Permit Application Status
PRPF20230347
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $1,273.75 | $1,273.75 | Paid | 08/02/2023 |
Building Plan Review Fee | $827.94 | $827.94 | Paid | 04/03/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 08/02/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/31/2023 |
Traffic Impact Fee (Commercial) | $4,050.00 | $4,050.00 | Paid | 08/02/2023 |
Park Impact Fee (Manufacturing) | $4,338.69 | $4,338.69 | Paid | 08/02/2023 |
$0.00
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $10,695.38 | $10,695.38 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Footing/Setback Inspection | Not Ready | 11/30/2023 | 11/30/2023 | 11/30/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
05/24/2024
|
||||
Other/Miscellaneous
Resolved
05/24/2024
1. provide special inspection approval for bar placement
2.provide geotech reports for sub grades at footings from geotech of record
3.provide detailed drawings from EOR for corner footing being used that are not on the plans
4. complete F5 footings as approved on city approved
5.due not pour
6. not ready
|
||||
Manufactured Or Modular Structure Setup | Failed | 12/1/2023 | 12/1/2023 | 12/01/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
05/24/2024
1. contractor continued with work without city approval see footing inspection with date of 11/30/2023 for corrections
|
||||
Footing/Setback Inspection | Not Ready | 12/4/2023 | 12/4/2023 | 12/04/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
05/24/2024
|
||||
Other/Miscellaneous
Resolved
05/24/2024
1. provide special inspection approval for bar placement
2.provide geotech reports for sub grades at footings from geotech of record
3.provide detailed drawings from EOR for corner footing being used that are not on the plans
4. complete F5 footings as approved on city approved
5.due not pour
6. not ready
|
||||
Other/Miscellaneous
Resolved
05/24/2024
1. provide geotech report that supports all areas that support footing, referencing min soil Bearing as on city approved plans as discussed with contractor
2.provide approval letter from engineer of record for corner pads used that where not on city approved plans
3. provide letter from engineer of record on the 18" footing depth approval on the F5 footing that was poured on site (24" was what was approved on city approved plan)
|
||||
Footing/Setback Inspection | Not Ready | 12/20/2023 | 12/20/2023 | 12/20/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
05/24/2024
|
||||
Other/Miscellaneous
Resolved
12/20/2023
1. provide special inspection approval for bar placement
2.provide geotech reports for sub grades at footings from geotech of record
3.provide detailed drawings from EOR for corner footing being used that are not on the plans
4. complete F5 footings as approved on city approved
5.due not pour
6. not ready
|
||||
Other/Miscellaneous
Resolved
05/24/2024
1. provide geotech report that supports all areas that support footing, referencing min soil Bearing as on city approved plans as discussed with contractor
2.provide approval letter from engineer of record for corner pads used that where not on city approved plans
3. provide letter from engineer of record on the 18" footing depth approval on the F5 footing that was poured on site (24" was what was approved on city approved plan)
|
||||
Other/Miscellaneous
Resolved
05/24/2024
1. provide EOR approval for bar size for tension tie as discussed with contractor
2. provide min clearance from bar to forms per city approved plans
3. provide special inspection reports for structural steel placement
4.provide clarification for bar size on cross bars
5. not ready do not pour
|
||||
Building Final Inspection | Failed | 5/7/2024 | 5/7/2024 | 05/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
05/24/2024
1. framing and insulation was covered up without inspection
2. accessible route exceeds side slope requirements and has obstructions with in the route
3. not a complete list
|
||||
Planning Final Inspection | VOID | 5/7/2024 | 05/08/2024 | |
Nabila Comstock ((253) 770-3361) | ||||
Building Final Inspection | Not Ready | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/09/2024
1. framing and insulation was covered up without inspection
2. accessible route exceeds side slope requirements and has obstructions with in the route
3. not a complete list
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
1. provide special inspection reports for framing as discussed with contractor
2.provide final letter fro EOR
3.provide air testing report
4. provide clarification on accessible route from architect
|
||||
Plumbing Rough In Inspection | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Residential Final Inspection | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Manufactured Or Modular Structure Setup | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Outstanding
12/01/2023
1. contractor continued with work without city approval see footing inspection with date of 11/30/2023 for corrections
|
||||
Mechanical Rough In Inspection | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Mechanical Final Inspection | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Footing/Setback Inspection | VOID | 05/24/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Outstanding
12/20/2023
|
||||
Other/Miscellaneous
Outstanding
12/20/2023
1. provide EOR approval for bar size for tension tie as discussed with contractor
2. provide min clearance from bar to forms per city approved plans
3. provide special inspection reports for structural steel placement
4.provide clarification for bar size on cross bars
5. not ready do not pour
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Miscellaneous Condition | Resolved | Planning Division | Prior to Issuance | ||
:
Building permit cannot be issued until the SEPA determination has been issued (PLSSP20230037) and the civil permit application (PRCCP20230336) has been approved
|
|||||
Miscellaneous Condition | Resolved | Building Division | Prior to Issuance | ||
:
PRCCP20230336 hold for civil permit issuance
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20230336 for specifications **
** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20230336 for specifications **
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCP20230336 has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXX for approved method of control.
- Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow.
- All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District.
- Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection.
- Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
(For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums.
(For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade).
- Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)).
- If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities.
- No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
- Steps shall be taken to prevent drainage onto adjacent lots.
- No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Prior to Occupancy | ||
:
Occupancy will not be granted until all work associated with civil permit PRCCP20230336 has been completed and a final inspection granted. LL 08/09/2023
|
Reference Number | Status | Type |
---|---|---|
B-09-0688 | Closed | Commercial - New Construction |
PRHM20230009 | Closed | Hydraulic Modeling |
PRCCP20230336 | Permit(s) Issued | Civil Construction Permit |
PRMH20230349 | Closed | Mechanical - COMMERCIAL ONLY |
PRPF20231137 | Permit(s) Issued | Pre-Fabricated Building |
PRFS20240156 | Closed | Fire Sprinklers |
PRCTI20240571 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFA20240641 | Closed | Fire Alarms |
P-21-0021 | File Closed | Pre-Application |
PLSSP20230037 | File Closed | SEPA Standalone |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.