CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20221036


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20221036
Commercial - New Construction
Closed
ST OF WA
New
New ~54,000 SF building containing labs, classrooms, faculty and student spaces. REVISION (1) -003/21/2023 - ADDED DETAILS & DESIGN REFINEMENT FROM PERMIT SET TO IFC SET OF DOCUMENTS (NO CHANGE IN SQ FTG OR COST)
06/30/2022
11/29/2022
11/29/2024

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
08/25/2023 PC STEM IFC REVISION - RESUB (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 08/15/2023 08/24/2023
Building Review Failed 04/18/2023 04/20/2023
Fire Review VOID 04/18/2023 04/17/2023
Planning Review Approved 12/08/2022 11/18/2022
Fire Review VOID 12/08/2022 11/18/2022
Engineering Traffic Review VOID 12/08/2022 11/18/2022
Engineering Review VOID 12/08/2022 11/18/2022
Building Review VOID 12/08/2022 11/18/2022
Engineering Traffic Review Approved 10/24/2022 11/08/2022
Fire Review Approved 10/24/2022 10/24/2022
Planning Review Failed 10/24/2022 10/24/2022
Engineering Review Approved 10/24/2022 10/11/2022
Building Review Approved 10/24/2022 10/11/2022
Building Review Approved 08/19/2022 09/09/2022
Fire Review Failed 08/19/2022 08/25/2022
Engineering Review Approved 08/19/2022 08/18/2022
Planning Review Failed 08/19/2022 08/08/2022
Engineering Traffic Review Approved 08/19/2022 07/08/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 11/29/2022
Planning Landscape Review Fee $300.00 $300.00 Paid 11/29/2022
Air Handling Unit (Over 10,000 cfm) Fee $95.68 $95.68 Paid 11/29/2022
Boilers & Compressors/Heat Pump (over 1,750,000 or over 50 HP) Fee $244.96 $244.96 Paid 11/29/2022
Suspended, Recessed Wall, or Floor unit Heater Fee $117.30 $117.30 Paid 11/29/2022
Building Permit Fee $117,408.77 $117,408.77 Paid 11/29/2022
$118,448.50
Planning Building Permit Fee $120.00 $120.00 Paid 11/29/2022
Mechanical Permit Fee $40.00 $40.00 Paid 11/29/2022
Drinking Fountain, Water Cooler, Ice Machine Fee $161.00 $161.00 Paid 11/29/2022
Plumbing Permit Fee $40.00 $40.00 Paid 11/29/2022
Gas Piping (Plumbing) Fee $74.50 $74.50 Paid 11/29/2022
Plumbing Fixtures Fee $2,288.00 $2,288.00 Paid 11/29/2022
Sump, Sewage, or Ejector Pumps Fee $26.00 $26.00 Paid 11/29/2022
Water Heater Fee $26.00 $26.00 Paid 11/29/2022
Building Plan Review Fee $76,991.53 $76,991.53 Paid 07/05/2022
Mechanical Plan Review Fee $323.66 $323.66 Paid 07/05/2022
Plumbing Plan Review Fee $1,700.08 $1,700.08 Paid 07/05/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 11/29/2022
Building Permit Fee $1,039.73 $1,039.73 Paid 07/05/2022
$118,448.50
Traffic Impact Fee (Commercial) $451,800.00 $451,800.00 Paid 11/29/2022
Water System Development Charge $74,330.61 $74,330.61 Paid 11/29/2022
Sewer System Development Charge $125,857.52 $125,857.52 Paid 11/29/2022
Resubmittal Fee $130.00 $130.00 Paid 09/29/2022
Resubmittal Fee $130.00 $130.00 Paid 11/29/2022
Resubmittal Fee $180.00 $180.00 Paid 08/26/2023
Resubmittal Fee $180.00 $180.00 Paid 08/26/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Passed w/ Conditions 1/9/2023 01/09/2023
Jason Little ((253) 244-0387)
Job Start Inspection VOID 1/10/2023 01/10/2023
Jeannesha Frazier ((253) 841-5481)
Pre-Construction Building Inspection Not Ready 1/11/2023 1/11/2023 01/11/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Failed 1/26/2023 1/26/2023 01/27/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
01/26/2023
1 ; provide complete set of of structural plans for footing/foundation to City of Puyallup for review of all the changes per zone 1&2 rebar shop drawings ,to include structural IFC set.(new set of City Approved footing/foundation plans required prior to footing inspection) 2 ; provide special inspector approval prior to City of Puyallup inspection. 3 ; city approved plans show vertical rebar hooks under mat of rebar. 4 ; transverse dowels not installed under #4 rebar as per plans. 5 ; provide detail of continuous rebar at footing steps. 6 ; Special inspector and City of Puyallup inspector will need a complete set of City Approved plans onsite at time of inspection to complete footing inspection (due to all the onsite change from City Approved plans). not ready

Footing/Setback Inspection Not Ready 1/27/2023 1/27/2023 01/27/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/27/2023
1. see corrections on foundation inspection dated 1/26/2023 2. not ready

Footing/Setback Inspection Partial Pass 2/2/2023 2/2/2023 02/02/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
02/02/2023
1. see corrections on foundation inspection dated 1/26/2023 2. not ready

Footing/Setback Inspection Partial Pass 2/10/2023 2/10/2023 02/10/2023
Kevin Spruell ((253) 841-5590)
Footing/Setback Inspection Partial Pass 2/17/2023 2/17/2023 02/17/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/17/2023
1. complete column detail per city approved plans 2.provide special inspection report approval for this poor 3. provide letter from engineer of record on column detail as discussed with contractor 4.dose not include footing from C14 to C12 D7-A4 5.OK TO POUR

Foundation/Rebar Inspection Failed 2/23/2023 2/23/2023 02/23/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
02/23/2023
1 ; provide complete set of of structural plans for footing/foundation to City of Puyallup for review of all the changes per zone 1&2 rebar shop drawings ,to include structural IFC set.(new set of City Approved footing/foundation plans required prior to footing inspection) 2 ; provide special inspector approval prior to City of Puyallup inspection. 3 ; city approved plans show vertical rebar hooks under mat of rebar. 4 ; transverse dowels not installed under #4 rebar as per plans. 5 ; provide detail of continuous rebar at footing steps. 6 ; Special inspector and City of Puyallup inspector will need a complete set of City Approved plans onsite at time of inspection to complete footing inspection (due to all the onsite change from City Approved plans). not ready

Other/Miscellaneous
Carried Forward
02/23/2023
1 ; inspection of foundation at grid lines - (C5.5-C6.5,D3.75-D6.5) (D3.75,C2.75-C5.5) (C2.75, D1-D3.75) pending special inspection report of foundation inspection. 2 ; complete all rebar as per detail 13 of sheet S301 prior to reinspection. 3 ; complete rebar at pipe sleeve as per City approved plans. 4 ; complete vertical control joints as discussed with contractor. not ready

Foundation/Rebar Inspection Partial Pass 2/24/2023 2/24/2023 02/24/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/24/2023
1 ; inspection of foundation at grid lines - (C5.5-C6.5,D3.75-D6.5) (D3.75,C2.75-C5.5) (C2.75, D1-D3.75) pending special inspection report of foundation inspection. 2 ; complete all rebar as per detail 13 of sheet S301 prior to reinspection. 3 ; complete rebar at pipe sleeve as per City approved plans. 4 ; complete vertical control joints as discussed with contractor. not ready

Other/Miscellaneous
Carried Forward
02/24/2023
1. provide special inspection report for column's in zone 1 as discussed with contractor 2. provide inspection reports for water proofing at footing to wall joint 3.ok to stack panels per special inspector approval 4. area; zone 1@ grids C1/D3 to D5 lines

Foundation/Rebar Inspection Partial Pass 3/1/2023 3/1/2023 03/01/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/01/2023
1 ; inspection of foundation at grid lines - (C5.5-C6.5,D3.75-D6.5) (D3.75,C2.75-C5.5) (C2.75, D1-D3.75) pending special inspection report of foundation inspection. 2 ; complete all rebar as per detail 13 of sheet S301 prior to reinspection. 3 ; complete rebar at pipe sleeve as per City approved plans. 4 ; complete vertical control joints as discussed with contractor. not ready

Other/Miscellaneous
Carried Forward
03/01/2023
1. provide special inspection report for column's in zone 1 as discussed with contractor 2. provide inspection reports for water proofing at footing to wall joint 3.ok to stack panels per special inspector approval 4. area; zone 1@ grids C1/D3 to D5 lines

Comment Building Div Inspection Not Ready 3/6/2023 3/6/2023 03/06/2023
Shannon King ((253) 840-6684)
Footing/Setback Inspection Passed w/ Conditions 3/15/2023 3/15/2023 03/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
03/15/2023
1. complete column detail per city approved plans 2.provide special inspection report approval for this pour 3. provide letter from engineer of record on column detail as discussed with contractor 4.dose not include footing from C14 to C12 D7-A4 5.OK TO POUR

Other/Miscellaneous
Outstanding
03/15/2023
1 ; inspection of footing pads at grid line - (C8-C10,D2-D4) 2 ; provide geo-tech approved for soil bear as per City approved plans. 3 ; complete all rebar as per city approved plans . approved with special inspection approval.

Foundation/Rebar Inspection Passed w/ Conditions 3/15/2023 3/15/2023 03/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
03/15/2023
1 ; inspection of foundation at grid lines - (C5.5-C6.5,D3.75-D6.5) (D3.75,C2.75-C5.5) (C2.75, D1-D3.75) pending special inspection report of foundation inspection. 2 ; complete all rebar as per detail 13 of sheet S301 prior to reinspection. 3 ; complete rebar at pipe sleeve as per City approved plans. 4 ; complete vertical control joints as discussed with contractor. not ready

Other/Miscellaneous
Resolved
03/15/2023
1. provide special inspection report for column's in zone 1 as discussed with contractor 2. provide inspection reports for water proofing at footing to wall joint 3.ok to stack panels per special inspector approval 4. area; zone 1@ grids C1/D3 to D5 lines

Other/Miscellaneous
Outstanding
03/15/2023
1 ; inspection at grid line - (C1-C2.7,D1) (C1,D1-D5) (D5,C1-C2.7) approved with special inspection approval. 2 ; complete all rebar as per city approved plans. 3 ; provide min. clearances from forms to rebar as per city approved plans. 4 ; provide min. 4'' clearance between conduit as per plans.

Plumbing Below Slab Inspection Not Ready 3/20/2023 3/20/2023 03/20/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/20/2023
1. cancelled on site by contractor

Energy (Insulation) Inspection Partial Pass 3/21/2023 3/21/2023 03/21/2023
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 3/21/2023 3/21/2023 03/21/2023
Kevin Spruell ((253) 841-5590)
Comment Building Div Inspection Partial Pass 3/21/2023 3/21/2023 03/21/2023
Kevin Spruell ((253) 841-5590)
Plumbing Below Slab Inspection Partial Pass 3/21/2023 3/21/2023 03/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
03/21/2023
1. cancelled on site by contractor

Pre-Construction Building Inspection VOID 3/22/2023 3/22/2023 03/22/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 3/22/2023 3/22/2023 03/22/2023
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Partial Pass 3/27/2023 3/27/2023 03/27/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/27/2023
1 ; approved below slab plumbing in boiler room pending as built plans.

Energy (Insulation) Inspection Partial Pass 3/28/2023 3/28/2023 03/28/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 3/29/2023 3/29/2023 03/29/2023
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Partial Pass 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/30/2023
1 ; approved below slab plumbing in boiler room pending as built plans.

Energy (Insulation) Inspection Partial Pass 4/12/2023 4/12/2023 04/12/2023
Kevin Spruell ((253) 841-5590)
Plumbing Below Slab Inspection Partial Pass 4/12/2023 4/12/2023 04/12/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/12/2023
1 ; approved below slab plumbing in boiler room pending as built plans.

