CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20231400


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20231400
Civil Construction Permit
Permit(s) Issued
ST OF WA PIERCE COLLEGE
Other
PARKING LOT A; PARKING IMPROVEMENTS: ASPHALT PAVING;CONCRETE PAVING & STORMWATER ~ PIERCE COLLEGE PARKING EXPANSION
10/02/2023
06/18/2024
02/26/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 04/12/2024 04/08/2024
Fire Review Approved 04/12/2024 04/03/2024
Public Works Streets Review Approved 04/12/2024 04/03/2024
Public Works Water Review Approved 04/12/2024 04/02/2024
Planning Review Approved 04/12/2024 03/26/2024
Public Works Collection Review Approved 04/12/2024 03/20/2024
Engineering Traffic Review Approved 04/12/2024 03/20/2024
Engineering Civil Review Failed 02/16/2024 02/28/2024
Public Works Water Review Failed 02/16/2024 02/16/2024
Public Works Streets Review Approved 02/16/2024 02/16/2024
Public Works Collection Review Approved 02/16/2024 02/05/2024
Fire Review Approved 02/16/2024 02/01/2024
Engineering Traffic Review Approved 02/16/2024 01/29/2024
Planning Review Approved 02/16/2024 01/29/2024
Public Works Streets Review Approved 12/14/2023 12/18/2023
Engineering Civil Review Failed 12/14/2023 12/14/2023
Planning Review Approved 12/14/2023 12/14/2023
Engineering Traffic Review Failed 12/14/2023 12/13/2023
Public Works Water Review Failed 12/14/2023 12/08/2023
Fire Review Failed 12/14/2023 12/05/2023
Public Works Collection Review Approved 12/14/2023 11/20/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $27,610.38 $27,610.38 Paid 04/19/2024
Engineering Permit Fee $300.00 $300.00 Paid 04/19/2024
Civil Review Fee $470.00 $470.00 Paid 10/09/2023
Record Drawing Review Fee $200.00 $200.00 Paid 10/09/2023
Storm System Development Charge - Commercial $57,193.22 $57,193.22 Paid 04/19/2024
Civil Review Additional Fee $1,440.00 $1,440.00 Paid 04/19/2024
Civil Review Additional Fee $180.00 $180.00 Paid 04/19/2024
Planning Landscape Review Fee $180.00 $180.00 Paid 06/17/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Punchlist Inspection Pending
Jason Little ((253) 435-3636)
Engineering Final Inspection Pending
Jason Little ((253) 435-3636)
Planning Landscape Inspection Pending
Erosion And Sediment Inspection Pending
Jason Little ((253) 435-3636)
Other/Miscellaneous
Outstanding
07/15/2024
- Keep construction debris off roadway! - Maintain dust control! - Finish silt fence where needed. If fill is going to be higher than surrounding areas, silt fence needs to be installed. - Finish tree protection where and if needed.

Engineering Daily Inspection Pending 9/3/2024
Jason Little ((253) 435-3636)
Job Start Inspection Partial Pass 6/26/2024 06/26/2024
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Partial Pass 6/27/2024 06/27/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 6/27/2024 06/27/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 6/28/2024 06/28/2024
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Partial Pass 6/28/2024 06/28/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/1/2024 07/01/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/2/2024 07/02/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 7/3/2024 07/03/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 7/8/2024 07/08/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 7/9/2024 07/09/2024
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Failed 7/9/2024 07/09/2024
Jason Little ((253) 435-3636)
Other/Miscellaneous
Carried Forward
07/09/2024
- Dust control needs to be provided prior to any more work! - Finish silt fence where needed. If fill is going to be higher than surrounding areas, silt fence needs to be installed. - Install tree protection fence where needed.

Erosion And Sediment Inspection Partial Pass 7/10/2024 07/10/2024
Jason Little ((253) 435-3636)
Other/Miscellaneous
Carried Forward
07/10/2024
- Maintain dust control! - Finish silt fence where needed. If fill is going to be higher than surrounding areas, silt fence needs to be installed. - Finish tree protection where and if needed. - Keep road clean as needed.

Engineering Daily Inspection Failed 7/12/2024 07/12/2024
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Failed 7/12/2024 07/12/2024
Jason Little ((253) 435-3636)
Other/Miscellaneous
Carried Forward
07/12/2024
- Clean construction debris off roadway! - Maintain dust control! - Finish silt fence where needed. If fill is going to be higher than surrounding areas, silt fence needs to be installed. - Finish tree protection where and if needed.

Erosion And Sediment Inspection Partial Pass 7/15/2024 07/15/2024
Jason Little ((253) 435-3636)
Other/Miscellaneous
Carried Forward
07/15/2024
- Keep construction debris off roadway! - Maintain dust control! - Finish silt fence where needed. If fill is going to be higher than surrounding areas, silt fence needs to be installed. - Finish tree protection where and if needed.

Engineering Daily Inspection Partial Pass 7/16/2024 07/16/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/17/2024 07/17/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/18/2024 07/18/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/19/2024 07/19/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/23/2024 07/23/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/24/2024 07/24/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/25/2024 07/25/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 7/26/2024 07/26/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/29/2024 07/29/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/30/2024 07/30/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 7/31/2024 07/31/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/1/2024 08/01/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/2/2024 08/02/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/5/2024 08/05/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/6/2024 08/06/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/7/2024 08/07/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/8/2024 08/08/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/9/2024 08/09/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/13/2024 08/13/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/14/2024 08/14/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/15/2024 08/15/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/16/2024 08/16/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/19/2024 08/19/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/20/2024 08/20/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/22/2024 08/22/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/23/2024 08/23/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/26/2024 08/26/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/27/2024 08/27/2024
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 8/30/2024 08/30/2024
Jason Little ((253) 435-3636)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Open Engineering Division Standard Conditions
: Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Performance Bond Resolved Engineering Division Prior to Issuance
: This bond is required for projects requiring constructing of a stormwater facility or improvement within the city limits of the City of Puyallup. The bond will be in the amount of125% of the estimated cost of construction or improvement and will not be released until a Stormwater Maintenance Bond has been received. - Per Anthony, Stormwater Performance Bond Needed.
Inadvertent Discovery Plan (IDP) Resolved Engineering Division Prior to Issuance
: Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
Certificate of Insurance/CG2012 Resolved Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance. COI & CG D3 16 approved by WCIA (email uploaded under documents).
Clear, Fill, and Grade Bond Resolved Engineering Division Prior to Issuance
: NOT REQUIRED > STORMWATER PERFORMANCE BOND TO BE UTILIZED. -AH ***UPDATE***: PER EMAIL FROM ANTHONY HULSE ON 6/7/2024, CFG BOND NEEDED IN THE AMOUNT OF $46,000.00. [Robin Loewen @ 06/17/2024 5:38 PM]
Williams Gas Pipeline Survey Resolved Engineering Division Prior to Issuance
: The applicant shall contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or (253) 377-6146 to schedule a survey of the gas pipeline easement adjacent to the property before construction is initiated. Matthew may need access to neighbors' property to complete the survey. The applicant shall submit a copy of Matthew's survey approval to the City before proceeding.
Miscellaneous Condition Resolved Traffic Division Standard Conditions
:
Stormwater Maintenance Agreement (SWA) Open Engineering Division Prior to Occupancy
: The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Overtime Inspection and Watermain Shutdown Fee Resolved Engineering Division Prior to Issuance
: This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time). Received 4.22.24. See Documents & Images
Ready to Issue - Need Contractor Info Resolved Development & Permitting Services Prior to Issuance
: Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20220189 Permit(s) Issued Civil Construction Permit

Documents & Images

Date Uploaded File Type Name
01/19/2024 Other WILLIAM GAS LINE APPROVAL/CONDITIONS
02/29/2024 Letter Permit Review Correction Letter
03/14/2024 Form 20240314 Ltr (Resp-Puyallup-Permit Rev Corr2) 2200718_13
04/10/2024 Report 20240314 Rpt (CSWPPP) 2200718_13 (combined) (Flattened)
04/10/2024 Report 20240314 Rpt (SSP) 2200718_13 (combined) (Flattened)
04/10/2024 Other 31 20 00 Earth Moving (Flattened)
04/10/2024 Plans APPROVED CIVIL PLANS PRCCP20231400 (Stamped)
04/10/2024 Other Hydroperiod Assessment_022824 (Flattened)
04/19/2024 Receipt Receipt for transaction: 2024-000802
06/17/2024 Receipt Receipt for transaction:2024-001275
06/18/2024 Permit Permit - Detailed
06/18/2024 Permit Permit - Detailed
06/24/2024 Pre-Construction Meeting - PRCCP20231400 - PIERCE COLLEGE PARKING EXPANSION-20240624_090330-Meeting Recording
07/09/2024 Report Inspection Report (Erosion And Sediment Inspection)
07/10/2024 Report Inspection Report (Erosion And Sediment Inspection)
07/12/2024 Report Inspection Report (Erosion And Sediment Inspection)
08/06/2024 Report Inspection Report (Engineering Daily Inspection)
08/07/2024 Report Inspection Report (Engineering Daily Inspection)
08/16/2024 Report Inspection Report (Engineering Daily Inspection)
08/19/2024 Email FW: PIE Puyallup Parking Lot Expansion: Response to RFI #9 (Proposed 12" Di Willamette Crossing Material Clarification )
08/19/2024 Agreement Letter of No Objection_Pierce College - Signed 240802
08/19/2024 Email RE: PIE Puyallup Parking Lot Expansion: Response to RFI #9 (Proposed 12" Di Willamette Crossing Material Clarification )
10/02/2023 Form APPLICATION
10/02/2023 Letter Incomplete Application Notice
10/02/2023 Other RESPONSE LETTER FROM PREVIOUS STAFF COMMENT UNDER PRCCP20220189 FOR LOT A
10/03/2023 Plans 1400 ESCP
10/03/2023 Report 1400 GEOTECH
10/03/2023 Other ENGINEER COST BREAKDOWN
10/09/2023 Receipt Receipt for transaction:2023-001934
12/19/2023 Letter Permit Review Correction Letter
12/19/2023 Other RESPONSE_Incomplete Application Notice (Flattened)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.