PRDK20240314
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $1,161.75 | $1,161.75 | Paid | 06/03/2024 |
Building Plan Review Fee | $755.14 | $755.14 | Paid | 03/01/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 06/03/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $1,941.89 | $1,941.89 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Pending | |||
Comment Building Div Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Footing/Setback Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Building Final Inspection | VOID | 11/30/2024 | ||
CityView System Manger |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the Stormwater Fact Sheet and City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. Attached in CityView **
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
Reference Number | Status | Type |
---|---|---|
PRCCP20220770 | Permit(s) Issued | Civil Construction Permit |
PRCNC20221036 | Closed | Commercial - New Construction |
PRFS20230673 | Closed | Fire Sprinklers |
PRFA20230879 | Closed | Fire Alarms |
PRFA20230910 | Canceled | Fire Alarms |
PRFA20240386 | Closed | Fire Alarms |
PLPRE20210007 | File Closed | Pre-Application |
Date Uploaded | File Type | Name |
---|---|---|
02/29/2024 | Plans | Sun Lodge complete drawing set |
03/01/2024 | Receipt | Receipt for transaction:2024-000386 |
03/19/2024 | Letter | Permit Review Correction Letter |
03/19/2024 | Form | Application Form0 (Flattened) |
05/10/2024 | Letter | Incomplete Application Notice |
05/15/2024 | Form | CORRECTION RESPONSE LETTER |
05/31/2024 | Plans | SITE PLAN (Stamped) |
05/31/2024 | Plans | STRUCTURAL PLANS - RESUB (Stamped) |
05/31/2024 | Report | STRUCTURAL CALCULATIONS (Stamped) |
05/31/2024 | Plans | Sun Lodge complete drawing set (Stamped) |
05/31/2024 | Report | Sun Lodge Calcs (Stamped) |
05/31/2024 | Report | Pierce STEM Geotech Report 20210121 (Stamped) |
06/03/2024 | Letter | Permit - Detailed |
06/03/2024 | Receipt | Receipt for transaction:2024-001168 |
10/16/2024 | Letter | Permit Expiration Notice |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.