CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRWF20220381
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $441.19 | $441.19 | Paid | 03/11/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Building Permit Fee | $678.75 | $0.00 | Not payable | Not Paid |
Stormwater Inspection Fee | $260.00 | $0.00 | Not payable | Not Paid |
General Engineering Inspection Fee | $130.00 | $0.00 | Not payable | Not Paid |
Totals: | $1,509.94 | $441.19 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Engineering Commercial Standard Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
Civil Permit E-20-0137
The west retaining wall (wall 1) shall connect retaining wall footing drain to storm catch basin #15, and the east retaining wall (wall 2) shall connect the retaining wall footing drain to storm catch basin #9 as depicted on the approved civil plans.
The applicant and contractor shall comply with the Geotechnical Report (project No. T-8222) prepared by Terra Associates, Inc. for Panattoni Development Company dated July 13, 2020.
* Prior to STARTING site work; request inspection for Erosion and Sediment
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE.
* Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
* No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
PERMIT CONDITIONS:
1 COMPLY WITH 2018 IFC AND 2018 IBC
2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP
3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER
4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED
5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN.
6 FIRE EXTINGUISHERS REQUIRED PER CODE
7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.
|
Reference Number | Status | Type |
---|---|---|
PRCTI20220873 | Closed | Commercial - Tenant Improvement/Remodel |
PRFS20221095 | Closed | Fire Sprinklers |
PRSG20221172 | Closed | Sign/Awning |
PRFA20221284 | Closed | Fire Alarms |
PRCTI20221624 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221709 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221916 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230034 | Closed | Fire Alarms |
PRCTI20230167 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230302 | Closed | Fire Alarms |
PRCTI20230447 | Closed | Commercial - Tenant Improvement/Remodel |
PRCP20230511 | Closed | Carport |
PRFS20230711 | Closed | Fire Sprinklers |
PRCP20230996 | Closed | Carport |
PRCTI20230997 | Closed | Commercial - Tenant Improvement/Remodel |
PRMH20231156 | Closed | Mechanical - COMMERCIAL ONLY |
PRFS20231516 | Closed | Fire Sprinklers |
PRFS20240612 | Closed | Fire Sprinklers |
PRCTI20240671 | Closed | Commercial - Tenant Improvement/Remodel |
PRCCP20241039 | Returned for Correction | Civil Construction Permit |
Date Uploaded | File Type | Name |
---|---|---|
03/11/2022 | Receipt | Receipt for transaction:2022-000479 |
03/28/2022 | 02.03.02_SILTATION FENCE | |
03/28/2022 | 05.02.01_grading, erosion, and sedimentation control notes | |
03/31/2022 | Report | 20705 Calculations (Flattened) |
03/31/2022 | Plans | 20705 Plans (Stamped) |
03/31/2022 | Plans | 20705 Plans (Stamped) |
03/31/2022 | Other | 20705-R-GEOT-2020-07-13-Terra-UNLOCKED (Stamped) |
03/31/2022 | Form | 20705-S-BLDG-2022-02-22-Retaining Wall (Stamped) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView