CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0421


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0421
Mechanical - COMMERCIAL ONLY
Finaled
COSTCO WHOLESALE CORP
Replacement
REPLACING ROOFTOP UNITS LIKE FOR LIKE ~ COSTCO
06/10/2021
03/07/2022
02/20/2023
08/24/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 02/19/2022 02/17/2022
Building Review Approved 02/19/2022 02/15/2022
Building Review Incomplete 10/25/2021
Building Review Incomplete 06/15/2021
Planning Review Failed 06/14/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Boilers & Compressors/Heat Pump (1,000,001 - 1,750,000 BTU or 30-50 HP) Fee $366.50 $366.50 Paid 03/07/2022
Mechanical Duct Work Fee $14.10 $14.10 Paid 03/07/2022
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $77.60 $77.60 Paid 03/07/2022
Air Handling Unit (Up to 10,000 cfm) Fee $14.10 $14.10 Paid 03/07/2022
Mechanical Permit Fee $40.00 $40.00 Paid 03/07/2022
Mechanical Plan Review Fee $368.81 $368.81 Paid 03/07/2022
Gas Piping (Mechanical) Fee $12.80 $12.80 Paid 03/07/2022
$0.00
Building Division Fee (Hourly) $130.00 $130.00 Paid 03/07/2022
Unclassified Appliance or Equipment Fee $42.30 $42.30 Paid 03/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Mechanical Final Inspection Failed 6/28/2022 6/28/2022 06/28/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/28/2022
1 ; provide balance report with o.s.a. at time of mechanical final inspection. 2 ; complete condensate drain at r.t.u. about tire shop. 3 ; paint gas pipe at r.t.u.'s on roof. 4 ; complete insulation at refrigeration line set on roof. 5 ; cap abandoned condensate drain of roof. 6 ; provide electrical final prior to mechanical final. 7 ; complete install of angle brace at unit above pharmacy.

Mechanical Final Inspection Failed 7/26/2022 7/26/2022 07/26/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/26/2022
1 ; provide balance report with o.s.a. at time of mechanical final inspection. 2 ; complete condensate drain at r.t.u. about tire shop. 3 ; paint gas pipe at r.t.u.'s on roof. 4 ; complete insulation at refrigeration line set on roof. 5 ; cap abandoned condensate drain of roof. 6 ; provide electrical final prior to mechanical final. 7 ; complete install of angle brace at unit above pharmacy.

Other/Miscellaneous
Carried Forward
07/26/2022
1:provide balance report with osa. 2:line set insulation on roof to have uv protection.

Plumbing Below Slab Inspection VOID 08/24/2022
Monty Johnson ((253) 770-3326)
Gas Test Inspection VOID 08/24/2022
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection VOID 08/24/2022
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection VOID 08/24/2022
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 08/24/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Roof Top Screening Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: ALL EXTERIOR MECHANICAL EQUPMENT SHALL BE SCREENED FROM VIEW OF SURROUNDING PUBLIC STREETS AND RESIDENTIAL PROPERTIES. ***SUBJECT TO FINAL INSPECTION*** Call the inspection line at 1-877-232-6456 to schedule inspections. Use the Permit ID located at the top right of the permit when prompted for Permit ID. The City attempts to honor the AM/PM requested inspection, but cannot guarantee that service. Please call Monty - East of Meridian at 253-770-3326 or Shannon - West of Meridian at 253-840-6684 before 8:30 AM on the day of inspection to verify time.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/27/2022 Form B-21-0421 APP (Flattened)
01/27/2022 Plans b-21-0421 resub 1 roof frame plan (Flattened)
01/27/2022 Plans B-21-0421 RESUB 2 RESPONSE TO COMMENTS (Flattened)
01/27/2022 Plans B-21-0421 RESUB 2 REVISION FORM (Flattened)
02/24/2022 Plans 21-12-14 Puyallup (#660) HVAC location sketch SK-1 (Stamped)
02/24/2022 Plans 21-12-14 Puyallup (#660) HVAC location sketch SK-2 (Flattened)
02/24/2022 Plans 21-12-14 Puyallup (#660) HVAC review letter - S&S (Flattened)
02/24/2022 Report 711 MBD_02 signed (Stamped)
02/24/2022 Plans Adapter curb calculations and details (Stamped)
02/24/2022 Plans b-21-0421 resub 1 hvac details (Flattened)
02/24/2022 Plans b-21-0421 resub 1 wsec (Flattened)
02/24/2022 Plans b-21-0421 resub 1 wsec.pdf (Stamped)
02/24/2022 Plans B-21-0421 RESUB 2 PLANS (Flattened)
02/24/2022 Plans B-21-0421 RESUB 2 Mech Req List (Flattened)
02/24/2022 Plans B-21-0421 RESUB 2 MECH SUMMARY (Flattened)
02/24/2022 Plans C Puyallup WA HVAC Replacement Calcs (Stamped)
02/24/2022 Plans Costco - Puyallup(#660) - WA - HVAC Replacement 12-28-21 (Stamped)
02/24/2022 Plans Costco Puyallup-Permit Set 12-21-2021 (Stamped)
02/24/2022 Plans Mechanical Compliance Summary (Stamped)
02/24/2022 Form Revision to Application (Flattened)
03/07/2022 Letter Permit - Detailed
03/07/2022 Receipt Receipt for transaction:2022-000421
08/23/2022 Report Inspection Report (Mechanical Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.