CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20220189


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20220189
Civil Construction Permit
Permit(s) Issued
Other
PARKING LOTS B & C; PARKING IMPROVEMENTS: ASPHALT PAVING;CONCRETE PAVING & STOMRMWATER ~ PIERCE COLLEGE PARKING EXPANSION
02/07/2022
05/12/2023
05/01/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 05/18/2023 04/20/2023
Engineering Civil Review Approved 05/18/2023 04/20/2023
Engineering Review VOID 05/18/2023 04/20/2023
Engineering Review VOID 05/12/2023 04/18/2023
Public Works Water Review Approved 04/19/2023 04/18/2023
Fire Review Approved 04/19/2023 04/17/2023
Public Works Streets Review VOID 04/19/2023 04/13/2023
Engineering Traffic Review Approved 04/19/2023 03/28/2023
Engineering Civil Review Approved 04/19/2023 03/28/2023
Public Works Collection Review Approved 04/19/2023 03/27/2023
Planning Review Failed 04/19/2023 03/23/2023
Public Works Streets Review VOID 03/08/2023 03/09/2023
Engineering Traffic Review Failed 03/08/2023 03/09/2023
Fire Review Approved 03/08/2023 03/08/2023
Engineering Civil Review Failed 03/08/2023 03/08/2023
Public Works Water Review Failed 03/08/2023 03/01/2023
Planning Review Approved 03/08/2023 02/22/2023
Public Works Collection Review Approved 03/08/2023 02/14/2023
Engineering Traffic Review Failed 12/04/2022 12/28/2022
Engineering Civil Review Failed 12/04/2022 12/13/2022
Public Works Streets Review VOID 12/04/2022 12/12/2022
Fire Review Failed 12/04/2022 12/07/2022
Public Works Water Review Failed 12/04/2022 11/23/2022
Public Works Collection Review Approved 12/04/2022 11/17/2022
Planning Review Approved 12/04/2022 11/16/2022
Engineering Civil Review Failed 03/26/2022 05/09/2022
Engineering Traffic Review Failed 03/26/2022 05/03/2022
Public Works Streets Review Approved 03/26/2022 04/12/2022
Planning Review Failed 03/26/2022 03/30/2022
Public Works Collection Review Failed 03/26/2022 03/23/2022
Fire Review Failed 03/26/2022 03/23/2022
Public Works Water Review Failed 03/26/2022 03/21/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $25,090.81 $25,090.81 Paid 05/10/2023
Engineering Permit Fee $300.00 $300.00 Paid 05/10/2023
Civil Review Fee $470.00 $470.00 Paid 02/08/2022
Record Drawing Review Fee $200.00 $200.00 Paid 02/08/2022
Civil Review Additional Fee $7,740.00 $7,740.00 Paid 05/10/2023
Planning Landscape Review Fee $300.00 $300.00 Paid 05/10/2023
Storm System Development Charge - Commercial $44,143.00 $44,143.00 Paid 05/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Final Inspection Pending
Jason Little ((253) 244-0387)
Planning Landscape Inspection Pending
Engineering Punchlist Inspection Pending
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/19/2023 05/19/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/22/2023 05/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/23/2023 05/23/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/24/2023 05/24/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/25/2023 05/25/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/30/2023 05/30/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/31/2023 05/31/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/1/2023 06/02/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/5/2023 06/05/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/6/2023 06/06/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/7/2023 06/07/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/8/2023 06/08/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/9/2023 06/09/2023
Jeff Hill ((253) 204-5633)
Job Start Inspection VOID 06/09/2023
Robyn Buck ((253) 435-3617)
Engineering Daily Inspection Partial Pass 6/12/2023 06/12/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/13/2023 06/13/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/14/2023 06/14/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/15/2023 06/15/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/19/2023 06/19/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/20/2023 06/20/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/21/2023 06/21/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/22/2023 06/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/23/2023 06/23/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/26/2023 06/26/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/27/2023 06/27/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/28/2023 06/28/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/29/2023 06/29/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/30/2023 06/30/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/3/2023 07/03/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 7/5/2023 07/05/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 7/6/2023 07/06/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 7/7/2023 07/07/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 7/18/2023 07/18/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/19/2023 07/19/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/24/2023 07/24/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/25/2023 07/25/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/26/2023 07/26/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/27/2023 07/27/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 7/31/2023 07/31/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/1/2023 08/01/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/2/2023 08/02/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/3/2023 08/03/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/4/2023 08/04/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/7/2023 08/07/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/8/2023 08/08/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/9/2023 08/09/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/10/2023 08/10/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/14/2023 08/14/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/16/2023 08/16/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/18/2023 08/18/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/21/2023 08/21/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/22/2023 08/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/23/2023 08/23/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/24/2023 08/24/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/25/2023 08/25/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/28/2023 08/28/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/30/2023 08/30/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/1/2023 09/01/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/6/2023 09/06/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/7/2023 09/07/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/11/2023 09/11/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/13/2023 09/13/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/15/2023 09/15/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/18/2023 09/18/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/19/2023 09/19/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/19/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
09/19/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 9/20/2023 09/20/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/20/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
09/20/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 9/22/2023 09/22/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/22/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
09/22/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 9/25/2023 09/25/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/25/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
09/25/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 9/29/2023 09/29/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
09/29/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
09/29/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/2/2023 10/02/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/02/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/02/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/4/2023 10/04/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/04/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/04/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/6/2023 10/06/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/06/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/06/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/9/2023 10/09/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/09/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/09/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/11/2023 10/11/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/11/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/11/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/13/2023 10/13/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/13/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/13/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/18/2023 10/18/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/18/2023
Parking Lot C Punchlist items: - Add straw and seed to all bare areas where the electrical was installed. - AR seal all asphalt over cuts and rough spalled areas where water will seep through.

Other/Miscellaneous
Carried Forward
10/18/2023
Parking Lot B Punchlist: - AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH. - Locate and raise to FG existing CB near daycare. - Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale. - Install 1 hand hold in riser for detention pipe. - Mount ladders in 7 risers for detention pipe. - Clean foam debris out of detention pipe. - Install missing nuts for detention riser lids to be bolted down.

Engineering Daily Inspection Partial Pass 10/20/2023 10/20/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
10/20/2023
Parking Lot C Punchlist: - Seed and straw exposed dirt around new light poles and trenches.

Other/Miscellaneous
Carried Forward
10/20/2023
Parking Lot B Punchlist: - Check AR seal on west center detention lids. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH & MH to the north. - Check hanging ladders in flow control MH & MH to the north for mounting. - Clean foam debris out of detention pipe.

Engineering Punchlist Inspection Partial Pass 10/20/2023 10/20/2023
Jason Little ((253) 244-0387)
Engineering Punchlist Inspection Partial Pass 10/20/2023 10/20/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/1/2023 11/01/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
11/01/2023
Parking Lot C Punchlist: - Seed and straw exposed dirt around new light poles and trenches.

Other/Miscellaneous
Carried Forward
11/01/2023
Parking Lot B Punchlist: - Install 6" concrete collar around 1 MH lid (flow control) in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean foam debris out of detention pipe.

Engineering Punchlist Inspection Partial Pass 11/1/2023 11/01/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/2/2023 11/02/2023
Jason Little ((253) 244-0387)
Other/Miscellaneous
Carried Forward
11/02/2023
Parking Lot C Punchlist: - Seed and straw exposed dirt around new light poles and trenches.

Other/Miscellaneous
Carried Forward
11/02/2023
Parking Lot B Punchlist: - Install 6" concrete collar around 1 MH lid (flow control) in the planter and raise to grade. - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean foam debris out of detention pipe.

Erosion And Sediment Inspection VOID 11/03/2023
Jason Little ((253) 244-0387)
Engineering Punchlist Inspection Partial Pass 11/3/2023 11/03/2023
Jason Little ((253) 244-0387)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Open Standard Conditions
: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abandoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Certificate of Insurance/CG2012 Resolved Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond Resolved Engineering Division Prior to Issuance
: A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
Williams Gas Pipeline Survey Resolved Engineering Division Prior to Issuance
: The plans have been altered to not construct any work near the Williams Gas Pipeline
Miscellaneous Condition Resolved Development & Permitting Services Prior to Issuance
: Provide an easement for the city to review/approve for the preservation of the full dispersion flow path area.
Miscellaneous Condition Open Development & Permitting Services Prior to Occupancy
: Provide the recorded easement for the preservation of the full dispersion flow path area.
Miscellaneous Condition Resolved Development & Permitting Services Prior to Issuance
: INADVERTENT DISCOVERY PLAN SIGNATURE PAGE
Overtime Inspection and Watermain Shutdown Fee Resolved Engineering Division Prior to Issuance
: This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s Resolved Development & Permitting Services Storm Punchlist Section A
: Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Development & Permitting Services Misc. Punchlist Section B
: Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Miscellaneous Stormwater A Item Resolved Development & Permitting Services Storm Punchlist Section A
: Parking Lot C Punchlist item - Add straw and seed to all bare areas where the electrical was installed.
Punchlist: Miscellaneous Streets A Item Resolved Development & Permitting Services Street Punchlist Section A
: Parking Lot C Punchlist items: - AR seal all asphalt over cuts and rough spalled areas where water will seep through.
Punchlist: Miscellaneous A Item Resolved Development & Permitting Services Misc. Punchlist Section A
:
Punchlist: Provide the City with a signed stormwater agreement Open Engineering Division Storm Punchlist Section B
: Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit. See blank form here: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.cityofpuyallup.org/DocumentCenter/View/1408/Stormwater-Management-Facilities-Agreement-PDF-?bidId=
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: Parking Lot B Punchlist: - Check AR seal on middle west detention lid areas where water will seep. - Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: Parking Lot B Punchlist: - Install (core drill) inspection port for flow control MH w/ concrete collar. - Clean debris out of flow control MH and MH to the north. - Check hanging ladder in flow control MH and MH to the north for mounts. - Clean foam debris out of detention pipe.
Punchlist: Miscellaneous B Item Resolved Engineering Division Misc. Punchlist Section B
: Schedule a landscape inspection with the planning department. Contact Chris at cbeale@puyallupwa.gov or 253-841-5418 [Anthony Hulse @ 05/15/2024 7:36 AM] See email in Docs and Images for email confirmation from Chris. "RE: Pierce College Parking Improvements - PRCCP20220189 - Landscape Inspection"
Punchlist: This project owes overtime inspection fees Resolved Engineering Division Misc. Punchlist Section A
: This project owes $180 in overtime inspection fees.
Punchlist: Miscellaneous Stormwater A Item Open Engineering Division Storm Punchlist Section A
: Provide the recorded easement for the preservation of the full dispersion flow path area.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20231400 Permit(s) Issued Civil Construction Permit

Documents & Images

Date Uploaded File Type Name
01/18/2024 Plans PRCCP20220189 PIERCE COLLEGE PARKING IMPROVEMENTS RECORD DRAWINGS
02/07/2023 Report 20230130 SIGHT DISTANCE
02/07/2023 Report Buoyancy Calculations
02/07/2023 Report Lot A Truck Turn
02/07/2023 Report Lot B Truck Turn
02/07/2023 Report Pierce College -Parking Lot Expansion Groundwater Addendum
02/07/2023 Plans Pierce College Puyallup Tree Protection Plan 11-1-22
02/08/2022 Letter Incomplete Application Notice
02/08/2022 Receipt Receipt for transaction:2022-000216
03/10/2023 Letter Permit Review Correction Letter
03/23/2023 COP GIS Wetland Update Request Form
04/14/2022 Report Pierce College_3rd Party Review_CoPuyallup_041222
04/18/2023 Form 20230320 Ltr (Resp-Puyallup-Permit Rev Corr) 2200718_12 (Flattened)
04/18/2023 Report 20230320 Rpt (CSWPPP) 2200718_10 (combined) (Flattened)
04/18/2023 Report 20230320 Rpt (SSP) 2200718_12 (combined)0 (Flattened)
04/18/2023 Letter Permit Review Correction Letter
04/27/2023 Plans LANDSCAPE PLANS (Stamped)
05/10/2023 Receipt Receipt for transaction:2023-000839
05/11/2022 Form Civil Const App UPDATED 6-10-21_202106101750301159_1 (Flattened)
05/11/2022 Letter Permit Review Comment Notice
05/11/2022 Report PIERCE COLLEGE WETLAND REPORT0 (Flattened)
05/12/2023 Permit Permit - Detailed
05/19/2023 Report Inspection Report (Engineering Daily Inspection)
06/09/2023 Informal Plan Change for Level Dispersion Trench
06/09/2023 Lot C Dispersion Trench Email Update
09/19/2023 Report Inspection Report (Engineering Daily Inspection)
09/20/2023 Letter Inspection Punchlist
09/20/2023 Letter Inspection Punchlist
10/20/2023 Letter Inspection Punchlist (Engineering Punchlist Inspection)
10/20/2023 Report Inspection Report (Engineering Daily Inspection)
11/03/2023 Letter Inspection Punchlist (Engineering Punchlist Inspection)
11/16/2023 PRCCP20220189 DESIGN ENGINEER STORMWATER CERTIFICATION LETTER
12/28/2022 Other 32 94 51 Soil Cells System SPEC (Flattened)
12/28/2022 Letter Permit Review Comment Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.