PRDE20241467
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee (Demolition) | $492.25 | $492.25 | Paid | 09/16/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $492.25 | $492.25 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Utility Capping Inspection | Pending | |||
Engineering Final Inspection | Pending | |||
Demolition Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Erosion And Sediment Inspection | Pending | |||
Other/Miscellaneous
Outstanding
12/26/2024
- Fill in the swale at silt fence with native material.
- Backfill the silt fence with native material.
|
||||
Erosion And Sediment Inspection | Partial Pass | 11/18/2024 | 11/18/2024 | 11/18/2024 |
Jason Little ((253) 244-0387) | ||||
Erosion And Sediment Inspection | Failed | 12/19/2024 | 12/19/2024 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
12/19/2024
- Remove existing 4" drain from the ditch.
- Fill in the swale.
- Backfill the silt fence.
|
||||
Erosion And Sediment Inspection | Failed | 12/26/2024 | 12/26/2024 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
12/26/2024
- Fill in the swale at silt fence with native material.
- Backfill the silt fence with native material.
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Demolition Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard demolition conditions:
1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work.
2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law.
Site-specific Conditions:
- No City utilities shall be removed, retired, or modified. All existing utilities shall remain to serve existing or remaining structures.
I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
Williams Gas Pipeline Survey | Resolved | Engineering Division | Prior to Issuance | ||
:
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development and construction is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
|
Reference Number | Status | Type |
---|---|---|
PRCNC20241019 | Permit(s) Issued | Commercial - New Construction |
PRCCP20241109 | Returned for Correction | Civil Construction Permit |
PRFO20241675 | Canceled | Foundation Only |
PRCCP20241731 | In Plan Check | Civil Construction Permit |
PLPRE20220076 | File Closed | Pre-Application |
PLTU20240110 | Waiting for Conditions | Temporary Use |
Date Uploaded | File Type | Name |
---|---|---|
09/16/2024 | Receipt | Receipt for transaction:2024-001926 |
10/10/2024 | Form | PLUMBING FIXTURE WORKSHEET - NO PLUMBING (Stamped) |
10/10/2024 | Other | PSCAA (Stamped) |
10/10/2024 | Plans | SITE PLAN (Stamped) |
11/13/2024 | Permit | Permit - Detailed |
11/13/2024 | Letter | Permit Job Card |
11/18/2024 | Report | Inspection Report (Erosion And Sediment Inspection) |
12/19/2024 | Report | Inspection Report (Erosion And Sediment Inspection) |
12/26/2024 | Report | Inspection Report (Erosion And Sediment Inspection) |