CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRDE20260358


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRDE20260358
Demolition
Permit(s) Issued
PUYALLUP TT LLC
Demolition
Existing Taco Time NW store to be turned into a plain building shell condition with future shell permit submittal and then a new coffee shop with a future TI permit submittal. This demolition permit submittal to include only demolition and prep as needed. all fixtures, furniture, equipment, and finishes to be removed. All interior walls to be removed unless noted otherwise. No work to be completed that will damage the structural integrity of the building. - PEM WOODS COFFEE
03/13/2026
04/07/2026
10/07/2026

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 04/06/2026 04/06/2026
Building Review Approved 04/06/2026 04/01/2026
Planning Review Approved 04/06/2026 03/24/2026

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee (Demolition) $251.25 $251.25 Paid 03/13/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Pending
Engineering Final Inspection Pending
Demolition Final Inspection Pending
Shannon King ((253) 840-6684)
Job Start Inspection Passed 4/10/2026 4/10/2026 04/10/2026
Michael Rosenau ((253) 344-6753)
Water Service Termination Inspection VOID 4/10/2026 04/10/2026
Michael Rosenau ((253) 344-6753)
Storm Service Termination Inspection VOID 4/10/2026 04/10/2026
Michael Rosenau ((253) 344-6753)
Sewer Service Termination Inspection VOID 4/10/2026 04/10/2026
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard demolition conditions: 1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: - No City utilities shall be removed, retired, or modified. All existing utilities shall remain to serve existing or remaining structures. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Miscellaneous Condition Open Submit With Building Permit Application
Planning Division
Nonresidential design review guidelines will be required to be met for any proposed changes to the exterior of the structure (PMC 20.26.300). When submitting the TI for changes to the exterior, please include the nonresidential design worksheet linked below. Please note that there are changes coming to our design standards that will be adopted in about six (6) months. In the meantime, PMC 20.26.300 will apply to this project. https://www.puyallupwa.gov/DocumentCenter/View/16334/Design-Review-Worksheet---Nonresidential?bidId=
Miscellaneous Condition Resolved Prior to Completion
Building Division
Demolition cannot begin until the application for the shell permit (PRCTI20260468) has been accepted.
Plumbing FUW Utility Service Credit Open Standard Conditions
Engineering Division
Upon demolition of the existing facilities, utility service credits become available for the subject site. It is the property owner’s responsibility to retain a copy of available utility service credits and to submit them to the City for future utility development credit. Utility service credits are only valid for a period of six years from the date of permit issuance for which the credits are granted. 23.5 water and 35 sewer FUW credits were granted for this demolition. Storm FUW credits can be redeemed on civil permits only. If you would like to redeem a portion or all of the credits on this permit, please provide the property owner’s written approval to do so.

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20260468 In Plan Check Commercial - Tenant Improvement/Remodel

Documents & Images

Date Uploaded File Type Name
03/13/2026 Receipt Receipt for transaction:2026-000436
03/13/2026 Letter Incomplete Submittal Notice
04/07/2026 Plans SITE PLAN (Stamped)
04/07/2026 Other Pre-Demolition Hazardous Materials Inspection (Stamped)
04/07/2026 Form Plumbing Fixture Worksheet (Stamped)
04/07/2026 Plans DEMOLITION CONSTRUCTION PLAN SET (Stamped)
04/07/2026 Permit Permit - Detailed


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.