CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRPF20231137
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $593.25 | $593.25 | Paid | 09/08/2023 |
Building Plan Review Fee | $385.61 | $385.61 | Paid | 08/02/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 09/08/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 08/29/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $1,183.86 | $1,183.86 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Residential Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Manufactured Or Modular Structure Setup | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Manufactured Or Modular Structure Setup | Partial Pass | 11/13/2023 | 11/13/2023 | 11/13/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Engineering Final Inspection | Failed | 12/22/2023 | 12/22/2023 | 12/22/2023 |
Jeff Hill ((253) 204-5633) | ||||
Building Final Inspection | Failed | 12/22/2023 | 12/22/2023 | 12/22/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
12/22/2023
final pending engineering final.
|
||||
Planning Final Inspection | VOID | 12/22/2023 | 12/22/2023 | |
Nabila Comstock ((253) 770-3361) | ||||
Planning Final Inspection | VOID | 12/22/2023 | ||
Nabila Comstock ((253) 770-3361) | ||||
Engineering Final Inspection | Failed | 1/30/2024 | 1/30/2024 | 01/30/2024 |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
01/30/2024
install splash block per city standard 02.05.05
|
||||
Building Final Inspection | VOID | 12/17/2024 | ||
CityView System Manger |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20230336 for specifications **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20230336 for specifications **
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXX for approved method of control.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
|
|||||
Fire Review Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
6.Fire access must be provided and maintained per building and fire codes.
|
Reference Number | Status | Type |
---|---|---|
B-09-0688 | Closed | Commercial - New Construction |
PRHM20230009 | Closed | Hydraulic Modeling |
PRCCP20230336 | Closed | Civil Construction Permit |
PRPF20230347 | Closed | Pre-Fabricated Building |
PRMH20230349 | Closed | Mechanical - COMMERCIAL ONLY |
PRFS20240156 | Closed | Fire Sprinklers |
PRCTI20240571 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFA20240641 | Closed | Fire Alarms |
P-21-0021 | File Closed | Pre-Application |
PLSSP20230037 | File Closed | SEPA Standalone |
Date Uploaded | File Type | Name |
---|---|---|
01/30/2024 | Report | Inspection Report (Engineering Final Inspection) |
02/05/2024 | Report | Inspection Report (Engineering Final Inspection) |
08/01/2023 | Form | Building Permit Application-CIMCO SHED |
08/01/2023 | Other | Cimco letter 8-1-2023 |
08/01/2023 | Letter | Incomplete Application Notice |
08/02/2023 | Other | CIMCO_InterAve_RG |
08/02/2023 | Receipt | Receipt for transaction:2023-001484 |
08/17/2023 | Letter | Permit Review Correction Letter |
08/29/2023 | Receipt | Receipt for transaction:2023-001661 |
09/08/2023 | Plans | CONSTRUCTION PLAN SET (Stamped) |
09/08/2023 | Letter | Permit - Detailed |
09/08/2023 | Receipt | Receipt for transaction:2023-001743 |
09/08/2023 | Plans | SITE PLAN (Stamped) |
09/08/2023 | Report | STRUCTURAL CALS (Stamped) |
09/25/2023 | Letter | Permit Job Card |
11/07/2024 | Letter | Permit Expiration Notice |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.