Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Engineering Inspection Fee (3%) | $25,090.81 | $25,090.81 | Paid | 05/10/2023 |
Engineering Permit Fee | $300.00 | $300.00 | Paid | 05/10/2023 |
Civil Review Fee | $470.00 | $470.00 | Paid | 02/08/2022 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 02/08/2022 |
Civil Review Additional Fee | $7,740.00 | $7,740.00 | Paid | 05/10/2023 |
Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 05/10/2023 |
Storm System Development Charge - Commercial | $44,143.00 | $44,143.00 | Paid | 05/10/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $78,243.81 | $78,243.81 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Engineering Final Inspection | Pending | |||
Jason Little ((253) 244-0387) | ||||
Planning Landscape Inspection | Pending | |||
Engineering Punchlist Inspection | Pending | |||
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/19/2023 | 05/19/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/22/2023 | 05/22/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/23/2023 | 05/23/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/24/2023 | 05/24/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/25/2023 | 05/25/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/30/2023 | 05/30/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/31/2023 | 05/31/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/1/2023 | 06/02/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/5/2023 | 06/05/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/6/2023 | 06/06/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/7/2023 | 06/07/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/8/2023 | 06/08/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/9/2023 | 06/09/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Job Start Inspection | VOID | 06/09/2023 | ||
Robyn Buck ((253) 435-3617) | ||||
Engineering Daily Inspection | Partial Pass | 6/12/2023 | 06/12/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/13/2023 | 06/13/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/14/2023 | 06/14/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/15/2023 | 06/15/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/19/2023 | 06/19/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/20/2023 | 06/20/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/21/2023 | 06/21/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/22/2023 | 06/22/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/23/2023 | 06/23/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/26/2023 | 06/26/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/27/2023 | 06/27/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/28/2023 | 06/28/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/29/2023 | 06/29/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/30/2023 | 06/30/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/3/2023 | 07/03/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/5/2023 | 07/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/6/2023 | 07/06/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/7/2023 | 07/07/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/18/2023 | 07/18/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/19/2023 | 07/19/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/24/2023 | 07/24/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/25/2023 | 07/25/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/26/2023 | 07/26/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/27/2023 | 07/27/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/31/2023 | 07/31/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/1/2023 | 08/01/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/2/2023 | 08/02/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/3/2023 | 08/03/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/4/2023 | 08/04/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/7/2023 | 08/07/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/8/2023 | 08/08/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/9/2023 | 08/09/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/10/2023 | 08/10/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/14/2023 | 08/14/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/16/2023 | 08/16/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/18/2023 | 08/18/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/21/2023 | 08/21/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/22/2023 | 08/22/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/23/2023 | 08/23/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/24/2023 | 08/24/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/25/2023 | 08/25/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/28/2023 | 08/28/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/30/2023 | 08/30/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/1/2023 | 09/01/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/6/2023 | 09/06/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/7/2023 | 09/07/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/11/2023 | 09/11/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/13/2023 | 09/13/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/15/2023 | 09/15/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/18/2023 | 09/18/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 9/19/2023 | 09/19/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
09/19/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
09/19/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 9/20/2023 | 09/20/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
09/20/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
09/20/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 9/22/2023 | 09/22/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
09/22/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
09/22/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 9/25/2023 | 09/25/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
09/25/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
09/25/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 9/29/2023 | 09/29/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
09/29/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
09/29/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/2/2023 | 10/02/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/02/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/02/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/4/2023 | 10/04/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/04/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/04/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/6/2023 | 10/06/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/06/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/06/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/9/2023 | 10/09/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/09/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/09/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/11/2023 | 10/11/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/11/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/11/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/13/2023 | 10/13/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/13/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/13/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/18/2023 | 10/18/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/18/2023
Parking Lot C Punchlist items:
- Add straw and seed to all bare areas where the electrical was installed.
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
||||
Other/Miscellaneous
Carried Forward
10/18/2023
Parking Lot B Punchlist:
- AR seal all asphalt over cuts, new joints, and rough (spalled) areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH.
- Locate and raise to FG existing CB near daycare.
- Install mesh screen (1/2" on bottom & 1" on top) on tees in bio swale.
- Install 1 hand hold in riser for detention pipe.
- Mount ladders in 7 risers for detention pipe.
- Clean foam debris out of detention pipe.
- Install missing nuts for detention riser lids to be bolted down.
|
||||
Engineering Daily Inspection | Partial Pass | 10/20/2023 | 10/20/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
10/20/2023
Parking Lot C Punchlist:
- Seed and straw exposed dirt around new light poles and trenches.
|
||||
Other/Miscellaneous
Carried Forward
10/20/2023
Parking Lot B Punchlist:
- Check AR seal on west center detention lids.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH & MH to the north.
- Check hanging ladders in flow control MH & MH to the north for mounting.
