CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRRWF20220381


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRRWF20220381
Retaining Wall
Canceled
CH REALTY IX-JV I PUYALLUP LOGISTICS L P
New
The work includes sourcing, providing and installing concrete retaining wall blocks to the lines and grades as specified on the project construction drawings and as may be further specified herein.
02/22/2022

Locations

Property
0420264065

Address
2504 E MAIN, PUYALLUP, WA 98372

0420263700 and 403
South Side of E Main and West of 23rd Street E, Puyallup WA 98371

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 03/26/2022 03/31/2022
Planning Review Approved 03/26/2022 03/29/2022
Building Review Approved 03/26/2022 03/23/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $441.19 $441.19 Paid 03/11/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Development & Permitting Services Standard Conditions
: Civil Permit E-20-0137 The west retaining wall (wall 1) shall connect retaining wall footing drain to storm catch basin #15, and the east retaining wall (wall 2) shall connect the retaining wall footing drain to storm catch basin #9 as depicted on the approved civil plans. The applicant and contractor shall comply with the Geotechnical Report (project No. T-8222) prepared by Terra Associates, Inc. for Panattoni Development Company dated July 13, 2020. * Prior to STARTING site work; request inspection for Erosion and Sediment ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. PERMIT CONDITIONS: 1 COMPLY WITH 2018 IFC AND 2018 IBC 2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6 FIRE EXTINGUISHERS REQUIRED PER CODE 7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20220873 Closed Commercial - Tenant Improvement/Remodel
PRFS20221095 Closed Fire Sprinklers
PRSG20221172 Closed Sign/Awning
PRFA20221284 Closed Fire Alarms
PRCTI20221624 Closed Commercial - Tenant Improvement/Remodel
PRCTI20221709 Closed Commercial - Tenant Improvement/Remodel
PRCTI20221916 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFA20230034 Closed Fire Alarms
PRCTI20230167 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFA20230302 Permit(s) Issued Fire Alarms
PRCTI20230447 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCP20230511 Closed Carport
PRFS20230711 Permit(s) Issued Fire Sprinklers
PRCP20230996 Permit(s) Issued Carport
PRCTI20230997 Closed Commercial - Tenant Improvement/Remodel
PRMH20231156 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRFS20231516 Closed Fire Sprinklers
PRFS20240612 In Plan Check Fire Sprinklers
PRCTI20240671 In Plan Check Commercial - Tenant Improvement/Remodel

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.