PRCTI20221916


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20221916
Commercial - Tenant Improvement/Remodel
Permit(s) Issued
IDIL PUYALLUP LLC
Alteration/Remodel
Early installation of powder coat paint booth and conveyor system as part of manufacturing shop tenant improvement in existing warehouse space. Permit application also includes a fire sprinkler evaluation report with recommendations for storage of Group A plastics and the proposed location of plastics storage on the architectural plan. - REVISION 4/10/2023 - ADDED STRUCTURAL DESIGN OF PAINT BOOTH EXHAUST PIPE ROOF PENETRATIONS
12/23/2022
02/24/2023
06/01/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Failed 04/24/2023 04/13/2023
Fire Review Approved 04/24/2023 04/11/2023
Engineering Traffic Review Approved 03/07/2023 02/22/2023
Building Review Approved 03/07/2023 02/22/2023
Planning Review Approved 03/07/2023 02/22/2023
Fire Review Approved 03/07/2023 02/22/2023
Engineering Review Approved 03/07/2023 02/22/2023
Engineering Civil Review VOID 03/07/2023 02/22/2023
Engineering Traffic Review Approved 02/21/2023 02/13/2023
Fire Review Approved 02/21/2023 02/13/2023
Building Review Failed 02/21/2023 02/09/2023
Engineering Review Failed 02/21/2023 02/09/2023
Engineering Civil Review VOID 02/21/2023 02/08/2023
Planning Review Approved 02/21/2023 02/07/2023
Building Review Failed 01/12/2023 01/05/2023
Fire Review Failed 01/12/2023 01/05/2023
Engineering Review Failed 01/12/2023 01/04/2023
Engineering Traffic Review Approved 01/12/2023 01/04/2023
Planning Review Approved 01/12/2023 01/04/2023
Engineering Civil Review Failed 01/18/2023 01/04/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/24/2023
Building Permit Fee $251.25 $251.25 Paid 02/24/2023
Building Plan Review Fee $163.31 $163.31 Paid 12/23/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/24/2023
Resubmittal Fee $130.00 $130.00 Paid 02/06/2023
Resubmittal Fee $130.00 $130.00 Paid 02/18/2023
Water System Development ChargeFee - Tenant Improvment/Addition $5,593.76 $5,593.76 Paid 02/24/2023
Resubmittal Fee $180.00 $180.00 Paid 04/10/2023
Resubmittal Fee $180.00 $180.00 Paid 10/06/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Pending
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Re-Roof Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Cover Inspection/Thrust Blocks Inspection Pending
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Comment Building Div Inspection Partial Pass 5/3/2023 5/3/2023 05/03/2023
Shannon King ((253) 840-6684)
Electric Vehicle Charging Inspection VOID 10/24/2023
Chris Beale ((253) 841-5418)
Fire Final Inspection Partial Pass 11/20/2023 11/22/2023 11/27/2023
Ray Cockerham ((253) 841-5585)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Fire Prevention Standard Conditions
: • Provide plans and permit on site for inspection • Comply with 2018 IBC and IFC • Comply with NFPA codes and standards • Separate permit required for Fire Suppression • Powder coating booth will need to be tied into Fire Alarm system for monitoring • Provide plans and permit on site for inspection • Complete labor and industries inspections prior to requesting city inspection NFPA 33 Operation requirements: • Activate a local alarm in the vicinity of the spraying operation • Transmit an alarm signal to the facility's fire alarm system, if such a system is provided • Shut down the coating material delivery system • Shut down all spray application operations • Stop any conveyors into and out of the spray area Schedule your inspection online through the city of puyallup online permit system after requesting appointment from inspector. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Any and all deferred submittals from City of Puyallup permits B-20-0235, B-21-0386, E-20-0137, PRCTI20220873, and PRCTI20221916 shall be addressed in the PROJECT DESCRIPTION or DEFERRED SUBMITTALS sections of the forthcoming civil and/or building permit applications for the manufacturing facility. A pre-treatment application is required as are civil plans stamped by a qualified Professional Engineer (PMC 14.06). - The 3 Stage Parts Washer is only permitted to connect to City water under permit PRCTI20221916. The 16 water fixture units totaled in the Plumbing Fixture Count Summary were used to calculate and assess water system development fees for PRCTI20221916. The 3 Stage Parts Washer shall not connect to City sanitary sewer at this time. Discharged water shall be pumped and hauled off site for treatment. The sanitary sewer connection for the 3 Stage Parts Washer shall be reviewed under the future manufacturing TI application. The standard CoP Plumbing Fixture Worksheet is not required for this permit since the 3 Stage Parts Washer is not a standard fixture. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. - Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Engineering Division Prior to Occupancy
: The applicant shall contact the Puyallup Water Pollution Control Plant by calling 253-841-5511 to revise the existing pre-treatment/discharge permit and provide an updated report on any potential pollutants. Written approval to proceed with the installation, connection, and use of the proposed manufacturing systems must be obtained from the Puyallup Water Pollution Control Plant prior to resolving this condition. [Yianni Charitou @ 03/12/2024 9:46 AM] Under the direction of Jamie Carter, the pretreatment condition has been resolved as explained in the attached email RE: Pretreatment Streamlining Rule. [Yianni Charitou @ 04/10/2024 7:39 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRRWF20220381 Canceled Retaining Wall
PRCTI20220873 Closed Commercial - Tenant Improvement/Remodel
PRFS20221095 Closed Fire Sprinklers
PRSG20221172 Closed Sign/Awning
PRFA20221284 Closed Fire Alarms
PRCTI20221624 Closed Commercial - Tenant Improvement/Remodel
PRCTI20221709 Closed Commercial - Tenant Improvement/Remodel
PRFA20230034 Closed Fire Alarms
PRCTI20230167 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFA20230302 Permit(s) Issued Fire Alarms
PRCTI20230447 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCP20230511 Closed Carport
PRFS20230711 Permit(s) Issued Fire Sprinklers
PRCP20230996 Permit(s) Issued Carport
PRCTI20230997 Closed Commercial - Tenant Improvement/Remodel
PRMH20231156 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRFS20231516 Closed Fire Sprinklers
PRFS20240612 In Plan Check Fire Sprinklers
PRCTI20240671 In Plan Check Commercial - Tenant Improvement/Remodel