- Clean foam debris out of detention pipe.
|
||||
Engineering Punchlist Inspection | Partial Pass | 10/20/2023 | 10/20/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Punchlist Inspection | Partial Pass | 10/20/2023 | 10/20/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 11/1/2023 | 11/01/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
11/01/2023
Parking Lot C Punchlist:
- Seed and straw exposed dirt around new light poles and trenches.
|
||||
Other/Miscellaneous
Carried Forward
11/01/2023
Parking Lot B Punchlist:
- Install 6" concrete collar around 1 MH lid (flow control) in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean foam debris out of detention pipe.
|
||||
Engineering Punchlist Inspection | Partial Pass | 11/1/2023 | 11/01/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 11/2/2023 | 11/02/2023 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
11/02/2023
Parking Lot C Punchlist:
- Seed and straw exposed dirt around new light poles and trenches.
|
||||
Other/Miscellaneous
Carried Forward
11/02/2023
Parking Lot B Punchlist:
- Install 6" concrete collar around 1 MH lid (flow control) in the planter and raise to grade.
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean foam debris out of detention pipe.
|
||||
Erosion And Sediment Inspection | VOID | 11/03/2023 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Punchlist Inspection | Partial Pass | 11/3/2023 | 11/03/2023 | |
Jason Little ((253) 244-0387) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Civil Standard Conditions | Open | Standard Conditions | |||
:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abandoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
Certificate of Insurance/CG2012 | Resolved | Engineering Division | Prior to Issuance | ||
:
Certificate or Insurance/CG2012 must be received prior to issuance
|
|||||
Clear, Fill, and Grade Bond | Resolved | Engineering Division | Prior to Issuance | ||
:
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
|
|||||
Williams Gas Pipeline Survey | Resolved | Engineering Division | Prior to Issuance | ||
:
The plans have been altered to not construct any work near the Williams Gas Pipeline
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Prior to Issuance | ||
:
Provide an easement for the city to review/approve for the preservation of the full dispersion flow path area.
|
|||||
Miscellaneous Condition | Open | Development & Permitting Services | Prior to Occupancy | ||
:
Provide the recorded easement for the preservation of the full dispersion flow path area.
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Prior to Issuance | ||
:
INADVERTENT DISCOVERY PLAN SIGNATURE PAGE
|
|||||
Overtime Inspection and Watermain Shutdown Fee | Resolved | Engineering Division | Prior to Issuance | ||
:
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
|
|||||
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s | Resolved | Development & Permitting Services | Storm Punchlist Section A | ||
:
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
|||||
Punchlist: Provide the City with an electronic version of the record drawings | Resolved | Development & Permitting Services | Misc. Punchlist Section B | ||
:
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
|||||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Development & Permitting Services | Storm Punchlist Section A | ||
:
Parking Lot C Punchlist item
- Add straw and seed to all bare areas where the electrical was installed.
|
|||||
Punchlist: Miscellaneous Streets A Item | Resolved | Development & Permitting Services | Street Punchlist Section A | ||
:
Parking Lot C Punchlist items:
- AR seal all asphalt over cuts and rough spalled areas where water will seep through.
|
|||||
Punchlist: Miscellaneous A Item | Resolved | Development & Permitting Services | Misc. Punchlist Section A | ||
:
|
|||||
Punchlist: Provide the City with a signed stormwater agreement | Open | Engineering Division | Storm Punchlist Section B | ||
:
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit. See blank form here: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.cityofpuyallup.org/DocumentCenter/View/1408/Stormwater-Management-Facilities-Agreement-PDF-?bidId=
|
|||||
Punchlist: Miscellaneous Streets A Item | Resolved | Engineering Division | Street Punchlist Section A | ||
:
Parking Lot B Punchlist:
- Check AR seal on middle west detention lid areas where water will seep.
- Install 6" concrete collar around 2ea. MH lids in the planter and raise to grade.
|
|||||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Engineering Division | Storm Punchlist Section A | ||
:
Parking Lot B Punchlist:
- Install (core drill) inspection port for flow control MH w/ concrete collar.
- Clean debris out of flow control MH and MH to the north.
- Check hanging ladder in flow control MH and MH to the north for mounts.
- Clean foam debris out of detention pipe.
|
|||||
Punchlist: Miscellaneous B Item | Resolved | Engineering Division | Misc. Punchlist Section B | ||
:
Schedule a landscape inspection with the planning department. Contact Chris at cbeale@puyallupwa.gov or 253-841-5418 [Anthony Hulse @ 05/15/2024 7:36 AM] See email in Docs and Images for email confirmation from Chris. "RE: Pierce College Parking Improvements - PRCCP20220189 - Landscape Inspection"
|
|||||
Punchlist: This project owes overtime inspection fees | Resolved | Engineering Division | Misc. Punchlist Section A | ||
:
This project owes $180 in overtime inspection fees.
|
|||||
Punchlist: Miscellaneous Stormwater A Item | Open | Engineering Division | Storm Punchlist Section A | ||
:
Provide the recorded easement for the preservation of the full dispersion flow path area.
|
Reference Number | Status | Type |
---|---|---|
PRCCP20231400 | Permit(s) Issued | Civil Construction Permit |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView