Permit Application Status
PRDE20250395
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee (Demolition) | $2,673.75 | $2,673.75 | Paid | 03/24/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Demo Sewer Service Fee | $30.00 | $0.00 | $30.00 | Not Paid |
Water Service Removal for Demo (at meter) Fee | $200.00 | $0.00 | $200.00 | Not Paid |
Totals: | $2,903.75 | $2,673.75 | $230.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$230.00 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Demolition Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard demolition conditions:
1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work.
2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law.
Site-specific Conditions:
- The applicant shall cut and cap the Building 02-Library sanitary sewer lateral at or just upstream of the existing sewer lift station under the supervision of a City Inspector, prior to any demolition. The existing sewer lateral shall not be reused. The applicant shall request an inspection through the CityView portal. Utility inspections are required prior to backfilling.
- The applicant shall cut and cap the water line near the property line, under the supervision of a City Inspector, prior to any demolition. The applicant shall request an inspection through the CityView portal. Prior to cutting and capping the water line at the property line, the contractor and applicant shall verify that cutting the line as proposed will not negatively impact any water services downstream that are used to serve other buildings.
I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
||
Ready to Issue - Need Contractor Info | Open | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Development & Permitting Services
Puget Sound Air Notification required prior to issuance - Please contact https://secure.pscleanair.org/pscaa.ui/notifications/asbestos or Tel: (206) 343-8800
|
||
Plumbing FUW Utility Service Credit | Open | Standard Conditions |
Engineering Division
Upon demolition of the existing structures, utility service credits become available for the subject site. It is the property owner’s responsibility to retain a copy of available utility service credits and to submit them to the City for future utility development credit. Utility service credits are only valid for a period of six years from the date of permit issuance for which the credits are granted. 190 water and 166 sewer FUW credits were granted for each demolished structure. Storm FUW credits can be redeemed on civil permits only. If you would like to redeem a portion or all of the credits on this permit, please provide the property owner’s written approval to do so. [Yianni Charitou @ 04/07/2025 2:54 PM]
|
Reference Number | Status | Type |
---|---|---|
PRPF20241042 | Permit(s) Issued | Pre-Fabricated Building |
PRPF20241043 | Permit(s) Issued | Pre-Fabricated Building |
PRPF20241044 | Permit(s) Issued | Pre-Fabricated Building |
PRROW20241104 | Permit(s) Issued | Right-of-Way Permit |
PRCCP20241123 | Permit(s) Issued | Civil Construction Permit |
PRFA20241763 | Closed | Fire Alarms |
PRFA20241766 | Closed | Fire Alarms |
PRFA20241767 | Closed | Fire Alarms |
PROLP20241838 | Canceled | Oversized Load/House Move Permit |
PRROW20250416 | Ready for Issuance | Right-of-Way Permit |
PLCUP20230109 | File Closed | Conditional Use Permit |
PLLC20240058 | File Closed | Lot Combination |
Date Uploaded | File Type | Name |
---|---|---|
03/24/2025 | Receipt | Receipt for transaction:2025-000573 |
04/09/2025 | Plans | SITE PLAN (Stamped) |
04/09/2025 | Form | PLUMBING FIXTURE WORKSHEET (Stamped) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.