Footing/Setback Inspection Partial Pass 4/20/2023 4/20/2023 04/20/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 4/20/2023 4/20/2023 04/20/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 4/25/2023 4/25/2023 04/25/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 5/3/2023 5/3/2023 05/03/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 5/5/2023 5/5/2023 05/05/2023
Kevin Spruell ((253) 841-5590)
Slab/Insulation Inspection Partial Pass 5/9/2023 5/9/2023 05/09/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Partial Pass 5/15/2023 5/15/2023 05/15/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/15/2023
1 ; approved with special inspection approval.( complete dbl. rebar at construction joint as per city approved plans.) 2 ; inspection at level O - East half, level 1 - South half only

Slab/Insulation Inspection Partial Pass 8/22/2023 8/22/2023 08/22/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/22/2023
1 ; approved with special inspection approval.( complete dbl. rebar at construction joint as per city approved plans.) 2 ; inspection at level O - East half, level 1 - South half only

Slab/Insulation Inspection Partial Pass 8/29/2023 8/29/2023 08/29/2023
Kevin Spruell ((253) 841-5590)
Slab/Insulation Inspection Partial Pass 9/14/2023 9/14/2023 09/14/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 9/19/2023 9/19/2023 09/19/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Partial Pass 9/19/2023 9/19/2023 09/19/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/19/2023
1 ; approved with special inspection approval.( complete dbl. rebar at construction joint as per city approved plans.) 2 ; inspection at level O - East half, level 1 - South half only

Slab/Insulation Inspection Not Ready 9/22/2023 9/22/2023 09/22/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/22/2023
1. cancelled on site by contractor

Frame Inspection Not Ready 9/25/2023 9/25/2023 09/25/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection Not Ready 9/25/2023 9/25/2023 09/25/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Partial Pass 9/25/2023 9/25/2023 09/25/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/25/2023
1 ; approved with special inspection approval.( complete dbl. rebar at construction joint as per city approved plans.) 2 ; inspection at level O - East half, level 1 - South half only

Frame Inspection Not Ready 10/6/2023 10/6/2023 10/06/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
10/06/2023
1. cancelled on site by contractor

Wallboard / Drywall Inspection Not Ready 10/10/2023 10/10/2023 10/11/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
10/11/2023
1. provide listing details for rated wall assembly

Frame Inspection Partial Pass 10/10/2023 10/10/2023 10/11/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
10/11/2023
1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
10/11/2023
1. progressing with special inspections

Frame Inspection Failed 10/11/2023 10/11/2023 10/11/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
10/11/2023
1 ; inspection at grid line - (C1-C16) of framing prior to covering exterior walls only.( provide fix for cut studs at window opening,complete anchors at bottom plate and 2 clips at 6' window opening , and missing screws as discussed with contractor )not ready

Woodstove/Gas Insert Inspection VOID 10/13/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 10/23/2023 10/23/2023 10/23/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 10/23/2023 10/23/2023 10/23/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
10/23/2023
1 ; . inspection of exterior walls of the Penthouse prior to rough-in at grid line -(C8-C11,D2-D3) 2 ; complete detail - ( 7,8,9,10,11;12;) of S404 of City approved plans. not ready

Wallboard / Drywall Inspection Failed 10/25/2023 10/25/2023 10/25/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
10/25/2023
1 ; complete drywall nailing at grid line - (D1,C1-C16) as discussed with contractor.

Wallboard / Drywall Inspection Partial Pass 10/26/2023 10/26/2023 10/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
10/11/2023
1. provide listing details for rated wall assembly

Frame Inspection Partial Pass 10/26/2023 10/26/2023 10/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
10/11/2023
1. progressing with special inspections

Other/Miscellaneous
Outstanding
10/26/2023
1.inspection date 10/26/2023 progressing with specials

Frame Inspection Partial Pass 10/26/2023 10/26/2023 10/26/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
10/26/2023
1 ; . inspection of exterior walls of the Penthouse prior to rough-in at grid line -(C8-C11,D2-D3) 2 ; complete detail - ( 7,8,9,10,11;12;) of S404 of City approved plans. not ready

Other/Miscellaneous
Carried Forward
10/26/2023
1. inspection date 10/26/2023 progressing with specials

Wallboard / Drywall Inspection Partial Pass 11/2/2023 11/2/2023 11/02/2023
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Partial Pass 11/3/2023 11/3/2023 11/03/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
11/03/2023
1. partial approval 1st floor corridor water lines as marked up on page P1.02 on city approved plans 2. partial approval on gas line 1st floor corridor as marked on city approved plans page P1.02

Energy (Insulation) Inspection Partial Pass 11/6/2023 11/6/2023 11/06/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 11/6/2023 11/6/2023 11/06/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
10/11/2023
1 ; inspection at grid line - (C1-C16) of framing prior to covering exterior walls only.( provide fix for cut studs at window opening,complete anchors at bottom plate and 2 clips at 6' window opening , and missing screws as discussed with contractor )not ready

Frame Inspection Partial Pass 11/8/2023 11/8/2023 11/08/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
11/08/2023
1 ; complete 4 stud pack at grid line - (B1,A1-A4) as discussed with contractor. 2 ; complete anchor bolt at plate break at grid line - (B7,A!-A$) 3 ; (D6,C1-C7) roof framing of parapet complete.

Energy (Insulation) Inspection Not Ready 11/8/2023 11/8/2023 11/08/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection Not Ready 11/9/2023 11/9/2023 11/09/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 11/16/2023 11/16/2023 11/16/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
10/26/2023
1 ; . inspection of exterior walls of the Penthouse prior to rough-in at grid line -(C8-C11,D2-D3) 2 ; complete detail - ( 7,8,9,10,11;12;) of S404 of City approved plans. not ready

Other/Miscellaneous
Outstanding
10/26/2023
1. inspection date 10/26/2023 progressing with specials

Energy (Insulation) Inspection Partial Pass 11/16/2023 11/16/2023 11/16/2023
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Not Ready 11/21/2023 11/21/2023 11/21/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 11/21/2023 11/21/2023 11/21/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 11/21/2023 11/21/2023 11/21/2023
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Partial Pass 11/28/2023 11/28/2023 11/28/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 11/28/2023 11/28/2023 11/28/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Not Ready 11/29/2023 11/29/2023 11/29/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 11/30/2023 11/30/2023 11/30/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 11/30/2023 11/30/2023 11/30/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
11/30/2023
1. cancel per contractor

Wallboard / Drywall Inspection Not Ready 11/30/2023 11/30/2023 11/30/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
11/30/2023
1 ; cancel per contractor.

Plumbing Rough In Inspection Partial Pass 11/30/2023 11/30/2023 11/30/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 11/30/2023 11/30/2023 11/30/2023
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Partial Pass 12/1/2023 12/1/2023 12/01/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
12/01/2023
1. level 2 water lines in corridor approved per mark up on page P1.03 of city approved plans

Wallboard / Drywall Inspection Partial Pass 12/6/2023 12/6/2023 12/06/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
12/06/2023
1 ; cancel per contractor.

Other/Miscellaneous
Carried Forward
12/06/2023
1 ;all exterior drywall complete except penthouse.

Mechanical Rough In Inspection Partial Pass 12/6/2023 12/6/2023 12/06/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 12/8/2023 12/8/2023 12/08/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 12/8/2023 12/8/2023 12/08/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 12/11/2023 12/11/2023 12/11/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 12/13/2023 12/13/2023 12/13/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
12/13/2023
3rd floor framing not ready at time of inspection.( complete insulation at top track as per city approved plans as discussed with contractor)

Plumbing Rough In Inspection Partial Pass 12/13/2023 12/13/2023 12/13/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
12/13/2023
1. partial approval 1st floor corridor water lines as marked up on page P1.02 on city approved plans 2. partial approval on gas line 1st floor corridor as marked on city approved plans page P1.02

Other/Miscellaneous
Carried Forward
12/13/2023
Level 0,Level 1 rough-in plumbing approved as noted on approved plans.( except Drinking Fountain,plumbing next to rated wall at east wall of MDF room,level 1 tie-in above door at boiler room)

Wallboard / Drywall Inspection Partial Pass 12/13/2023 12/13/2023 12/13/2023
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Partial Pass 12/14/2023 12/14/2023 12/14/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 12/14/2023 12/14/2023 12/14/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Failed 12/18/2023 12/18/2023 12/18/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
12/18/2023
1 ; complete mineral wool at all fire rated walls on level 3 head of wall as per city approved plans.

Energy (Insulation) Inspection Failed 12/18/2023 12/18/2023 12/18/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
12/18/2023
1 ; provide attachment detail for insulation for level 3 low roof. eps at exterior roof.

Wallboard / Drywall Inspection Partial Pass 12/19/2023 12/19/2023 12/19/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 12/19/2023 12/19/2023 12/19/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
11/08/2023
1 ; complete 4 stud pack at grid line - (B1,A1-A4) as discussed with contractor. 2 ; complete anchor bolt at plate break at grid line - (B7,A!-A$) 3 ; (D6,C1-C7) roof framing of parapet complete.

Other/Miscellaneous
Outstanding
12/19/2023
1 ; inspection at 3rd floor head of wall insulation detail not complete at time of inspection 2; 2 screws at 16'' o.c. not complete at several locations of top track for top 6' for pre-rock. not ready

Frame Inspection Partial Pass 12/21/2023 12/21/2023 12/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
12/21/2023
1.framing on interior walls top outs on 3rd floor as marked up on 11x17 field drawing todays date approved for cover as discussed with contractor

Mechanical Rough In Inspection Partial Pass 12/21/2023 12/21/2023 12/21/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
12/21/2023
1. plumbing branch lines for ht as marked on sheet M301 approved for insulation

Frame Inspection Not Ready 12/27/2023 12/27/2023 12/27/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
12/27/2023
1.complete weathering in of 1 st floor 2. dry out all wall cavity's as discussed with contractor 3.clean all garbage and construction debri from wall cavity's 4.room 135 add stud where stud is compromised 5.complete head of wall detail room 135 6.room 133 complete head out in west wall 7.room 131 provide protection at plumbing pipes 8.room 131 north east wall first 8' not approved for cover due to sprinkler pipe in wall 9.room 126 emergency electrical room complete head of wall detail 10. north east stair wall complete head of wall detail 11.provide welding reports at time of next inspection 12.DO NOT INSULATE

Energy (Insulation) Inspection Partial Pass 12/28/2023 12/28/2023 12/28/2023
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Not Ready 12/28/2023 12/28/2023 12/28/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
12/28/2023
1 ; provide attachment detail for insulation for level 3 low roof. eps at exterior roof.

Other/Miscellaneous
Carried Forward
12/28/2023
1. no insulation was installed on upper roof at time of inspection

Frame Inspection Partial Pass 12/28/2023 12/28/2023 12/28/2023
Kevin Spruell ((253) 841-5590)
Plumbing Rough In Inspection Partial Pass 1/3/2024 1/3/2024 01/03/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/3/2024 1/3/2024 01/03/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/03/2024
1 ; complete drywall nailing at grid line - (D1,C1-C16) as discussed with contractor.

Other/Miscellaneous
Outstanding
01/03/2024
LEVEL 1 1.emergency electrical room 126 west wall first layer approved 2. room 128 sprinkler riser room north wall drywall approved LEVEL 3 1.room 313 elevator room west and east wall approved 2.rooms 314c and 314b drywall approved

Frame Inspection Partial Pass 1/3/2024 1/3/2024 01/03/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/03/2024
3rd floor framing not ready at time of inspection.( complete insulation at top track as per city approved plans as discussed with contractor)

Other/Miscellaneous
Outstanding
01/03/2024
LEVEL 0 1. provide install instructions for flues as discussed with contractor 2. ok to insulate areas marked up on 11x17 field drawings LEVEL 1 provide details sheets for core board at mech shafts and stair wall assembly's as discussed with contractor 2. complete framing around fire dampener's per install install instructions

Energy (Insulation) Inspection Failed 1/3/2024 1/3/2024 01/03/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/03/2024
1. complete insulation in areas that are displaced by plumbing or conduits 2.complete insulation at exterior corners 3. remove wet insulation stop the water intrusion prior to re insulating 4. complete insulation where exterior wall can be seen as discussed with contractor

Wallboard / Drywall Inspection Partial Pass 1/4/2024 1/4/2024 01/04/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/4/2024 1/4/2024 01/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/04/2024
1. no insulation was installed on upper roof at time of inspection

Other/Miscellaneous
Carried Forward
01/04/2024
1. complete core board per UL listing at stair wall 2.ok to install vapor barrier on exterior walls in areas discussed with contractor 3.insulation in rated walls in MDF room 1st floor west, east,and south walls approved 4. room 128 riser room and room 126 emergency electrical interior and exterior insulation approved rated walls

Energy (Insulation) Inspection Partial Pass 1/8/2024 1/8/2024 01/08/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/8/2024 1/8/2024 01/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/08/2024
1 ;all exterior drywall complete except penthouse.

Frame Inspection Partial Pass 1/8/2024 1/8/2024 01/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/08/2024
1.framing on interior walls top outs on 3rd floor as marked up on 11x17 field drawing todays date approved for cover as discussed with contractor

Other/Miscellaneous
Carried Forward
01/08/2024
LEVEL ONE 1. framing around fire dampener approved southeast shaft 2.framing around bath area approved 3.remove all construction debri from bottom plate at framing around MDF room 4. provide nail plates at DWV at plumbing by MDF room LEVEL TWO 1.south shaft wall in room 220 IDF framing approved

Frame Inspection Not Ready 1/9/2024 1/9/2024 01/09/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/09/2024
compete weathering in of building for areas looking for cover

Wallboard / Drywall Inspection Partial Pass 1/9/2024 1/9/2024 01/09/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Failed 1/9/2024 1/9/2024 01/09/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/09/2024
1. complete core board per UL listing at stair wall 2.ok to install vapor barrier on exterior walls in areas discussed with contractor 3.insulation in rated walls in MDF room 1st floor west, east,and south walls approved 4. room 128 riser room and room 126 emergency electrical interior and exterior insulation approved rated walls

Other/Miscellaneous
Carried Forward
01/09/2024
1.complete insulation on 0 floor as discussed with contractor 2. complete weathering in of building for areas looking for cover

Frame Inspection Partial Pass 1/10/2024 1/10/2024 01/10/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/10/2024 1/10/2024 01/10/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/10/2024 1/10/2024 01/10/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/11/2024 1/11/2024 01/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/11/2024
LEVEL ONE 1. framing around fire dampener approved southeast shaft 2.framing around bath area approved 3.remove all construction debri from bottom plate at framing around MDF room 4. provide nail plates at DWV at plumbing by MDF room LEVEL TWO 1.south shaft wall in room 220 IDF framing approved

Wallboard / Drywall Inspection Partial Pass 1/11/2024 1/11/2024 01/11/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/11/2024 1/11/2024 01/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/11/2024
1.complete insulation on 0 floor as discussed with contractor 2. complete weathering in of building for areas looking for cover

Other/Miscellaneous
Carried Forward
01/11/2024
LEVEL 0 1. vapor barrier on south and east wall approved 2.north wall dry out due to water leak not approved LEVEL ONE 1. north west and north wall ok to install vapor barrier LEVEL 2 2.IDF room interior north wall insulation approved LEVEL TREE 1. field equipment room 315 interior east wall insulation approved for top out 2. elevator machine room interior north and south wall insulation approved 3. organic room 314C north exterior wall top out insulation approved 4. organic room 314C and non organic room 314B exterior west wall top out insulation approved

Energy (Insulation) Inspection Partial Pass 1/12/2024 1/12/2024 01/12/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/16/2024 1/16/2024 01/16/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
01/03/2024
1. complete insulation in areas that are displaced by plumbing or conduits 2.complete insulation at exterior corners 3. remove wet insulation stop the water intrusion prior to re insulating 4. complete insulation where exterior wall can be seen as discussed with contractor

Wallboard / Drywall Inspection Partial Pass 1/16/2024 1/16/2024 01/16/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/18/2024 1/18/2024 01/18/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/18/2024 1/18/2024 01/18/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/22/2024 1/22/2024 01/22/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/22/2024 1/22/2024 01/22/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/22/2024 1/22/2024 01/22/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/23/2024 1/23/2024 01/23/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/23/2024
compete weathering in of building for areas looking for cover

Energy (Insulation) Inspection Partial Pass 1/23/2024 1/23/2024 01/23/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/23/2024 1/23/2024 01/23/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/24/2024 1/24/2024 01/24/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/24/2024 1/24/2024 01/24/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/24/2024 1/24/2024 01/24/2024
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 1/25/2024 1/25/2024 01/25/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/25/2024
1. plumbing branch lines for ht as marked on sheet M301 approved for insulation

Energy (Insulation) Inspection Partial Pass 1/25/2024 1/25/2024 01/25/2024
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 1/26/2024 1/26/2024 01/26/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/29/2024 1/29/2024 01/29/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/29/2024 1/29/2024 01/29/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 1/30/2024 1/30/2024 01/30/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/30/2024 1/30/2024 01/30/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 1/30/2024 1/30/2024 01/30/2024
Kevin Spruell ((253) 841-5590)
Plumbing Rough In Inspection Not Ready 1/31/2024 1/31/2024 01/31/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
01/31/2024
Level 0,Level 1 rough-in plumbing approved as noted on approved plans.( except Drinking Fountain,plumbing next to rated wall at east wall of MDF room,level 1 tie-in above door at boiler room)

Other/Miscellaneous
Carried Forward
01/31/2024
1. provide test on DWV at time of next inspection 2. not ready

Frame Inspection Partial Pass 1/31/2024 1/31/2024 01/31/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 1/31/2024 1/31/2024 01/31/2024
Kevin Spruell ((253) 841-5590)
Plumbing Rough In Inspection Partial Pass 2/1/2024 2/1/2024 02/01/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 2/1/2024 2/1/2024 02/01/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/1/2024 2/1/2024 02/01/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/6/2024 2/6/2024 02/06/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 2/6/2024 2/6/2024 02/06/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 2/7/2024 2/7/2024 02/07/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/7/2024 2/7/2024 02/07/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Failed 2/7/2024 2/7/2024 02/07/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
02/07/2024
LEVEL TWO 1. complete insulation as discussed with contractor at north,northwest,northeast and north south wall

Energy (Insulation) Inspection Partial Pass 2/8/2024 2/8/2024 02/08/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 2/12/2024 2/12/2024 02/12/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 2/12/2024 2/12/2024 02/12/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/12/2024 2/12/2024 02/12/2024
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 2/12/2024 2/12/2024 02/12/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 2/13/2024 2/13/2024 02/13/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Failed 2/13/2024 2/13/2024 02/13/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/13/2024
LEVEL TWO 1.complete framing around fire dampers in MECH shafts per manufactures install instructions

Wallboard / Drywall Inspection Partial Pass 2/13/2024 2/13/2024 02/13/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 2/14/2024 2/14/2024 02/14/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/14/2024 2/14/2024 02/14/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/14/2024
LEVEL TWO 1.MECH shaft next to room 207 south, east,and west wall complete fire stop do not insulate 2.north wall approved 3.MECH shaft next IDF room north wall approved 4.west wall complete putty packs around electrical boxes do not insulate 5. elevator shaft east and south wall approved 6.MECH shaft next to elevator shaft east,west,and north wall approved 7.stairwell wall at SE corner complete putty packs at electrical boxes do not insulate

Wallboard / Drywall Inspection Partial Pass 2/15/2024 2/15/2024 02/15/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/15/2024 2/15/2024 02/15/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 2/20/2024 2/20/2024 02/20/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/20/2024
LEVEL TWO 1. southeast stair wall complete insulation as discussed with contractor do not cover 2.MECH shaft next to room 207 south wall complete insulation as discussed with contractor do not cover 3.east, west, and north wall approved 4.elevator shaft east and south wall approved 5.MECH shaft next to elevator east,west,south and north walls approved 6.MECH shaft next to IDF room north and west wall approved

Energy (Insulation) Inspection Partial Pass 2/21/2024 2/21/2024 02/21/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
02/21/2024
LEVEL TWO 1.SE stair wall in room 208 approved 2. MECH shaft next to room 207 complete insulation and framing as discussed with contractor DO NOT COVER

Frame Inspection Partial Pass 2/21/2024 2/21/2024 02/21/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/21/2024
LEVEL 0 1. vestibule 2 exterior walls ok to cover outside only 2.SE stairs north wall provide details on clip attachment DO NOT COVER

Wallboard / Drywall Inspection Partial Pass 2/21/2024 2/21/2024 02/21/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/22/2024 2/22/2024 02/22/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/22/2024
LEVEL TWO 1.MECH shaft next to room 207 south, east,and west wall complete fire stop do not insulate 2.north wall approved 3.MECH shaft next IDF room north wall approved 4.west wall complete putty packs around electrical boxes do not insulate 5. elevator shaft east and south wall approved 6.MECH shaft next to elevator shaft east,west,and north wall approved 7.stairwell wall at SE corner complete putty packs at electrical boxes do not insulate

Mechanical Rough In Inspection Partial Pass 2/21/2024 2/21/2024 02/22/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/22/2024
LEVEL ONE 1.hard lid at MECH shaft next to elevator provide listing for rated ceiling not approved 2.custodial room 121 next to MDF room missing return duct R/I approved LEVEL TWO 1. bathroom hard lids approved 2.soffits at southwest end of building approved LEVEL THREE 1.MECH approved for insulation except as noted on city approved plans page M203

Wallboard / Drywall Inspection Partial Pass 2/22/2024 2/22/2024 02/22/2024
Kevin Spruell ((253) 841-5590)
Plumbing Rough In Inspection Partial Pass 2/26/2024 2/26/2024 02/26/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 2/26/2024 2/26/2024 02/26/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
02/26/2024
LEVEL TWO 1.complete framing around fire dampers in MECH shafts per manufactures install instructions

Wallboard / Drywall Inspection Partial Pass 2/26/2024 2/26/2024 02/26/2024
Kevin Spruell ((253) 841-5590)
Plumbing Rough In Inspection Partial Pass 2/27/2024 2/27/2024 02/27/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/27/2024
1. provide test on DWV at time of next inspection 2. not ready

Wallboard / Drywall Inspection Partial Pass 2/28/2024 2/28/2024 02/28/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 2/28/2024 2/28/2024 02/28/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
02/28/2024
LEVEL TWO 1.MECH shaft next to room 207 south, east,and west wall complete fire stop do not insulate 2.north wall approved 3.MECH shaft next IDF room north wall approved 4.west wall complete putty packs around electrical boxes do not insulate 5. elevator shaft east and south wall approved 6.MECH shaft next to elevator shaft east,west,and north wall approved 7.stairwell wall at SE corner complete putty packs at electrical boxes do not insulate

Energy (Insulation) Inspection Partial Pass 2/29/2024 2/29/2024 02/29/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 3/1/2024 3/1/2024 03/01/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
02/21/2024
LEVEL 0 1. vestibule 2 exterior walls ok to cover outside only 2.SE stairs north wall provide details on clip attachment DO NOT COVER

Energy (Insulation) Inspection Partial Pass 3/4/2024 3/4/2024 03/04/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 3/4/2024 3/4/2024 03/04/2024
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 3/4/2024 3/4/2024 03/04/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/4/2024 3/4/2024 03/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/04/2024
LEVEL THREE 1. MECH shaft next to IDF room north wall remove drywall at top out as discussed with contractor to re-insulate 2.MECH shaft next to IDF room north wall provide clearance at fire dampener as discussed with contractor 3. MECH shaft next elevator west and east approved 4. MECH shaft next to elevator east wall remove drywall at top out to Re-insulate 5. MECH shaft at room 308 earth science lab east, south, and north wall approved

