Summary

PRFI20240124
Fire Construction Permit
Ready for Issuance
H&H PUYALLUP LLC
New
Construction of an ARCO ampm gas station facility. Included in this permit is the installation of one (1) 25,000 gallon underground storage tank (UST) for regular unleaded and one (1) 22,000 gallon UST split tank for premium and diesel fuel.
01/23/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 02/22/2024 02/22/2024
Planning Review Approved 02/22/2024 02/22/2024
Fire Review Approved 02/22/2024 02/21/2024
Engineering Review Approved 02/22/2024 02/21/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Plan Review Fee $265.00 $265.00 Paid 01/24/2024
Outstanding Fees Amount Paid Owing Date Paid
Fire Code Permit Fee $390.00 $0.00 $390.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$390.00    Add Fees to My Cart

Inspections

There are no inspections for this development permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCP20231423 has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20231423 for approved method of control. - Steps shall be taken to prevent drainage onto adjacent lots. - The applicant is responsible to schedule all utility inspections prior to backfilling. - Curb, gutter, sidewalk and approach must be poured per city standards. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way or civil construction permit. - Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
Stormwater Maintenance Agreement (SWA) Open Engineering Division Prior to Completion
: The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Miscellaneous Condition Open Engineering Division Prior to Issuance
: Building permit PRCNC20231424 cannot be issued until a demolition permit is issued first to demolish the existing structures as proposed on the plans. [Yianni Charitou @ 12/28/2023 8:24 AM]
Miscellaneous Condition Open Engineering Division Prior to Issuance
: Building permit PRFI20240124 cannot be issued until civil permit PRCCP20231423 is issued first. Since the building permit cannot be issued until civil construction permit PRCCP20231423 is issued first and the building plans must match the approved civil plans, please coordinate your final building permit submittal with the approval of the civil permit to avoid redundant or surplus building permit submittals. [Yianni Charitou @ 01/22/2024 4:20 PM] [Yianni Charitou @ 02/21/2024 7:24 AM]
Fire Review Conditions Open Development & Permitting Services Standard Conditions
: Comply with 2018 IFC IBC and NFPA codes and standards. Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Ready to Issue - Need Business License Endorsement Open Development & Permitting Services Prior to Issuance
: Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Contractor Info Open Development & Permitting Services Prior to Issuance
: Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20231423 Returned for Correction Civil Construction Permit
PRCNC20231424 Returned for Correction Commercial - New Construction
PRGR20231482 Returned for Correction Clear, Fill, & Grade Permit
PRRWF20231581 Ready for Issuance Retaining Wall
PRCNC20240007 Returned for Correction Commercial - New Construction
PRCNC20240010 Returned for Correction Commercial - New Construction
PRCNC20240013 Returned for Correction Commercial - New Construction
P-21-0059 File Closed Pre-Application
PLPSP20220079 Waiting for Conditions Preliminary Site Plan