Permit Application Status
PRPF20241042
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $251.25 | $251.25 | Paid | 11/06/2024 |
Building Plan Review Fee | $163.31 | $163.31 | Paid | 07/03/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 11/06/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 10/09/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $619.56 | $619.56 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Plumbing Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Manufactured Or Modular Structure Setup | Not Ready | 12/12/2024 | 12/12/2024 | 12/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
12/12/2024
provide e&s prior to setup inspection
|
||||
Manufactured Or Modular Structure Setup | Failed | 12/13/2024 | 12/13/2024 | 12/13/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
12/13/2024
1:complete seismic straps, hardware install and spacing as per approved plan.
2:remove skirting where seismic straps are located
3:will need access doors at final. secure shims as discussed
|
||||
Building Final Inspection | Partial Pass | 1/3/2025 | 1/3/2025 | 01/03/2025 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
01/03/2025
provide access doors in skirting, paint skirting and install splash blocks.
TCO OK FOR 30 DAYS FROM THIS DAY, with fire, planning and engineering ok
|
||||
Fire Final Inspection | Partial Pass | 1/3/2025 | 1/3/2025 | 01/03/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Other/Miscellaneous
Outstanding
01/03/2025
TCO approved - 30 Days. Subject to Building Inspection.
See FA permits
|
||||
Planning Final Inspection | VOID | 1/2/2025 | 01/14/2025 | |
Rachael N. Brown ((253) 770-3363) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
• A minimum of one 2a-10bc fire extinguisher is required in each room
• A fire alarm system is required
• A separate permit is required for fire alarm
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake ddrake@puyallupwa.gov
|
|||||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Resolved | Engineering Division | Prior to Issuance | ||
:
CONDITION RESOLVED: Building valuation does not exceed $200,000, therefore frontage improvements are not required. [Adam Hunt @ 09/17/2024 4:10 PM]
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a civil permit issued. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved. You can initiate the civil permit by completing and submitting an application found here: https://www.cityofpuyallup.org/450/Permits-and-Applications.
|
|||||
Miscellaneous Condition | Open | Traffic Division | Standard Conditions | ||
:
Prior to occupancy, all CUP conditions related to the 1-year pilot temporary closure must be completed:
School District will be required to submit a detailed temporary roadway closure plan to be reviewed/approved by the City prior to executing the 1-year pilot temporary roadway closure. The roadway closure will include the following items but are not limited to:
• Clearly identify the extent of the proposed roadway closure including any channelization devices and MUTCD compliant signage. Roadway closure plan must be reviewed/approved by the City prior to implementing temporary roadway closure.
• Coordinate with emergency services for gate placement. AutoTurn analysis may be required.
• Temporary closure shall utilize MUTCD compliant gates. Gates shall be fully retrorefectorized on both sides with vertical stripes alternately red and white at 16-inch intervals measured horizontally. This guidance comes directly from the MUTCD (Section 2B.68). Recommend installing end of roadway object markers (OM4-1) similar to the City’s Type III Barricade standard (01.01.21). The bottom of the retroreflectorized area shall be located 3.5 to 4.5 feet above the roadway surface.
• Gates are required to have KNOX locks for emergency access.
• Temporary/permanent design considerations to allow bicycle movements on 7th St NW as described in the Active Transportation Plan.
• In accordance with MUTCD, signage for extended duration traffic control are required to be post mounted..
• Verify SSD, sign legibility distance for vehicles approaching the temporary closure.
• District will need to provide a detailed notification plan for residents that will be impacted by the temporary closure.
• School district will be required to obtain a City ROW permit for the duration of the temporary closure. This permit will include required insurance/bonding and will expire at the end of the 1-year pilot period.
• Other than for Emergency access & City maintenance vehicles, the closure area will fully restricted to motorized vehicular traffic for the duration of 1-year pilot program.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Issuance | ||
:
Building permit PRPF20241042, PRPF20241043, and PRPF20241044 shall not be issued until a lot combination permit has been issued as specified in the conditional use permit.
|
|||||
Miscellaneous Condition | Resolved | Planning Division | Prior to Issuance | 08/20/2024 | |
:
CUP Appeal Period; permit cannot be issued until CUP approval #PLCUP20230109 appeal period passes without appeal. Appeal period ends 8/20/2024.
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
- Occupancy will not be granted until all civil work associated with PRCCP20241123 has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCP20241123 for approved method of control.
- Stormwater control of roof downspouts required.
- Curb, gutter, sidewalk and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
- If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities.
- No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
- Steps shall be taken to prevent drainage onto adjacent lots.
|
|||||
Stormwater Maintenance Agreement (SWA) | Open | Engineering Division | Prior to Occupancy | ||
:
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Issuance | ||
:
Building permit PRPF20241042 shall not be issued until civil permit PRCCP20241123 is issued first.
|
|||||
Ready to Issue - Need Business License Endorsement | Resolved | Development & Permitting Services | Prior to Issuance | ||
:
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
RECEIVED 11.12.24 SEE ATTACHED EMAIL-JF
|
Reference Number | Status | Type |
---|---|---|
PRPF20241043 | Permit(s) Issued | Pre-Fabricated Building |
PRPF20241044 | Permit(s) Issued | Pre-Fabricated Building |
PRROW20241104 | Permit(s) Issued | Right-of-Way Permit |
PRCCP20241123 | Permit(s) Issued | Civil Construction Permit |
PRFA20241763 | Permit(s) Issued | Fire Alarms |
PRFA20241766 | Permit(s) Issued | Fire Alarms |
PRFA20241767 | Permit(s) Issued | Fire Alarms |
PROLP20241838 | Canceled | Oversized Load/House Move Permit |
PLCUP20230109 | File Closed | Conditional Use Permit |
PLLC20240058 | File Closed | Lot Combination |
Date Uploaded | File Type | Name |
---|---|---|
01/02/2025 | Report | Inspection Report (Engineering Final Inspection) |
07/03/2024 | Receipt | Receipt for transaction:2024-001385 |
08/01/2024 | Letter | Permit Review Correction Letter |
10/09/2024 | Receipt | Receipt for transaction:2024-002118 |
10/21/2024 | Report | SWPPP - (Stamped) |
10/21/2024 | Other | City of Puyallup Stormwater Agreement (Stamped) |
10/21/2024 | Plans | CONSTRUCTION PLAN SET - (Stamped) |
10/21/2024 | Other | Ken Cook - Stormwater Maintenance agreement email (Stamped) |
10/21/2024 | Other | PHS Portables Stormwater O&M Manual (Stamped) |
10/21/2024 | Plans | SITE PLAN - (Stamped) |
10/21/2024 | Report | STRUCTURAL CALCS - BLDG FOUNDATION (Stamped) |
10/21/2024 | Form | WESC Worksheets-Letter (Stamped) |
11/06/2024 | Receipt | Receipt for transaction:2024-002319 |
11/12/2024 | Permit | Permit - Detailed |
11/12/2024 | Letter | Permit Job Card |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.