Energy (Insulation) Inspection Partial Pass 3/5/2024 3/5/2024 03/05/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
02/20/2024
LEVEL TWO 1. southeast stair wall complete insulation as discussed with contractor do not cover 2.MECH shaft next to room 207 south wall complete insulation as discussed with contractor do not cover 3.east, west, and north wall approved 4.elevator shaft east and south wall approved 5.MECH shaft next to elevator east,west,south and north walls approved 6.MECH shaft next to IDF room north and west wall approved

Wallboard / Drywall Inspection Partial Pass 3/6/2024 3/6/2024 03/06/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/6/2024 3/6/2024 03/06/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
03/06/2024
LEVEL ONE 1.ceiling at mech shaft next to elevator complete fasteners at head out and framing at red iron as discussed with contractor 2.ok to insulate LEVEL THREE 1.MECH shaft next to IDF room north wall ok to insulate 2. MECH shaft next to elevator east, west, north, and south wall ok to insulate 3. elevator shaft south and east wall ok to insulate ROOF pent house 1. remove water from bottom plate 2.do not insulate

Energy (Insulation) Inspection Partial Pass 3/6/2024 3/6/2024 03/06/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 3/7/2024 3/7/2024 03/07/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/7/2024 3/7/2024 03/07/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Not Ready 3/8/2024 3/8/2024 03/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/08/2024
1. cancelled by contractor

Energy (Insulation) Inspection Partial Pass 3/11/2024 3/11/2024 03/11/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/11/2024
1 ;complete insulation at mechanical shafts as discussed with contractor. not ready

Wallboard / Drywall Inspection Partial Pass 3/12/2024 3/12/2024 03/12/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
03/12/2024
LEVEL THREE 1.progression inspection approved 2.remove drywall at exterior wall in room 312 where water is coming in to the building

Frame Inspection Partial Pass 3/12/2024 3/12/2024 03/12/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
02/28/2024
LEVEL TWO 1.MECH shaft next to room 207 south, east,and west wall complete fire stop do not insulate 2.north wall approved 3.MECH shaft next IDF room north wall approved 4.west wall complete putty packs around electrical boxes do not insulate 5. elevator shaft east and south wall approved 6.MECH shaft next to elevator shaft east,west,and north wall approved 7.stairwell wall at SE corner complete putty packs at electrical boxes do not insulate

Energy (Insulation) Inspection Partial Pass 3/12/2024 3/12/2024 03/12/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
03/12/2024
1. cancelled by contractor

Frame Inspection Partial Pass 3/14/2024 3/14/2024 03/14/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/14/2024
LEVEL THREE 1. MECH shaft next to IDF room north wall remove drywall at top out as discussed with contractor to re-insulate 2.MECH shaft next to IDF room north wall provide clearance at fire dampener as discussed with contractor 3. MECH shaft next elevator west and east approved 4. MECH shaft next to elevator east wall remove drywall at top out to Re-insulate 5. MECH shaft at room 308 earth science lab east, south, and north wall approved

Other/Miscellaneous
Carried Forward
03/14/2024
1 ; complete electrical rough-in and cover approval at mechanical shaft of 1st floor at s.e. corner.(ok to cover bottom of shaft only) 2 ; bathroom ceiling at 2nd floor approved.

Wallboard / Drywall Inspection Partial Pass 3/14/2024 3/14/2024 03/14/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 3/14/2024 3/14/2024 03/14/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 3/13/2024 3/13/2024 03/15/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/15/2024
LEVEL TWO 1.room 231 perimeter soffit approved 2.room 235 complete framing at south perimeter wall as discussed with contractor 3.room 235 perimeter soffit on west and north wall approved 4.room 234 perimeter soffit on north wall approved 5. room 232 perimeter soffit approved 6.room 233 repair mono coat soffits not approved

Wallboard / Drywall Inspection Partial Pass 3/13/2024 3/13/2024 03/15/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/19/2024 3/19/2024 03/19/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 3/19/2024 3/19/2024 03/19/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 3/20/2024 3/20/2024 03/20/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 3/20/2024 3/20/2024 03/20/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 3/22/2024 3/22/2024 03/22/2024
Kevin Spruell ((253) 841-5590)
Ceiling Grid/T-Bar Inspection Not Ready 3/27/2024 3/27/2024 03/27/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/27/2024
1. provide all install instructions for all ceilings 2. this was a comment inspection 3. not ready

Frame Inspection Partial Pass 3/27/2024 3/27/2024 03/27/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
03/27/2024
LEVEL TWO 1.room 231 perimeter soffit approved 2.room 235 complete framing at south perimeter wall as discussed with contractor 3.room 235 perimeter soffit on west and north wall approved 4.room 234 perimeter soffit on north wall approved 5. room 232 perimeter soffit approved 6.room 233 repair mono coat soffits not approved

Wallboard / Drywall Inspection Partial Pass 3/27/2024 3/27/2024 03/27/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 3/28/2024 3/28/2024 03/28/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
03/28/2024
LEVEL THREE 1. MECH shaft next to IDF room north wall remove drywall at top out as discussed with contractor to re-insulate 2.MECH shaft next to IDF room north wall provide clearance at fire dampener as discussed with contractor 3. MECH shaft next elevator west and east approved 4. MECH shaft next to elevator east wall remove drywall at top out to Re-insulate 5. MECH shaft at room 308 earth science lab east, south, and north wall approved

Other/Miscellaneous
Resolved
03/28/2024
1 ; complete electrical rough-in and cover approval at mechanical shaft of 1st floor at s.e. corner.(ok to cover bottom of shaft only) 2 ; bathroom ceiling at 2nd floor approved.

Other/Miscellaneous
Outstanding
03/28/2024
1. SE stairwell complete plumbing insulation ,firestopping, provide new special inspection report for fire stopping. LEVEL THREE 1. room 305 fir out wall approved

Wallboard / Drywall Inspection Partial Pass 3/28/2024 3/28/2024 03/28/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Failed 3/29/2024 3/29/2024 03/29/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/29/2024
1 ;complete insulation at level 3 curve wall. ( ok to install vapor barrier)

Wallboard / Drywall Inspection Partial Pass 3/29/2024 3/29/2024 03/29/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 3/29/2024 3/29/2024 03/29/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/2/2024 4/2/2024 04/02/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 4/2/2024 4/2/2024 04/02/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Failed 4/2/2024 4/2/2024 04/03/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/03/2024
1 ;complete insulation at level 3 curve wall. ( ok to install vapor barrier)

Other/Miscellaneous
Carried Forward
04/03/2024
SE STAIR WELL 1.complete firestop 2.complete insulation as discussed with contractor LEVEL THREE 1.complete rigid insulation at header as discussed with contractor

Energy (Insulation) Inspection Partial Pass 4/3/2024 4/3/2024 04/03/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/4/2024 4/4/2024 04/04/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 4/4/2024 4/4/2024 04/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/04/2024
SE STAIR WELL 1.complete firestop 2.complete insulation as discussed with contractor LEVEL THREE 1.complete rigid insulation at header as discussed with contractor

Other/Miscellaneous
Carried Forward
04/04/2024
1. SE stairwell level o, 1, 2, exterior walls and rated walls ok to cover 2. level three SE stair well complete insulation and putty packs at electrical boxes do not cover

Energy (Insulation) Inspection Failed 4/8/2024 4/8/2024 04/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/08/2024
LEVEL THREE 1.SE stair well complete fire taping and insulation as discussed with contractor

Wallboard / Drywall Inspection Partial Pass 4/8/2024 4/8/2024 04/08/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 4/9/2024 4/9/2024 04/09/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 4/9/2024 4/9/2024 04/09/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 4/9/2024 4/9/2024 04/09/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/09/2024
SE STAIR WELL 1.complete firestop 2.complete insulation as discussed with contractor LEVEL THREE 1.complete rigid insulation at header as discussed with contractor

Other/Miscellaneous
Carried Forward
04/09/2024
1. SE stairwell level o, 1, 2, exterior walls and rated walls ok to cover 2. level three SE stair well complete insulation and putty packs at electrical boxes do not cover

Wallboard / Drywall Inspection Partial Pass 4/11/2024 4/11/2024 04/11/2024
Kevin Spruell ((253) 841-5590)
Ceiling Grid/T-Bar Inspection Not Ready 4/16/2024 4/16/2024 04/16/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/16/2024
1. provide all install instructions for all ceilings 2. this was a comment inspection 3. not ready

Other/Miscellaneous
Carried Forward
04/16/2024
1. this was a comment inspection 2. discussed ceiling requirements

Mechanical Rough In Inspection Partial Pass 4/17/2024 4/17/2024 04/17/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Failed 4/17/2024 4/17/2024 04/17/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/17/2024
1 ; complete mineral wool at beam to pan deck. 2 ; complete shaft liner as discussed with contractor. 3 ; contractor will need to verify min. 6'8'' finished ceiling height.( temporary landing and no finished stair treads installed at time of inspection) at stair #2

Frame Inspection Partial Pass 4/18/2024 4/18/2024 04/19/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 4/18/2024 4/18/2024 04/19/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 4/19/2024 4/19/2024 04/19/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 4/23/2024 4/23/2024 04/23/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/23/2024
1 ; complete mineral wool at beam to pan deck. 2 ; complete shaft liner as discussed with contractor. 3 ; contractor will need to verify min. 6'8'' finished ceiling height.( temporary landing and no finished stair treads installed at time of inspection) at stair #2

Frame Inspection Not Ready 4/24/2024 4/24/2024 04/24/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/24/2024
1 ;contractor will remove insulation prior to next inspection at level 1&2 shaft wall for reinspection of corrections.

Wallboard / Drywall Inspection Partial Pass 4/25/2024 4/25/2024 04/25/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/25/2024 4/25/2024 04/25/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/26/2024 4/26/2024 04/26/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/26/2024 4/26/2024 04/26/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
04/26/2024
1 ;contractor will remove insulation prior to next inspection at level 1&2 shaft wall for reinspection of corrections.

Energy (Insulation) Inspection Not Ready 4/29/2024 4/29/2024 04/29/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/29/2024
SE STAIR WELL 1.complete firestop 2.complete insulation as discussed with contractor LEVEL THREE 1.complete rigid insulation at header as discussed with contractor

Other/Miscellaneous
Resolved
04/29/2024
1. SE stairwell level o, 1, 2, exterior walls and rated walls ok to cover 2. level three SE stair well complete insulation and putty packs at electrical boxes do not cover

Other/Miscellaneous
Carried Forward
04/29/2024
1. SE stairwell level 2 soffits and rated ceiling complete putty packs at electrical boxes 2. SE stairwell level 3 ceiling complete putty packs at electrical boxes, complete sprinklers, and provide clarification on electrical box half in ceiling framing

Energy (Insulation) Inspection Partial Pass 4/30/2024 4/30/2024 04/30/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/30/2024
LEVEL THREE 1.SE stair well complete fire taping and insulation as discussed with contractor

Energy (Insulation) Inspection Partial Pass 5/1/2024 5/1/2024 05/01/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/01/2024
1. SE stairwell level 2 soffits and rated ceiling complete putty packs at electrical boxes 2. SE stairwell level 3 ceiling complete putty packs at electrical boxes, complete sprinklers, and provide clarification on electrical box half in ceiling framing

Other/Miscellaneous
Carried Forward
05/01/2024
1 ; stair 1 walls (complete insulation at exterior walls at all location as discussed with Scott) ok to complete vapor barrier

Frame Inspection Partial Pass 5/3/2024 5/3/2024 05/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
03/27/2024
LEVEL TWO 1.room 231 perimeter soffit approved 2.room 235 complete framing at south perimeter wall as discussed with contractor 3.room 235 perimeter soffit on west and north wall approved 4.room 234 perimeter soffit on north wall approved 5. room 232 perimeter soffit approved 6.room 233 repair mono coat soffits not approved

Wallboard / Drywall Inspection Partial Pass 5/3/2024 5/3/2024 05/04/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 5/3/2024 5/3/2024 05/04/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 5/7/2024 5/7/2024 05/07/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 5/8/2024 5/8/2024 05/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/08/2024
1. front of elevator head of wall levels 1, 2, 3 approved as discussed with contractor

Frame Inspection Failed 5/10/2024 5/10/2024 05/10/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/10/2024
1 ; inspection of shaft wall framing at face of elevator of levels - 0-3 only. 2 ; provide special inspection approval report for firestop of penetration at shaft liner. 3 ; provide install instructions for elevator door to complete framing inspection of level 0-3. 4 ; provide fire treated wood or steel backing for electrical boxes. not a complete inspection.

Energy (Insulation) Inspection Partial Pass 5/10/2024 5/10/2024 05/10/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Not Ready 5/13/2024 5/13/2024 05/13/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
05/01/2024
1 ; stair 1 walls (complete insulation at exterior walls at all location as discussed with Scott) ok to complete vapor barrier

Wallboard / Drywall Inspection Partial Pass 5/15/2024 5/15/2024 05/16/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 5/15/2024 5/15/2024 05/16/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 5/15/2024 5/15/2024 05/16/2024
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Not Ready 5/16/2024 5/16/2024 05/16/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Failed 5/16/2024 5/16/2024 05/16/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/16/2024
1. front of elevator head of wall levels 1, 2, 3 approved as discussed with contractor

Other/Miscellaneous
Carried Forward
05/16/2024
1. provide install instructions for elevator door from manufacture at time of next inspection 2. provide access to elevator at time of next inspection

Energy (Insulation) Inspection Partial Pass 5/17/2024 5/17/2024 05/17/2024
Kevin Spruell ((253) 841-5590)
Ceiling Grid/T-Bar Inspection Not Ready 5/21/2024 5/21/2024 05/21/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/21/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
05/21/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Energy (Insulation) Inspection Partial Pass 5/21/2024 5/21/2024 05/21/2024
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 5/22/2024 5/22/2024 05/22/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/22/2024
1 ; inspection of shaft wall framing at face of elevator of levels - 0-3 only. 2 ; provide special inspection approval report for firestop of penetration at shaft liner. 3 ; provide install instructions for elevator door to complete framing inspection of level 0-3. 4 ; provide fire treated wood or steel backing for electrical boxes. not a complete inspection.

Wallboard / Drywall Inspection Partial Pass 5/22/2024 5/22/2024 05/22/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 5/23/2024 5/23/2024 05/23/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 5/24/2024 5/24/2024 05/24/2024
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 6/5/2024 6/5/2024 06/05/2024
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 6/7/2024 6/7/2024 06/07/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/07/2024
1. front of elevator head of wall levels 1, 2, 3 approved as discussed with contractor

Other/Miscellaneous
Carried Forward
06/07/2024
1. provide install instructions for elevator door from manufacture at time of next inspection 2. provide access to elevator at time of next inspection

Frame Inspection Partial Pass 6/10/2024 6/10/2024 06/10/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 6/11/2024 6/11/2024 06/11/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 6/12/2024 6/12/2024 06/12/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 6/14/2024 6/14/2024 06/15/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 6/14/2024 6/14/2024 06/15/2024
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 6/17/2024 6/17/2024 06/17/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 6/18/2024 6/18/2024 06/18/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 6/20/2024 6/20/2024 06/20/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/20/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
06/20/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
06/20/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Frame Inspection Partial Pass 6/21/2024 6/21/2024 06/21/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 6/25/2024 6/25/2024 06/25/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/25/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
06/25/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
06/25/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Ceiling Grid/T-Bar Inspection Not Ready 6/27/2024 6/27/2024 06/27/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/27/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
06/27/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
06/27/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
06/27/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Firewall/Firestop Inspection Partial Pass 6/28/2024 6/28/2024 06/29/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/29/2024
1 ; complete mineral wool at all fire rated walls on level 3 head of wall as per city approved plans.

Other/Miscellaneous
Carried Forward
06/29/2024
date of inspection 6/28/2024 1.fire stopping of elevator shaft approved per special inspection

Ceiling Grid/T-Bar Inspection Partial Pass 7/2/2024 7/2/2024 07/02/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/02/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
07/02/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
07/02/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
07/02/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Carried Forward
07/02/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Ceiling Grid/T-Bar Inspection Partial Pass 7/9/2024 7/9/2024 07/09/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/09/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
07/09/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
07/09/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
07/09/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Carried Forward
07/09/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Ceiling Grid/T-Bar Inspection Partial Pass 7/23/2024 7/23/2024 07/23/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/23/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
07/23/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
07/23/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
07/23/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Carried Forward
07/23/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Ceiling Grid/T-Bar Inspection Not Ready 7/24/2024 7/24/2024 07/24/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 7/29/2024 7/29/2024 07/29/2024
Kevin Spruell ((253) 841-5590)
Ceiling Grid/T-Bar Inspection Not Ready 08/06/2024
Julie Johnson ((253) 841-5482)
Other/Miscellaneous
Carried Forward
08/06/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
08/06/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
08/06/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
08/06/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Carried Forward
08/06/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Ceiling Grid/T-Bar Inspection Partial Pass 8/7/2024 8/7/2024 08/08/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
08/08/2024
date of inspection 8/7/2024 LEVEL ONE 1.bathroom area approved as discussed with contractor (see marked up plans on site for corrections) 2.fab lab check in area room 135 approved LEVEL TWO 1.corridor approved as discussed with contractor (see marked up plans on site for corrections ) 2.area in front of elevator approved 3.area at bathrooms approved as discussed with contractor (see marked up plans on site for corrections) 4. rooms 203 and 204 and conference room approved

Ceiling Grid/T-Bar Inspection Partial Pass 8/14/2024 8/14/2024 08/14/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/14/2024
inspection of ceiling grid at levels 1-3.( complete all corrections as noted on plans prior to next inspection)

Ceiling Grid/T-Bar Inspection Partial Pass 8/23/2024 8/23/2024 08/23/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/23/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Carried Forward
08/23/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Carried Forward
08/23/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Carried Forward
08/23/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Fire Final Inspection Not Ready 8/26/2024 8/26/2024 09/03/2024
David Drake ((253) 864-4171)
Plumbing Final Inspection Not Ready 9/3/2024 9/3/2024 09/03/2024
Kevin Spruell ((253) 841-5590)
Mechanical Final Inspection Not Ready 9/3/2024 9/3/2024 09/04/2024
Kevin Spruell ((253) 841-5590)
Building Final Inspection Not Ready 9/3/2024 9/3/2024 09/04/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/04/2024
date of inspection 9/3/2024 inspection of exterior 1.paint gas pipe 2. seal penetration's where gas pipe enters building 3.seal foundation at gas meter where water is flowing 4.provide screens at air intakes and exhaust LEVEL 0 1. provide all final letters 2.complete install of doors at vestibule 3.complete floor transition at interior door at vestibule 4. complete accessible switches at vestibule doors 5.provide ADA signage/ brail at exits 6.provide proper clearance at handrail at gravity lab stairs 7.complete fire stopping at shafts in boiler room 8.Once final letters are on site to review all mechanical will be inspected in boiler room

Ceiling Grid/T-Bar Inspection Partial Pass 9/5/2024 9/5/2024 09/06/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
09/06/2024
date of inspection 8/7/2024 LEVEL ONE 1.bathroom area approved as discussed with contractor (see marked up plans on site for corrections) 2.fab lab check in area room 135 approved LEVEL TWO 1.corridor approved as discussed with contractor (see marked up plans on site for corrections ) 2.area in front of elevator approved 3.area at bathrooms approved as discussed with contractor (see marked up plans on site for corrections) 4. rooms 203 and 204 and conference room approved

Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 9/4/2024 1. 2nd floor fab lab paint booth area approved

Building Final Inspection Failed 9/5/2024 9/5/2024 09/06/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/06/2024
date of inspection 8/4/2024 LEVEL 1 1.guard rail in hallway next to room 126 needs to be min of 42" high 2. complete mono coat in electrical room 126 3.complete fire stop in electrical room126 4. complete mono coat in room 127 5.complete fire stopping in room127 6.complete electrical in ceiling in hall way by fire sprinkler riser room 7.complete fire caulking in room 128 8. complete junction boxes at hot water tanks room 128 9.complete condensate line at mini split in room 128 10. provide back flow certs 11.bottom step of fire sprinkler riser stairs exceeds 7" in rise 12.room 121 complete fire stopping south wall 13.room 120 complete fire stopping 14. complete mono coat 15. room 136 complete top of wall at rated wall 16.room 120 at exterior complete head of wall 17.room 104 at rated stair wall complete fire stopping and complete missing drywall 18.provide brail signage at ADA bathroom 19. complete paper towel holders per ADA at sinks DATE OF INSPECTION 8/5/2024 STAIRS STAIRWELL 2 1.level 0 complete 2 penetration's 2.level one mid landing guardrail needs to min of 42" high 3.level one mid landing guardrail at wall not to exceed 4" clearance at wall 4. complete handrail clearances not to be less than 1 1/2 " at landing turns STAIRWELL 1 1.level 3 top flight of stairs not exceed not exceed 7" in rise 2. complete handrail clearances not to be less than 1 1/2" at landing turns 3. stairs not to exceed 3/8" variance in entire flight of stairs 4. 1st floor bottom step not to exceed 7" in rise 5.complete fire taping at stair stringer level 1 DATE OF INSPECTION 9/5/2024 level 2 1.provide min 42" ht at guardrail 2.room 236 complete firestopping at rated wall 3.room 220 complete firestopping at rated wall 4.room 220 remove paper from sprinkler heads 5.room 220 complete covers on jay boxes 6.provide hammer arrestor at ice maker 7. provide backflow cert for ice maker 8. provide hammer arrestor and air gap at dishwasher 9. room 231 provide tops at window sills 10. room 208 complete fire stopping at rated stair wall at conduits and at beam 11.complets vertical grab bars in ADA stalls as discussed with contractor 12. provide brail signage at ADA stalls

Comment Engineering Div Inspection VOID 09/10/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection VOID 09/10/2024
Jason Little ((253) 244-0387)
Engineering Final Inspection Passed w/ Conditions 9/10/2024 09/10/2024
Jason Little ((253) 244-0387)
Comment Building Div Inspection Not Ready 9/10/2024 9/10/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
09/11/2024
date of inspection 9/10/2024 1.started process of looking at all life safety items

Building Final Inspection Not Ready 9/6/2024 9/6/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/3/2024 inspection of exterior 1.paint gas pipe 2. seal penetration's where gas pipe enters building 3.seal foundation at gas meter where water is flowing 4.provide screens at air intakes and exhaust LEVEL 0 1. provide all final letters 2.complete install of doors at vestibule 3.complete floor transition at interior door at vestibule 4. complete accessible switches at vestibule doors 5.provide ADA signage/ brail at exits 6.provide proper clearance at handrail at gravity lab stairs 7.complete fire stopping at shafts in boiler room 8.Once final letters are on site to review all mechanical will be inspected in boiler room

Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/6/2024 level 3 1. room 340 complete fire caulking at fire alarm conduit west wall 2.room 340 complete fire caulking at brace frame 3.room 320 complete fire caulking at south wall 4.room 320 remove painters from sprinkler head 5. room 316 complete window sills 6.room 316 provide hammer arrestor at ice maker 7. room 310 complete window sills 8.room 310 provide info on wave table 9.room 301 complete fire caulking at conduits 10. room 304 complete hose clamp at sink 11. bathroom complete brall signage 12.provide proper clearance at grab bars in ada stall at bathrooms

Mechanical Final Inspection Not Ready 9/9/2024 9/9/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Building Final Inspection Partial Pass 9/9/2024 9/9/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 8/4/2024 LEVEL 1 1.guard rail in hallway next to room 126 needs to be min of 42" high 2. complete mono coat in electrical room 126 3.complete fire stop in electrical room126 4. complete mono coat in room 127 5.complete fire stopping in room127 6.complete electrical in ceiling in hall way by fire sprinkler riser room 7.complete fire caulking in room 128 8. complete junction boxes at hot water tanks room 128 9.complete condensate line at mini split in room 128 10. provide back flow certs 11.bottom step of fire sprinkler riser stairs exceeds 7" in rise 12.room 121 complete fire stopping south wall 13.room 120 complete fire stopping 14. complete mono coat 15. room 136 complete top of wall at rated wall 16.room 120 at exterior complete head of wall 17.room 104 at rated stair wall complete fire stopping and complete missing drywall 18.provide brail signage at ADA bathroom 19. complete paper towel holders per ADA at sinks DATE OF INSPECTION 8/5/2024 STAIRS STAIRWELL 2 1.level 0 complete 2 penetration's 2.level one mid landing guardrail needs to min of 42" high 3.level one mid landing guardrail at wall not to exceed 4" clearance at wall 4. complete handrail clearances not to be less than 1 1/2 " at landing turns STAIRWELL 1 1.level 3 top flight of stairs not exceed not exceed 7" in rise 2. complete handrail clearances not to be less than 1 1/2" at landing turns 3. stairs not to exceed 3/8" variance in entire flight of stairs 4. 1st floor bottom step not to exceed 7" in rise 5.complete fire taping at stair stringer level 1 DATE OF INSPECTION 9/5/2024 level 2 1.provide min 42" ht at guardrail 2.room 236 complete firestopping at rated wall 3.room 220 complete firestopping at rated wall 4.room 220 remove paper from sprinkler heads 5.room 220 complete covers on jay boxes 6.provide hammer arrestor at ice maker 7. provide backflow cert for ice maker 8. provide hammer arrestor and air gap at dishwasher 9. room 231 provide tops at window sills 10. room 208 complete fire stopping at rated stair wall at conduits and at beam 11.complets vertical grab bars in ADA stalls as discussed with contractor 12. provide brail signage at ADA stalls

Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/11/2024 1. TCO granted 10 days from todays date 2. ok to occupy as discussed with contractor

Comment Building Div Inspection Partial Pass 9/11/2024 9/11/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/11/2024 1. finished looking at life safety items for TCO

Mechanical Final Inspection Not Ready 9/11/2024 9/11/2024 09/11/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/11/2024
date of inspection 9/11/2024 1. provide final balance report as discussed with contractor at time of next inspection

Plumbing Final Inspection Failed 9/9/2024 9/9/2024 09/13/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 9/9/2024 boiler room 1.provide insulation at copper pipe west side of room 2. complete insulation tape at pipe insulation 3.remove smoke detector cover room 103F 1. adjust hot water temp below 120 degrees room 128 1. provide tag at hose bib (non-potable) room 135 1.provide drain boot at fab lab sink next paint booth room 235 1.repair eye wash station that is leaking room 233 1.complete install of autoclave 2.complete install of dishwasher room 318 1. install ice maker and hammer arrestor room 312 1. complete faucet mottlab

Building Final Inspection Not Ready 9/13/2024 09/13/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 8/4/2024 LEVEL 1 1.guard rail in hallway next to room 126 needs to be min of 42" high 2. complete mono coat in electrical room 126 3.complete fire stop in electrical room126 4. complete mono coat in room 127 5.complete fire stopping in room127 6.complete electrical in ceiling in hall way by fire sprinkler riser room 7.complete fire caulking in room 128 8. complete junction boxes at hot water tanks room 128 9.complete condensate line at mini split in room 128 10. provide back flow certs 11.bottom step of fire sprinkler riser stairs exceeds 7" in rise 12.room 121 complete fire stopping south wall 13.room 120 complete fire stopping 14. complete mono coat 15. room 136 complete top of wall at rated wall 16.room 120 at exterior complete head of wall 17.room 104 at rated stair wall complete fire stopping and complete missing drywall 18.provide brail signage at ADA bathroom 19. complete paper towel holders per ADA at sinks DATE OF INSPECTION 8/5/2024 STAIRS STAIRWELL 2 1.level 0 complete 2 penetration's 2.level one mid landing guardrail needs to min of 42" high 3.level one mid landing guardrail at wall not to exceed 4" clearance at wall 4. complete handrail clearances not to be less than 1 1/2 " at landing turns STAIRWELL 1 1.level 3 top flight of stairs not exceed not exceed 7" in rise 2. complete handrail clearances not to be less than 1 1/2" at landing turns 3. stairs not to exceed 3/8" variance in entire flight of stairs 4. 1st floor bottom step not to exceed 7" in rise 5.complete fire taping at stair stringer level 1 DATE OF INSPECTION 9/5/2024 level 2 1.provide min 42" ht at guardrail 2.room 236 complete firestopping at rated wall 3.room 220 complete firestopping at rated wall 4.room 220 remove paper from sprinkler heads 5.room 220 complete covers on jay boxes 6.provide hammer arrestor at ice maker 7. provide backflow cert for ice maker 8. provide hammer arrestor and air gap at dishwasher 9. room 231 provide tops at window sills 10. room 208 complete fire stopping at rated stair wall at conduits and at beam 11.complets vertical grab bars in ADA stalls as discussed with contractor 12. provide brail signage at ADA stalls

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 9/11/2024 1. TCO granted 10 days from todays date 2. ok to occupy as discussed with contractor

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 9/9/2024 roof inspection 1.provide min clearance at plumbing vent to air intake at AHU 1 2.complete roof screen metal and gate 3.clean construction debris off roof 4.clean construction debris off of tops of AHU's 5. install new ships ladder 6. this is a complete list for building final

Building Final Inspection Not Ready 9/16/2024 9/16/2024 09/16/2024
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
09/11/2024
date of inspection 9/3/2024 inspection of exterior 1.paint gas pipe 2. seal penetration's where gas pipe enters building 3.seal foundation at gas meter where water is flowing 4.provide screens at air intakes and exhaust LEVEL 0 1. provide all final letters 2.complete install of doors at vestibule 3.complete floor transition at interior door at vestibule 4. complete accessible switches at vestibule doors 5.provide ADA signage/ brail at exits 6.provide proper clearance at handrail at gravity lab stairs 7.complete fire stopping at shafts in boiler room 8.Once final letters are on site to review all mechanical will be inspected in boiler room

Other/Miscellaneous
Outstanding
09/11/2024
date of inspection 9/6/2024 level 3 1. room 340 complete fire caulking at fire alarm conduit west wall 2.room 340 complete fire caulking at brace frame 3.room 320 complete fire caulking at south wall 4.room 320 remove painters from sprinkler head 5. room 316 complete window sills 6.room 316 provide hammer arrestor at ice maker 7. room 310 complete window sills 8.room 310 provide info on wave table 9.room 301 complete fire caulking at conduits 10. room 304 complete hose clamp at sink 11. bathroom complete brall signage 12.provide proper clearance at grab bars in ada stall at bathrooms

Other/Miscellaneous
Outstanding
09/16/2024
date of inspection 9/16/2024 1.cancelled by contractor by phone

Building Final Inspection Partial Pass 9/19/2024 9/19/2024 09/19/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 8/4/2024 LEVEL 1 1.guard rail in hallway next to room 126 needs to be min of 42" high 2. complete mono coat in electrical room 126 3.complete fire stop in electrical room126 4. complete mono coat in room 127 5.complete fire stopping in room127 6.complete electrical in ceiling in hall way by fire sprinkler riser room 7.complete fire caulking in room 128 8. complete junction boxes at hot water tanks room 128 9.complete condensate line at mini split in room 128 10. provide back flow certs 11.bottom step of fire sprinkler riser stairs exceeds 7" in rise 12.room 121 complete fire stopping south wall 13.room 120 complete fire stopping 14. complete mono coat 15. room 136 complete top of wall at rated wall 16.room 120 at exterior complete head of wall 17.room 104 at rated stair wall complete fire stopping and complete missing drywall 18.provide brail signage at ADA bathroom 19. complete paper towel holders per ADA at sinks DATE OF INSPECTION 8/5/2024 STAIRS STAIRWELL 2 1.level 0 complete 2 penetration's 2.level one mid landing guardrail needs to min of 42" high 3.level one mid landing guardrail at wall not to exceed 4" clearance at wall 4. complete handrail clearances not to be less than 1 1/2 " at landing turns STAIRWELL 1 1.level 3 top flight of stairs not exceed not exceed 7" in rise 2. complete handrail clearances not to be less than 1 1/2" at landing turns 3. stairs not to exceed 3/8" variance in entire flight of stairs 4. 1st floor bottom step not to exceed 7" in rise 5.complete fire taping at stair stringer level 1 DATE OF INSPECTION 9/5/2024 level 2 1.provide min 42" ht at guardrail 2.room 236 complete firestopping at rated wall 3.room 220 complete firestopping at rated wall 4.room 220 remove paper from sprinkler heads 5.room 220 complete covers on jay boxes 6.provide hammer arrestor at ice maker 7. provide backflow cert for ice maker 8. provide hammer arrestor and air gap at dishwasher 9. room 231 provide tops at window sills 10. room 208 complete fire stopping at rated stair wall at conduits and at beam 11.complets vertical grab bars in ADA stalls as discussed with contractor 12. provide brail signage at ADA stalls

Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/11/2024 1. TCO granted 10 days from todays date 2. ok to occupy as discussed with contractor

Other/Miscellaneous
Carried Forward
09/19/2024
date of inspection 9/9/2024 roof inspection 1.provide min clearance at plumbing vent to air intake at AHU 1 2.complete roof screen metal and gate 3.clean construction debris off roof 4.clean construction debris off of tops of AHU's 5. install new ships ladder 6. this is a complete list for building final

Other/Miscellaneous
Carried Forward
09/19/2024
Exterior of Building 1 ; paint gas pipe next to gas meter. Level 0 - Building corrections complete.(provide special inspection approval for firestopping prior to Building Final) Level 1 - Building corrections complete. Level 2- 1 ; Room 220 complete firestopping at rated wall. (ATS) 2 ; Room 200 complete cover plate at electrical boxes. Level 3 -Building corrections complete. Stairwell 2 - Building corrections complete. Stairwell 1- complete fire tape at stair stringer of Level 1. Roof- 1 ; provide min.10' from plumbing vent to air intake at AHU1. 2 ; complete room screen metal and gate. 3 ; clean construction debris off of roof. 4 , clean construction debris off top of AHU's

Underfloor Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 11/08/2024
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Pre-Construction Building Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Residential Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/22/2023
1. cancelled on site by contractor

Foundation/Rebar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/25/2023
1 ; approved with special inspection approval.( complete dbl. rebar at construction joint as per city approved plans.) 2 ; inspection at level O - East half, level 1 - South half only

Refrigeration Line Test Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
01/11/2024
1.complete insulation on 0 floor as discussed with contractor 2. complete weathering in of building for areas looking for cover

Other/Miscellaneous
Outstanding
01/11/2024
LEVEL 0 1. vapor barrier on south and east wall approved 2.north wall dry out due to water leak not approved LEVEL ONE 1. north west and north wall ok to install vapor barrier LEVEL 2 2.IDF room interior north wall insulation approved LEVEL TREE 1. field equipment room 315 interior east wall insulation approved for top out 2. elevator machine room interior north and south wall insulation approved 3. organic room 314C north exterior wall top out insulation approved 4. organic room 314C and non organic room 314B exterior west wall top out insulation approved

Plumbing Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
02/22/2024
LEVEL ONE 1.hard lid at MECH shaft next to elevator provide listing for rated ceiling not approved 2.custodial room 121 next to MDF room missing return duct R/I approved LEVEL TWO 1. bathroom hard lids approved 2.soffits at southwest end of building approved LEVEL THREE 1.MECH approved for insulation except as noted on city approved plans page M203

Plumbing Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
02/27/2024
1. provide test on DWV at time of next inspection 2. not ready

Mechanical Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
04/23/2024
1 ; complete mineral wool at beam to pan deck. 2 ; complete shaft liner as discussed with contractor. 3 ; contractor will need to verify min. 6'8'' finished ceiling height.( temporary landing and no finished stair treads installed at time of inspection) at stair #2

Frame Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
05/22/2024
1 ; inspection of shaft wall framing at face of elevator of levels - 0-3 only. 2 ; provide special inspection approval report for firestop of penetration at shaft liner. 3 ; provide install instructions for elevator door to complete framing inspection of level 0-3. 4 ; provide fire treated wood or steel backing for electrical boxes. not a complete inspection.

Mechanical Rough In Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Frame Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/07/2024
1. provide install instructions for elevator door from manufacture at time of next inspection 2. provide access to elevator at time of next inspection

Frame Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/29/2024
1 ; complete mineral wool at all fire rated walls on level 3 head of wall as per city approved plans.

Other/Miscellaneous
Outstanding
06/29/2024
date of inspection 6/28/2024 1.fire stopping of elevator shaft approved per special inspection

Frame Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
08/14/2024
inspection of ceiling grid at levels 1-3.( complete all corrections as noted on plans prior to next inspection)

Ceiling Grid/T-Bar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
08/23/2024
1. this was a comment inspection 2. discussed ceiling requirements

Other/Miscellaneous
Outstanding
08/23/2024
inspection date 5/21/2024 1. cancelled on site by contractor

Other/Miscellaneous
Outstanding
08/23/2024
date of inspection 6/20/2024 level one ceilings with clouds and standard grid attached on 4 sides 1.provide tie wires all perimeter bars 2. provide positive attachment at all diffusers 3.complete all firestopping at rated walls 4.complete all wires at light fixtures 5.provide clarification on air returns in corridor 6. provide stenciling at rated walls 7.ok to cover in areas as discussed with contractor

Other/Miscellaneous
Outstanding
08/23/2024
1 ; approved cover in room 236 only. 2 ; provide positive attachment of diffusers to main and cross tee of ceiling. 3 ; complete sprinkler attachment to ceiling. 4 ; complete pipe insulation. 5 ; complete monokote fireproofing at areas discussed with Brandon. 2nd floor rooms not ready at time of inspection.

Other/Miscellaneous
Outstanding
08/23/2024
level 2 ceiling inspection non rated classrooms only -208,207,206,205,204,203,202,201,236,235,234,232,231 - complete corrections as noted on sheets provided to Scott. (A121&A122)

Planning Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Building Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/19/2024
date of inspection 8/4/2024 LEVEL 1 1.guard rail in hallway next to room 126 needs to be min of 42" high 2. complete mono coat in electrical room 126 3.complete fire stop in electrical room126 4. complete mono coat in room 127 5.complete fire stopping in room127 6.complete electrical in ceiling in hall way by fire sprinkler riser room 7.complete fire caulking in room 128 8. complete junction boxes at hot water tanks room 128 9.complete condensate line at mini split in room 128 10. provide back flow certs 11.bottom step of fire sprinkler riser stairs exceeds 7" in rise 12.room 121 complete fire stopping south wall 13.room 120 complete fire stopping 14. complete mono coat 15. room 136 complete top of wall at rated wall 16.room 120 at exterior complete head of wall 17.room 104 at rated stair wall complete fire stopping and complete missing drywall 18.provide brail signage at ADA bathroom 19. complete paper towel holders per ADA at sinks DATE OF INSPECTION 8/5/2024 STAIRS STAIRWELL 2 1.level 0 complete 2 penetration's 2.level one mid landing guardrail needs to min of 42" high 3.level one mid landing guardrail at wall not to exceed 4" clearance at wall 4. complete handrail clearances not to be less than 1 1/2 " at landing turns STAIRWELL 1 1.level 3 top flight of stairs not exceed not exceed 7" in rise 2. complete handrail clearances not to be less than 1 1/2" at landing turns 3. stairs not to exceed 3/8" variance in entire flight of stairs 4. 1st floor bottom step not to exceed 7" in rise 5.complete fire taping at stair stringer level 1 DATE OF INSPECTION 9/5/2024 level 2 1.provide min 42" ht at guardrail 2.room 236 complete firestopping at rated wall 3.room 220 complete firestopping at rated wall 4.room 220 remove paper from sprinkler heads 5.room 220 complete covers on jay boxes 6.provide hammer arrestor at ice maker 7. provide backflow cert for ice maker 8. provide hammer arrestor and air gap at dishwasher 9. room 231 provide tops at window sills 10. room 208 complete fire stopping at rated stair wall at conduits and at beam 11.complets vertical grab bars in ADA stalls as discussed with contractor 12. provide brail signage at ADA stalls

Other/Miscellaneous
Outstanding
09/19/2024
date of inspection 9/11/2024 1. TCO granted 10 days from todays date 2. ok to occupy as discussed with contractor

Other/Miscellaneous
Outstanding
09/19/2024
date of inspection 9/9/2024 roof inspection 1.provide min clearance at plumbing vent to air intake at AHU 1 2.complete roof screen metal and gate 3.clean construction debris off roof 4.clean construction debris off of tops of AHU's 5. install new ships ladder 6. this is a complete list for building final

Other/Miscellaneous
Outstanding
09/19/2024
Exterior of Building 1 ; paint gas pipe next to gas meter. Level 0 - Building corrections complete.(provide special inspection approval for firestopping prior to Building Final) Level 1 - Building corrections complete. Level 2- 1 ; Room 220 complete firestopping at rated wall. (ATS) 2 ; Room 200 complete cover plate at electrical boxes. Level 3 -Building corrections complete. Stairwell 2 - Building corrections complete. Stairwell 1- complete fire tape at stair stringer of Level 1. Roof- 1 ; provide min.10' from plumbing vent to air intake at AHU1. 2 ; complete room screen metal and gate. 3 ; clean construction debris off of roof. 4 , clean construction debris off top of AHU's

Plumbing Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/13/2024
date of inspection 9/9/2024 boiler room 1.provide insulation at copper pipe west side of room 2. complete insulation tape at pipe insulation 3.remove smoke detector cover room 103F 1. adjust hot water temp below 120 degrees room 128 1. provide tag at hose bib (non-potable) room 135 1.provide drain boot at fab lab sink next paint booth room 235 1.repair eye wash station that is leaking room 233 1.complete install of autoclave 2.complete install of dishwasher room 318 1. install ice maker and hammer arrestor room 312 1. complete faucet mottlab

Mechanical Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/11/2024
date of inspection 9/11/2024 1. provide final balance report as discussed with contractor at time of next inspection

Comment Building Div Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/11/2024
date of inspection 9/11/2024 1. finished looking at life safety items for TCO

Mechanical Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Plumbing Final Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
09/06/2024
date of inspection 9/4/2024 1. 2nd floor fab lab paint booth area approved

Comment Building Div Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 11/08/2024
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • A separate permit may be required if fire alarm or sprinkler system is altered • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Standard Conditions
: Development Engineering standard commercial conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** - Occupancy will not be granted until all civil work associated with PRCCP20220770 has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20220770 for approved method of control. - Stormwater control of roof downspouts required. See approved civil plan PRCCP20220770 - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Engineering Division Prior to Issuance
: All review complete. The site plan must be compaired to the civil site plan before issuance. Verified on 11/28/2022 LL Civil permit PRCCP20220770 must be issued first. LL 08/18/2022
Miscellaneous Condition Resolved Engineering Division Prior to Occupancy
: All work associated with civil permit PRCCP20220770 must be completed and approved prior to occupancy. LL 08/18/2022

