CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20241019


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20241019
Commercial - New Construction
Permit(s) Issued
STEP BY STEP FAMILY SUPPORT CENTER
New
Construct Early Learning Center
06/22/2024
12/27/2024
11/04/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 01/10/2025 12/23/2024
Plumbing Review Approved 01/10/2025 12/23/2024
Engineering Civil Review Approved 01/10/2025 12/18/2024
Engineering Traffic Review Approved 01/10/2025 12/18/2024
Engineering Review Approved 01/10/2025 12/18/2024
Fire Review Approved 01/10/2025 12/16/2024
Planning Review Approved 01/10/2025 12/11/2024
Plumbing Review Approved 08/29/2024 10/23/2024
Plumbing Review Approved 10/29/2024 10/23/2024
Building Review Approved 10/29/2024 10/23/2024
Engineering Review Failed 10/29/2024 10/03/2024
Engineering Traffic Review Approved 10/29/2024 10/03/2024
Fire Review Approved 10/29/2024 10/02/2024
Planning Review Approved 10/29/2024 10/02/2024
Engineering Review Failed 08/29/2024 09/05/2024
Building Review Failed 08/29/2024 08/28/2024
Fire Review Approved 08/29/2024 08/21/2024
Engineering Traffic Review Approved 08/29/2024 07/03/2024
Planning Review Approved 08/29/2024 07/03/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 12/27/2024
Planning Landscape Review Fee $180.00 $180.00 Paid 12/27/2024
Air Handling Unit (Up to 10,000 cfm) Fee $239.70 $239.70 Paid 12/27/2024
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $71.90 $71.90 Paid 12/27/2024
Mechanical Duct Work Fee $24.00 $24.00 Paid 12/27/2024
Building Permit Fee $22,033.75 $22,033.75 Paid 12/27/2024
Planning Building Permit Fee $60.00 $60.00 Paid 12/27/2024
Mechanical Permit Fee $40.00 $40.00 Paid 12/27/2024
Backflow Preventor Fee $26.00 $26.00 Paid 06/24/2024
Plumbing Permit Fee $40.00 $40.00 Paid 12/27/2024
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 12/27/2024
Plumbing Fixtures Fee $650.00 $650.00 Paid 12/27/2024
Water Heater Fee $39.00 $39.00 Paid 12/27/2024
Building Plan Review Fee $3,645.69 $3,645.69 Paid 06/24/2024
Mechanical Plan Review Fee $244.14 $244.14 Paid 06/24/2024
Plumbing Plan Review Fee $516.91 $516.91 Paid 06/24/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 12/27/2024
Sewer Permit Fee for Stub Onsite Inspection $170.00 $170.00 Paid 12/27/2024
Sewer CCTV (Lateral) Fee $186.00 $186.00 Paid 12/27/2024
Sewer System Development Charge $49,079.14 $49,079.14 Paid 12/27/2024
Resubmittal Fee $180.00 $180.00 Paid 09/16/2024
Resubmittal Fee $180.00 $180.00 Paid 11/06/2024
Civil Review Additional Fee $360.00 $360.00 Paid 12/27/2024
Building Plan Review Fee $10,676.25 $10,676.25 Paid 12/27/2024
$14,321.94
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Gas Test Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Shower Pan Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Pending
Corrections:


Other/Miscellaneous
Outstanding
01/06/2025
- Please backfill interior silt fence, where swale and drain was, with native material. - Maintain silt fence. - Zero track out. - Maintain CB socks. - No silt runoff into ROW ditch.

Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
01/30/2025
1 ; ok to pour with special inspection approval report. ( except at areas blocked out for sewer relocation as discussed with contractor.)

Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Storm Inspection Pending
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Engineering Daily Inspection Pending
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Partial Pass 1/6/2025 1/6/2025 01/06/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/06/2025
- Please backfill interior silt fence, where swale and drain was, with native material. - Maintain silt fence. - Zero track out. - Maintain CB socks. - No silt runoff into ROW ditch.

Job Start Inspection Passed 1/14/2025 1/14/2025 01/14/2025
Jason Little ((253) 244-0387)
Comment Engineering Div Inspection Not Ready 1/21/2025 01/21/2025
Jason Little ((253) 244-0387)
Footing/Setback Inspection Not Ready 1/27/2025 1/27/2025 01/27/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/27/2025
1 ; provide special inspection report at time of footing inspection . 2 ; provide geo- tech report for soil bearing requirements of 1,500 psf as required per engineers of record on city approved plans. 3 ; complete engineering requirements for relocation of storm and sewer from underneath building prior to footing inspection. 4 ; ground frozen at time of footing inspection, call for inspection after ground is thawed. cancel per contractor - not ready

Foundation/Rebar Inspection Not Ready 1/28/2025 1/28/2025 01/28/2025
Shannon King ((253) 840-6684)
Engineering Daily Inspection Partial Pass 1/29/2025 01/29/2025
Jason Little ((253) 244-0387)
Footing/Setback Inspection Partial Pass 1/30/2025 1/30/2025 01/30/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
01/30/2025
1 ; provide special inspection report at time of footing inspection . 2 ; provide geo- tech report for soil bearing requirements of 1,500 psf as required per engineers of record on city approved plans. 3 ; complete engineering requirements for relocation of storm and sewer from underneath building prior to footing inspection. 4 ; ground frozen at time of footing inspection, call for inspection after ground is thawed. cancel per contractor - not ready

Other/Miscellaneous
Carried Forward
01/30/2025
1 ; ok to pour with special inspection approval report. ( except at areas blocked out for sewer relocation as discussed with contractor.)

Engineering Daily Inspection Partial Pass 2/6/2025 02/06/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/21/2025 02/21/2025
Jason Little ((253) 244-0387)
Foundation/Rebar Inspection Partial Pass 2/21/2025 2/21/2025 02/21/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/21/2025
progressing with special inspector

Engineering Daily Inspection Partial Pass 2/27/2025 02/27/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/3/2025 03/03/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/4/2025 03/04/2025
Jason Little ((253) 244-0387)
Plumbing Below Slab Inspection Partial Pass 3/6/2025 3/6/2025 03/06/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
03/06/2025
1:below slab dwv from 1 to 7 line -a- to -j- approved.

Engineering Daily Inspection Partial Pass 3/6/2025 03/06/2025
Jason Little ((253) 244-0387)
Storm Inspection Partial Pass 3/10/2025 3/10/2025 03/10/2025
Jason Little ((253) 244-0387)
Slab/Insulation Inspection Partial Pass 3/11/2025 3/11/2025 03/11/2025
Darrin Graham ((360) 589-9298)
Plumbing Below Slab Inspection Partial Pass 3/13/2025 3/13/2025 03/13/2025
Ted Christie ((253) 507-0191)
Slab/Insulation Inspection Not Ready 3/18/2025 3/18/2025 03/18/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/18/2025
1 ; complete vapor barrier at slab at grid line - (1-7,A-J) 2 ; complete rebar ar interior footings. not ready

Slab/Insulation Inspection Passed w/ Conditions 3/20/2025 3/20/2025 03/20/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
03/20/2025
1 ; complete vapor barrier at slab at grid line - (1-7,A-J) 2 ; complete rebar ar interior footings. not ready

Other/Miscellaneous
Carried Forward
03/20/2025
1:slab ok to pour with engineer of records ok on interior footings with clumps of conduit running horizontal and with special inspection approval, 1 to 7 -a- to -j- line

Engineering Daily Inspection Partial Pass 3/24/2025 03/24/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/24/2025 03/24/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/25/2025 03/25/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/26/2025 03/26/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/27/2025 03/27/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/28/2025 03/28/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/31/2025 03/31/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 4/1/2025 04/01/2025
Michael Rosenau ((253) 344-6753)
Slab/Insulation Inspection Passed 4/2/2025 4/2/2025 04/02/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
03/20/2025
1 ; complete vapor barrier at slab at grid line - (1-7,A-J) 2 ; complete rebar ar interior footings. not ready

Engineering Daily Inspection Partial Pass 4/3/2025 04/04/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/18/2025 04/18/2025
Jason Little ((253) 244-0387)
Frame Inspection Passed 4/25/2025 4/25/2025 04/25/2025
Ted Christie ((253) 507-0191)
Shear Wall Inspection Partial Pass 5/8/2025 5/8/2025 05/08/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/08/2025
1:pre-school, I line between 2 and 7 #1 walls only ok. 2:provide special inspection for #2 and #3 walls with nailing 4" or less.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Development & Permitting Services
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • A Knox box is required at the Riser Room • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20241109 for approved method of control. - Stormwater control of roof downspouts required. See approved civil permit PRCCP20241109 for approved method of control. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to Valley Water District's requirements. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling. - Curb, gutter, sidewalk, and approach must be poured to City standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right-of-way or civil permit. - A separate right-of-way or civil permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings Resolved Prior to Issuance
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project, however, is exempt from frontage improvements as indicated on P-17-0106 and the Step-By-Step Development Agreement. See attached email from Ken Cook with subject line FW: Frontage improvements. [Yianni Charitou @ 07/03/2024 3:30 PM]
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Building permit PRCNC20241019 cannot be issued until civil construction permit PRCCP20241109 is issued first. [Yianni Charitou @ 08/30/2024 9:46 AM]
Miscellaneous Condition Open Prior to Occupancy
Engineering Division
Occupancy shall not be granted until all civil work associated with PRCCP20241109 has been completed and approval has been provided. [Yianni Charitou @ 08/30/2024 9:47 AM]
Stormwater - Greater than 5,000 SF New/Replaced Hard Surface Open Standard Conditions
Engineering Division
The City adopted the Department of Ecology’s 2019 Stormwater Management Manual for Western Washington which requires mitigation and site-specific stormwater testing for projects that add or replace 2,000 square feet or more of hard surfaces. Your proposed project exceeds the 5,000 square foot threshold of the manual. Therefore, your project requires a small-scale Pilot Infiltration Test (PIT) to determine site specific infiltration testing. In addition to infiltration testing, the seasonally high groundwater must be measured weekly for the duration of the wet season (December 21st – March 21st). A Development Engineer will also be assigned to complete the stormwater review of your project. Alternatively, you may revise your scope and plans to propose less new plus replaced hard surface area such that additional testing and mitigation are not required.
Stormwater Maintenance Agreement (SWA) Open Prior to Occupancy
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Certificate of Water Availability - Valley Water District Resolved Prior to Issuance
Engineering Division
A certificate of water availability is required from Valley Water District, the site’s water purveyor. You can initiate the certificate request by completing the application found here: https://www.valleywaterdistrict.com/forms.php and submitting it to Valley Water District. (PMC 14.22.020)
Right-of-Way (ROW) Dedication Open Prior to Occupancy
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. In accordance with Puyallup Municipal Code Chapter 11.08.120, the subject site property owner shall dedicate approximately 16.5’ of right-of-way to match the 73’ street classification of 33RD ST SE. Please fill out the attached REETA template form and the Right of Way Dedication Deed form. The Deed form must include a legal description and be accompanied by an exhibit (survey completed by licensed surveyor) depicting the right-of-way dedication. Once drafted, please return these documents to me to review with the Engineering Support Specialist and City Engineer. If accepted, the City Engineer will sign the Deed so that it can be recorded with Pierce County.
External Gravity Grease Interceptor Resolved Prior to Issuance
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project. Based on the described use of the kitchen in the permit application, neither an external grease interceptor or internal grease trap are required. See attached email with subject line RE: PRCNC20241019 Pretreatment Review. [Yianni Charitou @ 10/03/2024 1:49 PM]
Latecomer Agreement Open Prior to Occupancy
Engineering Division
Per Puyallup Municipal Code Chapter 11.24, the property is subject to sewer and storm latecomer agreements. The property owner of parcel numbers 0420253070 and 0420253071 will be required to submit any outstanding latecomer and maintenance fees for each agreement and each parcel as summarized below: - The sewer latecomer assessment fee for tax parcel 0420253070 is $32,911.37 and the 4% maintenance fee is $1,316.45 per AFN 202406210039 (which supersedes 202204130516 & 202108050859). Paid under building permit PRSC20220184. - The sewer latecomer assessment fee for tax parcel 0420253071 is $21,765.39 and the 4% maintenance fee is $870.62 per AFN 202406210039 (which supersedes 202204130516 & 202108050859). Paid under building permit PRSC20220184 - The stormwater latecomer assessment and maintenance fees for tax parcels 0420253070 and 0420253071 shall be calculated under civil construction permit PRCCP20241109 since the assessment must be calculated based on square footage of new, altered, or replaced hard surfaces, including altered or replaced retention or detention facilities per AFN 202306290155. The PRCCP20241109 calculation shall then be assessed on building permit PRCNC20241019 and paid prior to issuance. [Yianni Charitou @ 09/04/2024 12:42 PM]
Williams Gas Pipeline Survey Resolved Prior to Issuance
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
NEED TO VERIFY VALUATION AND RECALCULATE FEES - WAITING FOR CONSTRUCTION ESTIMATE - SONGYI WILL EMAIL TO THE PERMIT CENTER
Miscellaneous Condition Open Standard Conditions
Building Division
Please see both the project conditions established on this permit (see the permit for this project OPEN conditions) and the Civil construction permit issued separately. Some of these conditions apply to final inspections and occupancy approval. At the request of the architect of record and owner, the issuance of the Civil utility permits has been deferred. . NO WORK may continue beyond rough in inspections; no framing inspection or cover inspections. The contractor may not request inspections for cover or framing until the Civil permit has been issued.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20241109 Returned for Correction Civil Construction Permit
PRDE20241467 Closed Demolition
PRFO20241675 Canceled Foundation Only
PRCCP20241731 Returned for Correction Civil Construction Permit
PRFA20250370 Permit(s) Issued Fire Alarms
PRFS20250468 Ready for Issuance Fire Sprinklers
PLPRE20220076 File Closed Pre-Application
PLTU20240110 Waiting for Conditions Temporary Use

