CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20231400


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20231400
Civil Construction Permit
Ready for Issuance
ST OF WA PIERCE COLLEGE
Other
PARKING LOT A; PARKING IMPROVEMENTS: ASPHALT PAVING;CONCRETE PAVING & STORMWATER ~ PIERCE COLLEGE PARKING EXPANSION
10/02/2023
10/16/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 04/12/2024 04/08/2024
Fire Review Approved 04/12/2024 04/03/2024
Public Works Streets Review Approved 04/12/2024 04/03/2024
Public Works Water Review Approved 04/12/2024 04/02/2024
Planning Review Approved 04/12/2024 03/26/2024
Public Works Collection Review Approved 04/12/2024 03/20/2024
Engineering Traffic Review Approved 04/12/2024 03/20/2024
Engineering Civil Review Failed 02/16/2024 02/28/2024
Public Works Water Review Failed 02/16/2024 02/16/2024
Public Works Streets Review Approved 02/16/2024 02/16/2024
Public Works Collection Review Approved 02/16/2024 02/05/2024
Fire Review Approved 02/16/2024 02/01/2024
Engineering Traffic Review Approved 02/16/2024 01/29/2024
Planning Review Approved 02/16/2024 01/29/2024
Public Works Streets Review Approved 12/14/2023 12/18/2023
Engineering Civil Review Failed 12/14/2023 12/14/2023
Planning Review Approved 12/14/2023 12/14/2023
Engineering Traffic Review Failed 12/14/2023 12/13/2023
Public Works Water Review Failed 12/14/2023 12/08/2023
Fire Review Failed 12/14/2023 12/05/2023
Public Works Collection Review Approved 12/14/2023 11/20/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $27,610.38 $27,610.38 Paid 04/19/2024
Engineering Permit Fee $300.00 $300.00 Paid 04/19/2024
Civil Review Fee $470.00 $470.00 Paid 10/09/2023
Record Drawing Review Fee $200.00 $200.00 Paid 10/09/2023
Storm System Development Charge - Commercial $57,193.22 $57,193.22 Paid 04/19/2024
Civil Review Additional Fee $1,440.00 $1,440.00 Paid 04/19/2024
Civil Review Additional Fee $180.00 $180.00 Paid 04/19/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Open Engineering Division Standard Conditions
: Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Performance Bond Open Engineering Division Prior to Issuance
: This bond is required for projects requiring constructing of a stormwater facility or improvement within the city limits of the City of Puyallup. The bond will be in the amount of125% of the estimated cost of construction or improvement and will not be released until a Stormwater Maintenance Bond has been received.
Inadvertent Discovery Plan (IDP) Open Engineering Division Prior to Issuance
: Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
Certificate of Insurance/CG2012 Open Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond Resolved Engineering Division Prior to Issuance
: NOT REQUIRED > STORMWATER PERFORMANCE BOND TO BE UTILIZED. -AH
Williams Gas Pipeline Survey Resolved Engineering Division Prior to Issuance
: The applicant shall contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or (253) 377-6146 to schedule a survey of the gas pipeline easement adjacent to the property before construction is initiated. Matthew may need access to neighbors' property to complete the survey. The applicant shall submit a copy of Matthew's survey approval to the City before proceeding.
Miscellaneous Condition Resolved Traffic Division Standard Conditions
:
Stormwater Maintenance Agreement (SWA) Open Engineering Division Prior to Occupancy
: The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Overtime Inspection and Watermain Shutdown Fee Resolved Engineering Division Prior to Issuance
: This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time). Received 4.22.24. See Documents & Images

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20220189 Permit(s) Issued Civil Construction Permit

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.