CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
PRCCP20241039
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Civil Review Fee | $470.00 | $470.00 | Paid | 06/27/2024 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 06/27/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Engineering Inspection Fee (3%) | $0.00 | $0.00 | Not payable | Not Paid |
Engineering Permit Fee | $300.00 | $0.00 | Not payable | Not Paid |
Totals: | $970.00 | $670.00 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this engineering permit application, or you are not authorized to view them.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Civil Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
Pre-Construction Meeting | Open | Engineering Division | Standard Conditions | ||
:
Please contact the DPS Support Specialist, Robin Loewen at RLOEWEN@PUYALLUPWA.GOV to request a pre-construction meeting prior to starting site work.
|
|||||
Performance Bond | Open | Engineering Division | Prior to Issuance | ||
:
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
|
|||||
Inadvertent Discovery Plan (IDP) | Open | Engineering Division | Prior to Issuance | ||
:
Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
|
|||||
Overtime Inspection and Watermain Shutdown Fee | Open | Engineering Division | Prior to Issuance | ||
:
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
|
|||||
Certificate of Insurance/CG2012 | Open | Engineering Division | Prior to Issuance | ||
:
Certificate or Insurance/CG2012 must be received prior to issuance
|
|||||
Clear, Fill, and Grade Bond | Open | Engineering Division | Prior to Issuance | ||
:
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
|
|||||
Miscellaneous Condition | Open | Development & Permitting Services | Prior to Issuance | ||
:
Must meet any engineering and/or public works waste water requirements before approval.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Issuance | ||
:
Prior to issuance of civil construction permit PRCCP20241039, the applicant shall pay the paint booth and manufacturing facility sewer system development fees deferred and condition under PRCTI20221916 by applying for a separate Utility Connection Permit through the CityView portal or requesting that the deferred fees are assessed on a building permit currently under review. [Yianni Charitou @ 10/23/2024 9:20 AM]
Assessed and paid under building permit PRCTI20241500. [Yianni Charitou @ 10/23/2024 1:44 PM]
|
Reference Number | Status | Type |
---|---|---|
PRRWF20220381 | Canceled | Retaining Wall |
PRCTI20220873 | Closed | Commercial - Tenant Improvement/Remodel |
PRFS20221095 | Closed | Fire Sprinklers |
PRSG20221172 | Closed | Sign/Awning |
PRFA20221284 | Closed | Fire Alarms |
PRCTI20221624 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221709 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221916 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230034 | Closed | Fire Alarms |
PRCTI20230167 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230302 | Closed | Fire Alarms |
PRCTI20230447 | Closed | Commercial - Tenant Improvement/Remodel |
PRCP20230511 | Closed | Carport |
PRFS20230711 | Closed | Fire Sprinklers |
PRCP20230996 | Closed | Carport |
PRCTI20230997 | Closed | Commercial - Tenant Improvement/Remodel |
PRMH20231156 | Closed | Mechanical - COMMERCIAL ONLY |
PRFS20231516 | Closed | Fire Sprinklers |
PRFS20240612 | Closed | Fire Sprinklers |
PRCTI20240671 | Closed | Commercial - Tenant Improvement/Remodel |
Date Uploaded | File Type | Name |
---|---|---|
06/27/2024 | Plans | 240403_Puyallup_Layout-Complete |
06/27/2024 | Plans | CIVIL PERMIT APPLICATION |
06/27/2024 | Letter | Incomplete Application Notice |
06/27/2024 | Receipt | Receipt for transaction:2024-001351 |
09/20/2024 | Report | Discharge Permit Application-Categorical SIU (Flattened) |
09/20/2024 | Letter | Permit Review Correction Letter |
09/20/2024 | Report | Red Dot Puyallup Facility WW Engineering Report_2024-06-22 (Flattened) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView