CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
PRCCP20241109
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Engineering Inspection Fee (3%) | $3,764.60 | $3,764.60 | Paid | 06/17/2025 |
| Engineering Permit Fee | $300.00 | $300.00 | Paid | 06/17/2025 |
| Civil Review Fee | $470.00 | $470.00 | Paid | 07/11/2024 |
| Record Drawing Review Fee | $200.00 | $200.00 | Paid | 07/11/2024 |
| Civil Review Additional Fee | $3,240.00 | $3,240.00 | Paid | 11/06/2024 |
| Civil Review Additional Fee | $1,800.00 | $1,800.00 | Paid | 06/17/2025 |
| Civil Review Additional Fee | $540.00 | $540.00 | Paid | 06/17/2025 |
| Latecomer Storm Contribution Fee | $214,208.47 | $214,208.47 | Paid | 06/17/2025 |
| Latecomer 4% Administration Fee | $8,568.34 | $8,568.34 | Paid | 06/17/2025 |
| Traffic Control Permit Fee | $50.00 | $50.00 | Paid | 06/17/2025 |
| Traffic Control Plan Review Fee | $40.00 | $40.00 | Paid | 06/17/2025 |
| Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 06/17/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| Storm System Development Charge - Commercial | $0.00 | $0.00 | Not payable | Not Paid |
| Totals: | $233,481.41 | $233,481.41 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Engineering Final Inspection | Pending | |||
| Jason Little ((253) 244-0387) | ||||
| Planning Landscape Inspection | Pending | |||
| Erosion And Sediment Inspection | Pending | |||
| Jason Little ((253) 244-0387) | ||||
| Engineering Punchlist Inspection | Pending | |||
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Pending | 2/2/2026 | ||
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
01/30/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through. (COMPLETE)
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking! (COMPLETE)
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence. (COMPLETE)
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me. (COMPLETE)
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC. (COMPLETE)
12. Install break away lock on PIV.
13. Need fire inspection card completed. (COMPLETE)
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape. (COMPLETE)
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color. (COMPLETE)
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Job Start Inspection | Partial Pass | 8/4/2025 | 08/04/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 8/5/2025 | 08/05/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 8/6/2025 | 08/06/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 8/25/2025 | 08/25/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 8/26/2025 | 08/26/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 8/27/2025 | 08/28/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/2/2025 | 09/02/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/3/2025 | 09/04/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/5/2025 | 09/05/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/8/2025 | 09/08/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/9/2025 | 09/09/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/10/2025 | 09/11/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/15/2025 | 09/16/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/17/2025 | 09/18/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/22/2025 | 09/22/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/24/2025 | 09/24/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 9/30/2025 | 09/30/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 10/2/2025 | 10/02/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 10/10/2025 | 10/10/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 10/31/2025 | 10/31/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Erosion And Sediment Inspection | Failed | 11/14/2025 | 11/14/2025 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
11/14/2025
1. Plug storm system from exiting site until the CESCL has monitored low to zero turbidity. Once this is achieved the storm may exit the site.
2. Protect ALL CB's and yard drains from turbid water entering the system. Silt socks are a last resort. Please see TESC plans for possible BMP's. Make adjustments with your on site SWPPP.
3. Grout all risers and holes to keep turbid water out of the system.
4. Protect ALL exposed soil. See on site SWPPP and self monitoring CESCL suggestions.
5. Install silt fence correctly, repair any holes, and install silt fence where needed.
6. Stabilize exposed soil along existing ditch edge along 33rd.
|
||||
| Erosion And Sediment Inspection | Partial Pass | 11/17/2025 | 11/17/2025 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
11/17/2025
1. Plug storm system from exiting site until the CESCL has monitored low to zero turbidity. Once this is achieved the storm may exit the site.
2. Protect ALL CB's and yard drains from turbid water entering the system. Silt socks are a last resort. Please see TESC plans for possible BMP's. Make adjustments with your on site SWPPP.
3. Grout all risers and holes to keep turbid water out of the system.
4. Protect ALL exposed soil. See on site SWPPP and self monitoring CESCL suggestions.
5. Install silt fence correctly, repair any holes, and install silt fence where needed.
6. Stabilize exposed soil along existing ditch edge along 33rd.
|
||||
| Engineering Daily Inspection | Partial Pass | 11/21/2025 | 11/21/2025 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 12/16/2025 | 12/16/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Engineering Daily Inspection | Partial Pass | 12/19/2025 | 12/19/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Engineering Daily Inspection | Partial Pass | 12/24/2025 | 12/24/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Engineering Daily Inspection | Partial Pass | 1/5/2026 | 01/05/2026 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 1/6/2026 | 01/06/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/06/2026
1. Repair ditch E&W of 33rd where sewer went through.
2. Install sewer marking board per COP detail 04.03.02.
3. Remove all silt fence.
4. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only.
5. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
6. Clean asphalt.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. Install all CB lid bolts.
9. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
10. Once all landscape has been completed and parking has been cleaned, bring storm pumps on line.
11. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
12. Paint and or protect bollards near hydrant and FDC.
13. Install break away lock on PIV.
14. Paint PIV to match FDC color.
15. Finish landscape.
16. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/7/2026 | 01/07/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/07/2026
1. Repair ditch E&W of 33rd where sewer went through.
2. Install sewer marking board per COP detail 04.03.02.
3. Remove all silt fence.
4. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only.
5. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
6. Clean asphalt.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. Install all CB lid bolts.
9. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
10. Once all landscape has been completed and parking has been cleaned, bring storm pumps on line.
11. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
12. Paint and or protect bollards near hydrant and FDC.
13. Install break away lock on PIV.
14. Paint PIV to match FDC color.
15. Finish landscape.
16. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/7/2026 | 01/07/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/07/2026
1. Repair ditch E&W of 33rd where sewer went through.
2. Install sewer marking board per COP detail 04.03.02.
3. Remove all silt fence.
4. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only.
5. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
6. Clean asphalt.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. Install all CB lid bolts.
9. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
10. Once all landscape has been completed and parking has been cleaned, bring storm pumps on line.
11. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
12. Paint and or protect bollards near hydrant and FDC.
13. Install break away lock on PIV.
14. Paint PIV to match FDC color.
15. Finish landscape.
16. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/7/2026 | 01/07/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/07/2026
1. Repair ditch E&W of 33rd where sewer went through.
2. Install sewer marking board per COP detail 04.03.02.
3. Remove all silt fence.
4. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only.
5. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. Install all CB lid bolts.
9. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
10. Once all landscape has been completed and parking has been cleaned, bring storm pumps on line.
11. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
12. Paint and or protect bollards near hydrant and FDC.
13. Install break away lock on PIV.
14. Paint PIV to match FDC color.
15. Finish landscape.
16. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/12/2026 | 01/12/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/12/2026
1. Repair ditch E&W of 33rd where sewer went through.
2. Install sewer marking board per COP detail 04.03.02.
3. Remove all silt fence.
4. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only.
5. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
6. Clean asphalt.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. Install all CB lid bolts.
9. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
10. Once all landscape has been completed and parking has been cleaned, bring storm pumps on line.
11. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
12. Paint and or protect bollards near hydrant and FDC.
13. Install break away lock on PIV.
14. Paint PIV to match FDC color.
15. Finish landscape.
16. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/13/2026 | 01/13/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/13/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through.
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking!
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence.
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC.
12. Install break away lock on PIV.
13. Need fire inspection card completed.
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color.
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/16/2026 | 01/16/2026 | |
| Michael Rosenau ((253) 344-6753) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through.
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking!
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence.
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC.
12. Install break away lock on PIV.
13. Need fire inspection card completed.
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color.
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Engineering Preconstruction Inspection (Pre-Con Meeting) | VOID | 01/20/2026 | ||
| Jason Little ((253) 244-0387) | ||||
| Engineering Punchlist Inspection | Partial Pass | 1/20/2026 | 01/20/2026 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 1/22/2026 | 01/22/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/22/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through.
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking!
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence.
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC.
12. Install break away lock on PIV.
13. Need fire inspection card completed.
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color.
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Job Start Inspection | VOID | 01/22/2026 | ||
| Jason Little ((253) 244-0387) | ||||
| Engineering Punchlist Inspection | Partial Pass | 1/22/2026 | 01/22/2026 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 1/26/2026 | 01/26/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/26/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through.
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking!
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence.
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC.
12. Install break away lock on PIV.
13. Need fire inspection card completed.
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color.
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Engineering Daily Inspection | Partial Pass | 1/27/2026 | 01/27/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/27/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through. (COMPLETE)
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking! (COMPLETE)
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence. (COMPLETE)
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me. (COMPLETE)
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC. (COMPLETE)
12. Install break away lock on PIV.
13. Need fire inspection card completed. (COMPLETE)
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape. (COMPLETE)
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color. (COMPLETE)
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Engineering Punchlist Inspection | Partial Pass | 1/28/2026 | 01/28/2026 | |
| Jason Little ((253) 244-0387) | ||||
| Engineering Daily Inspection | Partial Pass | 1/30/2026 | 01/30/2026 | |
| Jason Little ((253) 244-0387) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/30/2026
Section “A” items to be completed prior to occupancy
1. Finish landscape.
2. Repair ditch E&W of 33rd where sewer went through. (COMPLETE)
3. North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking! (COMPLETE)
4. Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
5. Remove all silt fence. (COMPLETE)
6. Clean asphalt prior to brining storm online.
7. After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
8. After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me. (COMPLETE)
9. Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
10. Install all CB lid bolts.
11. Paint and or protect bollards near hydrant and FDC. (COMPLETE)
12. Install break away lock on PIV.
13. Need fire inspection card completed. (COMPLETE)
Section “B” items require an assignment of funds to be completed within 90 days of issuing occupancy.
1. Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape. (COMPLETE)
2. Install sewer marking board per COP detail 04.03.02.
3. See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
4. Paint PIV to match FDC color. (COMPLETE)
5. Need as-builts.
6. Need design engineer letter.
7. Watch sewer structure for leaks.
|
||||
| Engineering Punchlist Inspection | Partial Pass | 1/30/2026 | 01/30/2026 | |
| Jason Little ((253) 244-0387) | ||||
| Condition | Status | Category |
|---|---|---|
| Civil Standard Conditions | Open | Standard Conditions |
|
Engineering Division
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
||
| Pre-Construction Meeting | Resolved | Prior to Issuance |
|
Engineering Division
Please contact the DPS Support Specialist, Robin Loewen at RLOEWEN@PUYALLUPWA.GOV to request a pre-construction meeting prior to starting site work.
|
||
| Performance Bond | Resolved | Prior to Issuance |
|
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
|
||
| Inadvertent Discovery Plan (IDP) | Resolved | Prior to Issuance |
|
Engineering Division
Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
|
||
| Overtime Inspection and Watermain Shutdown Fee | Resolved | Prior to Issuance |
|
Engineering Division
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
|
||
| Certificate of Insurance/CG2012 | Resolved | Prior to Issuance |
|
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
|
||
| Clear, Fill, and Grade Bond | Resolved | Prior to Issuance |
|
Engineering Division
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
|
||
| Miscellaneous Condition | Resolved | Prior to Completion |
|
Engineering Division
At the time of Punchlist/Closeout, provide the City with a DRAFT copy of an updated Operations and Maintenance agreement for review and acceptance. Once approved, the updated O&M can be attached to the existing "Stormwater Management & BMP Facilities Agreement" previously recorded for the site, but the entire agreement (agreement, original O&M, and updated O&M) must be re-recorded. Use the BMP descriptions and maintenance criteria from the “City of Puyallup Site Management Plan for Stormwater Operations and Maintenance.”
|
||
| Latecomer Agreement | Resolved | Prior to Issuance |
|
Engineering Division
Prior to permit issuance, a Stormwater Latecomer fee in the amount of $(TBD prior to permit issuance) shall be paid.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Prior to permit issuance, the engineer-of-record shall acknowledge in writing that stormwater discharge(s) from the proposed project will not change the function of the outfall or create any increased impact to the existing outfall.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Provide acknowledgment from Williams/Northwest Pipeline, LLC that the project is acceptable as proposed.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Provide authorization from Pierce County to discharge stormwater runoff to the Puyallup River outfall in accordance with the County issued Shoreline Substantial Development Permit, Condition 7.
|
||
| Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
|
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Pending water-civil APPROVAL from Valley Water District.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Development & Permitting Services
A Stormwater Performance Bond must be received by the City of Puyallup prior to permit issuance. The Stormwater Performance Bond shall be 125% of the estimated cost of stormwater facility construction or improvement per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/18269/STORMWATER-Performance-Bond- for more information. [Robin Loewen @ 06/12/2025 4:46 PM]
|
||
| Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
|
Development & Permitting Services
Finish landscape.
|
||
| Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
|
Development & Permitting Services
Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
|
||
| Punchlist: Miscellaneous Sewer B Item | Open | Sewer Punchlist Section B |
|
Development & Permitting Services
Watch sewer structure for leaks. Sewer MH is still leaking as of 1/30/25.
|
||
| Punchlist: Miscellaneous Sewer B Item | Resolved | Sewer Punchlist Section B |
|
Development & Permitting Services
Install sewer Carson box over sewer or install concrete collar around sewer c/o casting in landscape.
|
||
| Punchlist: Miscellaneous Sewer B Item | Resolved | Sewer Punchlist Section B |
|
Development & Permitting Services
Install sewer marking board per COP detail 04.03.02. Painted yellow, IE depth and SEWER stenciled in black.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Repair ditch E&W of 33rd where sewer went through.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Remove all silt fence.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Clean asphalt prior to brining storm online.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
After parking lot has been cleaned bring storm filter on line with manufacturer inspection report emailed to me.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Install all CB lid bolts.
|
||
| Punchlist: Miscellaneous Streets A Item | Resolved | Street Punchlist Section A |
|
Development & Permitting Services
North side of driveway off 33rd needs gravel removed. Install grass seed and a heavy layer of straw. 1' gravel should is to remain only. This area is not for parking!
|
||
| Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
|
Development & Permitting Services
Paint and or protect bollards near hydrant and FDC.
|
||
| Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
|
Development & Permitting Services
Install break away lock on PIV.
|
||
| Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
|
Development & Permitting Services
Need fire inspection card completed.
|
||
| Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s | Resolved | Storm Punchlist Section A |
|
Development & Permitting Services
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan. See City Standards Section 2.3(2) for language specific to stormwater design and installation.
|
||
| Punchlist: Provide the City with a signed stormwater agreement | Open | Storm Punchlist Section B |
|
Development & Permitting Services
At the time of Punchlist/Closeout, provide the City with a DRAFT copy of an updated Operations and Maintenance agreement for review and acceptance. Once approved, the updated O&M can be attached to the existing "Stormwater Management & BMP Facilities Agreement" previously recorded for the site, but the entire agreement (agreement, original O&M, and updated O&M) must be re-recorded. Use the BMP descriptions and maintenance criteria from the “City of Puyallup Site Management Plan for Stormwater Operations and Maintenance.”
|
||
| Punchlist: Provide the City with an electronic version of the record drawings | Open | Misc. Punchlist Section B |
|
Development & Permitting Services
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format. See City Standards Section 2.3 for language specific to record drawings.
|
||
| Punchlist: Miscellaneous Water B Item | Resolved | Water Punchlist Section B |
|
Development & Permitting Services
Paint PIV to match FDC color.
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Development & Permitting Services
See storm FM anchoring note on approved civils sheet C5.00 and approved site plan sheet C3.02. Need design engineer letter and detail added to civil as-builts.
|
||
| Punchlist: Miscellaneous B Item | Open | Misc. Punchlist Section B |
|
Development & Permitting Services
Relocate fence along 33rd back to private property line.
|
||
| Punchlist: Miscellaneous Sewer A Item | Resolved | Sewer Punchlist Section A |
|
Development & Permitting Services
Repair ditch E&W of 33rd where sewer went through and stabilize with seed and straw.
|
||
| Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
|
Engineering Division
Verify that any outstanding fees have been paid. Contact Engineering Contract Specialist Robin Loewen at 253.841.5439, or via email at rloewen@puyallupwa.gov.
|
||
| Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
|
Engineering Division
Contact the Planning Department project reviewer, Chris Beale, at cbeale@puyallupwa.gov to request landscape walkthrough inspection and final approval. Landscape items may be added to the punchlist subject to Planning’s walkthrough.
|
||
| Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
|
Engineering Division
Provide acknowledgement from the Water Purveyor, Valley Water District, that the water installation is approved to their satisfaction.
|
||
| Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
|
Engineering Division
Provide acknowledgment from the Owner that it is understood that Occupancy triggers the one-year timeframe to submit design documents to the City for extension of the stormwater trunkline from 5th Ave SE southward. (Ref. KCook email dated March 20,2025).
|
||
| Punchlist: Miscellaneous B Item | Open | Misc. Punchlist Section B |
|
Engineering Division
Finish landscape.
|
||
| Punchlist: Miscellaneous B Item | Resolved | Misc. Punchlist Section B |
|
Engineering Division
Clean up laydown yard west of 33rd. Install grass seed and a heavy layer of straw. DO NOT GRAVEL this area!
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Engineering Division
Clean asphalt prior to brining storm online.
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Engineering Division
After asphalt is cleaned and all landscape has been completed, silt socks may be removed.
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Engineering Division
Once all landscape has been completed and parking has been cleaned, storm filters brought on line, bring storm pumps on line.
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Engineering Division
Install all CB lid bolts.
|
||
| Punchlist: Miscellaneous B Item | Resolved | Misc. Punchlist Section B |
|
Engineering Division
Contact the Planning Department project reviewer, Chris Beale, at cbeale@puyallupwa.gov to request landscape walkthrough inspection and final approval. Landscape items may be added to the punchlist subject to Planning’s walkthrough.
|
||
| Punchlist: Miscellaneous Water B Item | Resolved | Water Punchlist Section B |
|
Engineering Division
Provide acknowledgement from the Water Purveyor, Valley Water District, that the water installation is approved to their satisfaction.
|
||
| Punchlist: Miscellaneous Stormwater B Item | Open | Storm Punchlist Section B |
|
Engineering Division
Provide acknowledgment from the Owner that it is understood that Occupancy triggers the one-year timeframe to submit design documents to the City for extension of the stormwater trunkline from 5th Ave SE southward. (Ref. KCook email dated March 20, 2025).
|
||
| Reference Number | Status | Type |
|---|---|---|
| PRCNC20241019 | Permit(s) Issued | Commercial - New Construction |
| PRDE20241467 | Closed | Demolition |
| PRFO20241675 | Canceled | Foundation Only |
| PRCCP20241731 | Returned for Correction | Civil Construction Permit |
| PRFA20250370 | Closed | Fire Alarms |
| PRFS20250468 | Closed | Fire Sprinklers |
| PLPRE20220076 | File Closed | Pre-Application |
| PLTU20240110 | Waiting for Conditions | Temporary Use |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.