Documents & Images

Date Uploaded File Type Name
06/24/2024 Receipt Receipt for transaction: 2024-001330
09/16/2024 Receipt Receipt for transaction:2024-001924
11/06/2024 Receipt Receipt for transaction:2024-002324
12/24/2024 Plans SITE PLAN - RESUB (Stamped)
12/24/2024 Plans STORM REROUTE (Stamped)
12/24/2024 Plans CONSTRUCTION PLAN SET - RESUB (Stamped)
12/24/2024 Other MECHANICAL CALCULATIONS (Stamped)
12/24/2024 Form ENERGY CODE REQUIREMENT LIST (Stamped)
12/24/2024 Form ENERGY CODE ENVELOPE COMPLIANCE SUMMARY - RESUB (Stamped)
12/24/2024 Report STRUCTURAL CALCS (Stamped)
12/24/2024 Form Plumbing Fixture Worksheet REVISED (Stamped)
12/24/2024 Report GEOTECH REPORT (Stamped)
12/24/2024 Other GROUNDWATER EVAL AND INFILTRATION TEST REPORT (Stamped)
12/24/2024 Form SBS ELC Rev02-Doc_Water Availabilty Letter - FROM VALLEY WATER (Stamped)
12/27/2024 Receipt Receipt for transaction: 2024-002670
12/27/2024 Permit Permit - Detailed
12/27/2024 Letter Permit Job Card
01/06/2025 Report Inspection Report (Erosion And Sediment Inspection)
01/14/2025 Report Inspection Report (Job Start Inspection)
01/21/2025 Report Inspection Report (Comment Engineering Div Inspection)
01/27/2025 Report Inspection Report (Footing/Setback Inspection)
01/28/2025 Report Inspection Report (Foundation/Rebar Inspection)
01/30/2025 Report Inspection Report (Footing/Setback Inspection)
03/13/2025 Report Inspection Report (Plumbing Below Slab Inspection)
03/18/2025 Report Inspection Report (Slab/Insulation Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.