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20220770 Permit(s) Issued Civil Construction Permit
PRFS20230673 Closed Fire Sprinklers
PRFA20230879 Closed Fire Alarms
PRFA20230910 Canceled Fire Alarms
PRDK20240314 Permit(s) Issued Deck/Porch/Patio
PRFA20240386 Closed Fire Alarms
PLPRE20210007 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
01/03/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/03/2024 Report Inspection Report (Frame Inspection)
01/03/2024 Report Inspection Report (Plumbing Rough In Inspection)
01/03/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/04/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/04/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/08/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/08/2024 Report Inspection Report (Frame Inspection)
01/08/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/09/2023 Report Inspection Report (Erosion And Sediment Inspection)
01/09/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/09/2024 Report Inspection Report (Frame Inspection)
01/09/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/10/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/10/2024 Report Inspection Report (Frame Inspection)
01/10/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/11/2023 Report Inspection Report (Pre-Construction Building Inspection)
01/11/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/11/2024 Report Inspection Report (Frame Inspection)
01/11/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/12/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/16/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/18/2024 Report Inspection Report (Frame Inspection)
01/18/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/22/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/22/2024 Report Inspection Report (Frame Inspection)
01/22/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/22/2024 Special inspection report for intumescent paint at structural columns
01/23/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/23/2024 Report Inspection Report (Frame Inspection)
01/23/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/24/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/24/2024 Report Inspection Report (Frame Inspection)
01/24/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/25/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/25/2024 Report Inspection Report (Mechanical Rough In Inspection)
01/26/2024 Report Inspection Report (Mechanical Rough In Inspection)
01/27/2023 Report Inspection Report (Footing/Setback Inspection)
01/29/2024 Report Inspection Report (Frame Inspection)
01/29/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/30/2024 Report Inspection Report (Energy (Insulation) Inspection)
01/30/2024 Report Inspection Report (Frame Inspection)
01/30/2024 Report Inspection Report (Wallboard / Drywall Inspection)
01/31/2024 Report Inspection Report (Frame Inspection)
01/31/2024 Report Inspection Report (Plumbing Rough In Inspection)
01/31/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/01/2023 PRCNC20221036 Pierce STEM - Permit to IFC Structural Revision Set
02/01/2024 Report Inspection Report (Frame Inspection)
02/01/2024 Report Inspection Report (Plumbing Rough In Inspection)
02/01/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/02/2023 Report Inspection Report (Footing/Setback Inspection)
02/06/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/06/2024 Report Inspection Report (Frame Inspection)
02/07/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/07/2024 Report Inspection Report (Frame Inspection)
02/07/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/08/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/10/2023 Report Inspection Report (Footing/Setback Inspection)
02/10/2023 Zone 3 footing special inspection approval
02/12/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/12/2024 Report Inspection Report (Frame Inspection)
02/12/2024 Report Inspection Report (Mechanical Rough In Inspection)
02/12/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/13/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/13/2024 Report Inspection Report (Frame Inspection)
02/13/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/14/2024 Report Inspection Report (Frame Inspection)
02/14/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/15/2024 Report Inspection Report (Frame Inspection)
02/15/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/17/2023 Report Inspection Report (Footing/Setback Inspection)
02/20/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/21/2024 Report Inspection Report (Energy (Insulation) Inspection)
02/21/2024 Report Inspection Report (Frame Inspection)
02/21/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/22/2024 Report Inspection Report (Frame Inspection)
02/22/2024 Report Inspection Report (Mechanical Rough In Inspection)
02/22/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/23/2023 Report Inspection Report (Foundation/Rebar Inspection)
02/23/2023 Report Inspection Report (Foundation/Rebar Inspection)
02/24/2023 Report Inspection Report (Foundation/Rebar Inspection)
02/26/2024 Report Inspection Report (Frame Inspection)
02/26/2024 Report Inspection Report (Plumbing Rough In Inspection)
02/26/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/27/2024 Report Inspection Report (Plumbing Rough In Inspection)
02/28/2024 Report Inspection Report (Frame Inspection)
02/28/2024 Report Inspection Report (Wallboard / Drywall Inspection)
02/29/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/01/2023 image
03/01/2024 Report Inspection Report (Frame Inspection)
03/04/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/04/2024 Report Inspection Report (Frame Inspection)
03/04/2024 Report Inspection Report (Mechanical Rough In Inspection)
03/04/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/05/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/06/2023 Report Inspection Report (Comment Building Div Inspection)
03/06/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/06/2024 Report Inspection Report (Frame Inspection)
03/06/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/07/2024 Report Inspection Report (Frame Inspection)
03/08/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/11/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/12/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/12/2024 Report Inspection Report (Frame Inspection)
03/12/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/14/2024 Report Inspection Report (Frame Inspection)
03/14/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/15/2023 Report Inspection Report (Footing/Setback Inspection)
03/15/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/15/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/15/2024 Report Inspection Report (Frame Inspection)
03/15/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/19/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/19/2024 Report Inspection Report (Frame Inspection)
03/19/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/20/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/20/2024 Report Inspection Report (Frame Inspection)
03/20/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/21/2023 Report Inspection Report (Comment Building Div Inspection)
03/21/2023 Report Inspection Report (Energy (Insulation) Inspection)
03/21/2023 Report Inspection Report (Mechanical Rough In Inspection)
03/21/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/22/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/22/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/27/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/27/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
03/27/2024 Report Inspection Report (Frame Inspection)
03/27/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/28/2023 Report Inspection Report (Energy (Insulation) Inspection)
03/28/2024 Report Inspection Report (Frame Inspection)
03/28/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/29/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/29/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/29/2024 Report Inspection Report (Energy (Insulation) Inspection)
03/29/2024 Report Inspection Report (Frame Inspection)
03/29/2024 Report Inspection Report (Wallboard / Drywall Inspection)
03/30/2023 Report Inspection Report (Plumbing Below Slab Inspection)
04/02/2024 Report Inspection Report (Frame Inspection)
04/02/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/03/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/03/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/04/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/04/2024 Report Inspection Report (Frame Inspection)
04/04/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/08/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/08/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/09/2024 Report Inspection Report (Energy (Insulation) Inspection)
04/09/2024 Report Inspection Report (Frame Inspection)
04/09/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/11/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/12/2023 Report Inspection Report (Energy (Insulation) Inspection)
04/12/2023 Report Inspection Report (Plumbing Below Slab Inspection)
04/16/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
04/17/2024 Report Inspection Report (Mechanical Rough In Inspection)
04/17/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/19/2024 Report Inspection Report (Frame Inspection)
04/19/2024 Report Inspection Report (Frame Inspection)
04/19/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/20/2023 Report Inspection Report (Footing/Setback Inspection)
04/20/2023 Report Inspection Report (Foundation/Rebar Inspection)
04/21/2023 Letter Permit Review Correction Letter
04/23/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/23/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/24/2024 Report Inspection Report (Frame Inspection)
04/25/2023 Report Inspection Report (Energy (Insulation) Inspection)
04/25/2024 Report Inspection Report (Frame Inspection)
04/25/2024 Report Inspection Report (Wallboard / Drywall Inspection)
04/26/2024 Report Inspection Report (Frame Inspection)
04/26/2024 Report Inspection Report (Frame Inspection)
04/30/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/01/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/03/2023 Report Inspection Report (Foundation/Rebar Inspection)
05/04/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/04/2024 Report Inspection Report (Frame Inspection)
05/04/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/05/2023 Report Inspection Report (Energy (Insulation) Inspection)
05/07/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/08/2024 Report Inspection Report (Frame Inspection)
05/09/2023 Report Inspection Report (Plumbing Below Slab Inspection)
05/09/2023 Report Inspection Report (Slab/Insulation Inspection)
05/10/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/10/2024 Report Inspection Report (Frame Inspection)
05/13/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/15/2023 Report Inspection Report (Slab/Insulation Inspection)
05/16/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/16/2024 Report Inspection Report (Frame Inspection)
05/16/2024 Report Inspection Report (Frame Inspection)
05/16/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/16/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/17/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/21/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/21/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/22/2024 Report Inspection Report (Frame Inspection)
05/22/2024 Report Inspection Report (Wallboard / Drywall Inspection)
05/23/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/23/2024 Report Inspection Report (Gas Test Inspection)
05/24/2024 Report Inspection Report (Energy (Insulation) Inspection)
05/30/2023 Report Inspection Report (Footing/Setback Inspection)
06/05/2024 Report Inspection Report (Mechanical Rough In Inspection)
06/07/2024 Report Inspection Report (Frame Inspection)
06/10/2024 Report Inspection Report (Frame Inspection)
06/11/2024 Report Inspection Report (Energy (Insulation) Inspection)
06/12/2024 Report Inspection Report (Energy (Insulation) Inspection)
06/15/2024 Report Inspection Report (Foundation/Rebar Inspection)
06/17/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/18/2024 Report Inspection Report (Wallboard / Drywall Inspection)
06/20/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/21/2024 Report Inspection Report (Frame Inspection)
06/25/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/02/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/18/2023 Form Building Permit set VS Currect Set Comparison
07/23/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/24/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
07/29/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/08/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/22/2023 Report Inspection Report (Slab/Insulation Inspection)
08/23/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/25/2023 Plans PC STEM IFC REVISION - RESUB (Stamped)
08/26/2023 Receipt Receipt for transaction:2023-001635
08/29/2023 Report Inspection Report (Slab/Insulation Inspection)
08/29/2023 Special inspection report for level 2 deck south
09/03/2024 Report Inspection Report (Plumbing Final Inspection)
09/04/2024 Report Inspection Report (Building Final Inspection)
09/04/2024 Report Inspection Report (Mechanical Final Inspection)
09/06/2024 Report Inspection Report (Building Final Inspection)
09/06/2024 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
09/09/2022 Letter Permit Review Comment Notice
09/09/2022 Form PIERCE STEM - Building Permit Application_220631 (Flattened)
09/09/2022 Report PIERCE STEM - ControlAreaList1 (Flattened)
09/09/2022 Other PIERCE STEM - Design Addendum Geotech Report No 3 (Flattened)
09/09/2022 Other PIERCE STEM - Design Study Final Geotech Report1 (Flattened)
09/09/2022 Other PIERCE STEM - Early Submittal Waiver 20220213 (Flattened)
09/09/2022 Other PIERCE STEM - Traffic Scoping Worksheet - TENW_220629 (Flattened)
09/10/2024 Report Inspection Report (Engineering Final Inspection)
09/11/2024 Report Inspection Report (Building Final Inspection)
09/11/2024 Report Inspection Report (Building Final Inspection)
09/11/2024 Report Inspection Report (Comment Building Div Inspection)
09/11/2024 Report Inspection Report (Comment Building Div Inspection)
09/11/2024 Report Inspection Report (Mechanical Final Inspection)
09/11/2024 Report Inspection Report (Mechanical Final Inspection)
09/13/2024 Report Inspection Report (Building Final Inspection)
09/13/2024 Report Inspection Report (Plumbing Final Inspection)
09/14/2023 Report Inspection Report (Slab/Insulation Inspection)
09/16/2024 Report Inspection Report (Building Final Inspection)
09/19/2023 Report Inspection Report (Foundation/Rebar Inspection)
09/19/2023 Report Inspection Report (Slab/Insulation Inspection)
09/19/2024 Report Inspection Report (Building Final Inspection)
09/22/2023 Report Inspection Report (Slab/Insulation Inspection)
09/25/2023 Report Inspection Report (Comment Building Div Inspection)
09/25/2023 Report Inspection Report (Frame Inspection)
09/29/2022 Other 20220928 master plan standards memo
09/29/2022 Other Pierce STEM Arborist Report 20220128
09/29/2022 Other Pierce STEM Arborist Response 20220721
09/29/2022 Other Pierce STEM building permit correction response checklist
09/29/2022 Report Pierce STEM HMIS 09192022
09/29/2022 Receipt Receipt for transaction:2022-001935
10/06/2023 Report Inspection Report (Frame Inspection)
10/11/2023 Report Inspection Report (Footing/Setback Inspection)
10/11/2023 Report Inspection Report (Frame Inspection)
10/11/2023 Report Inspection Report (Frame Inspection)
10/11/2023 Report Inspection Report (Wallboard / Drywall Inspection)
10/11/2023 Special inspection report for framing
10/11/2023 Special inspection report for generator pad
10/15/2024 Letter Permit Expiration Notice
10/23/2023 Report Inspection Report (Frame Inspection)
10/23/2023 Report Inspection Report (Mechanical Rough In Inspection)
10/23/2023 Report Inspection Report (Slab/Insulation Inspection)
10/25/2023 Report Inspection Report (Wallboard / Drywall Inspection)
10/26/2023 Report Inspection Report (Frame Inspection)
10/26/2023 Report Inspection Report (Frame Inspection)
11/02/2023 Report Inspection Report (Wallboard / Drywall Inspection)
11/03/2023 Report Inspection Report (Plumbing Rough In Inspection)
11/06/2023 Report Inspection Report (Energy (Insulation) Inspection)
11/06/2023 Report Inspection Report (Frame Inspection)
11/08/2022 Letter Permit Review Comment Notice
11/08/2022 Other Pierce STEM Archaeological Site Survey 20220111 (Flattened)
11/08/2022 Other Pierce STEM Cultural Resource Correspondence (Flattened)
11/08/2022 Form Pierce STEM resubmittal form 20220929 (Flattened)
11/08/2023 Report Inspection Report (Energy (Insulation) Inspection)
11/08/2023 Report Inspection Report (Frame Inspection)
11/08/2024 Report Inspection Report (Building Final Inspection)
11/09/2023 Report Inspection Report (Comment Building Div Inspection)
11/16/2023 Report Inspection Report (Energy (Insulation) Inspection)
11/16/2023 Report Inspection Report (Frame Inspection)
11/17/2022 Other Pierce STEM lot combination correspondence
11/21/2023 Report Inspection Report (Exhaust/Vent Fans Inspection)
11/21/2023 Report Inspection Report (Mechanical Rough In Inspection)
11/21/2023 Report Inspection Report (Wallboard / Drywall Inspection)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Envelope_Compliance_Report (Stamped)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Envelope_Requirements_List (Stamped)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Lighting_Compliance_Report (Stamped)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Lighting_Requirements_List (Stamped)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Mechanical_Compliance_Report (Stamped)
11/22/2022 Form PIERCE STEM - 2018_WSEC_Project_Mechanical_Requirements_List (Stamped)
11/22/2022 Plans PIERCE STEM - DRAWING SET - BUILDING PERMIT (Stamped)
11/22/2022 Form PIERCE STEM - Plumbing fixture worksheet (Stamped)
11/22/2022 Plans PIERCE STEM - SITE PLAN - BUILDING PERMIT (Stamped)
11/22/2022 Report PIERCE STEM - Structural Calculations Volume 1 (Stamped)
11/22/2022 Report PIERCE STEM - Structural Calculations Volume 2 (Stamped)
11/22/2022 Form Pierce STEM resubmittal form 20221117 (Flattened)
11/28/2023 Report Inspection Report (Mechanical Rough In Inspection)
11/28/2023 Report Inspection Report (Refrigeration Line Test Inspection)
11/29/2022 Permit Permit - Detailed
11/29/2022 Letter Permit Job Card
11/29/2022 Receipt Receipt for transaction: 2022-002352
11/29/2023 Report Inspection Report (Energy (Insulation) Inspection)
11/30/2023 Report Inspection Report (Energy (Insulation) Inspection)
11/30/2023 Report Inspection Report (Frame Inspection)
11/30/2023 Report Inspection Report (Mechanical Rough In Inspection)
11/30/2023 Report Inspection Report (Plumbing Rough In Inspection)
11/30/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/01/2023 Report Inspection Report (Plumbing Rough In Inspection)
12/06/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/06/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/08/2023 Report Inspection Report (Frame Inspection)
12/08/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/11/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/13/2023 Report Inspection Report (Frame Inspection)
12/13/2023 Report Inspection Report (Plumbing Rough In Inspection)
12/13/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/14/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/14/2023 Report Inspection Report (Plumbing Rough In Inspection)
12/18/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/18/2023 Report Inspection Report (Firewall/Firestop Inspection)
12/19/2023 Report Inspection Report (Frame Inspection)
12/19/2023 Report Inspection Report (Wallboard / Drywall Inspection)
12/21/2023 Report Inspection Report (Frame Inspection)
12/21/2023 Report Inspection Report (Mechanical Rough In Inspection)
12/28/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/28/2023 Report Inspection Report (Energy (Insulation) Inspection)
12/28/2023 Report Inspection Report (Frame Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.