2026
James LaVergne ((253) 841-5590)
Fire Final Inspection Passed 2/10/2026 2/10/2026 02/10/2026
David Drake ((253) 864-4171)
Building Final Inspection Not Ready 2/10/2026 2/10/2026 02/10/2026
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/10/2026
1. Contractor not on site. 8:58am 2. Provide fire final before building final. 3. Provide balance reports make up air reports.

Exit Lighting Test Inspection VOID 02/11/2026
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection VOID 02/11/2026
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 02/11/2026
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 02/11/2026
David Drake ((253) 864-4171)
Mechanical Final Inspection Passed 2/11/2026 2/11/2026 02/11/2026
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Comment Engineering Div Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Gas Test Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Medical Gas Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Engineering Final Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Planning Final Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection VOID 02/12/2026
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 2/12/2026 2/12/2026 02/12/2026
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
02/10/2026
1. Contractor not on site. 8:58am 2. Provide fire final before building final. 3. Provide balance reports make up air reports.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of Puyallup • L&I Final required prior to Fire Final • Separate permits required for fire alarm and fire sprinkler system. Shutdowns required. • RTU’S will be required to be tested for shut down. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Business License Endorsement Resolved Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20250557 Closed Commercial - Tenant Improvement/Remodel
PRCTI20251104 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20251201 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFS20251310 Closed Fire Sprinklers
PRFA20251359 Closed Fire Alarms
PRMH20251492 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRCTI20251654 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFA20260016 Closed Fire Alarms
PRSG20260102 Permit(s) Issued Sign/Awning
PRCTI20260465 In Plan Check Commercial - Tenant Improvement/Remodel
PLPRE20250091 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
11/20/2025 Receipt Receipt for transaction:2025-002228
12/01/2025 Receipt Receipt for transaction:2025-002263
12/27/2025 Receipt Receipt for transaction:2025-002437
12/29/2025 Report STRUCTURAL CALCS (Stamped)
12/29/2025 Report GFS BOOTH CALCS (Stamped)
12/29/2025 Plans SYSTEMS LAYOUT (Stamped)
12/29/2025 Plans FLOOR PLAN (Stamped)
12/29/2025 Other PUGET SOUND CLEAN AIR (Stamped)
12/29/2025 Plans PLAN SET (Stamped)
12/29/2025 Plans DRY FILTER BOOTH 2 (Stamped)
12/29/2025 Plans DRY FILTER BOOTH (Stamped)
12/29/2025 Plans OPEN FACE BOOTH (Stamped)
12/29/2025 Plans INDUSTRIAL MIX ROOM (Stamped)
12/29/2025 Plans AIR MAKE-UP UNIT (Stamped)
12/29/2025 Plans LOW TEMP OVEN (Stamped)
12/29/2025 Plans STAMPED DRAWINGS - (Stamped)
12/29/2025 Plans PERMIT SET (Stamped)
12/30/2025 Receipt Receipt for transaction:2025-002451
12/30/2025 Permit Permit - Detailed
02/03/2026 Report Inspection Report (Mechanical Rough In Inspection)
02/03/2026 Report Inspection Report (Mechanical Final Inspection)
02/10/2026 Report Inspection Report (Building Final Inspection)
02/11/2026 Report Inspection Report (Mechanical Final Inspection)
02/12/2026 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.