Permit Application Status
PRCTI20221916
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 02/24/2023 |
Building Permit Fee | $251.25 | $251.25 | Paid | 02/24/2023 |
Building Plan Review Fee | $163.31 | $163.31 | Paid | 12/23/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 02/24/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/06/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/18/2023 |
Water System Development ChargeFee - Tenant Improvment/Addition | $5,593.76 | $5,593.76 | Paid | 02/24/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/10/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 10/06/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $6,918.32 | $6,918.32 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Partial Pass | 5/3/2023 | 5/3/2023 | 05/03/2023 |
Shannon King ((253) 840-6684) | ||||
Electric Vehicle Charging Inspection | VOID | 10/24/2023 | ||
Chris Beale ((253) 841-5418) | ||||
Fire Final Inspection | Partial Pass | 11/20/2023 | 11/22/2023 | 11/27/2023 |
Ray Cockerham ((253) 841-5585) | ||||
Planning Final Inspection | VOID | 07/15/2024 | ||
Nabila Comstock ((253) 770-3361) | ||||
Comment Engineering Div Inspection | VOID | 07/23/2024 | ||
Jeff Hill ((253) 204-5633) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 07/23/2024 | ||
Jeff Hill ((253) 204-5633) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Fire Prevention | Standard Conditions | ||
:
• Provide plans and permit on site for inspection
• Comply with 2018 IBC and IFC
• Comply with NFPA codes and standards
• Separate permit required for Fire Suppression
• Powder coating booth will need to be tied into Fire Alarm system for monitoring
• Provide plans and permit on site for inspection
• Complete labor and industries inspections prior to requesting city inspection
NFPA 33 Operation requirements:
• Activate a local alarm in the vicinity of the spraying operation
• Transmit an alarm signal to the facility's fire alarm system, if such a system is provided
• Shut down the coating material delivery system
• Shut down all spray application operations
• Stop any conveyors into and out of the spray area
Schedule your inspection online through the city of puyallup online permit system after requesting appointment from inspector. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
- Any and all deferred submittals from City of Puyallup permits B-20-0235, B-21-0386, E-20-0137, PRCTI20220873, and PRCTI20221916 shall be addressed in the PROJECT DESCRIPTION or DEFERRED SUBMITTALS sections of the forthcoming civil and/or building permit applications for the manufacturing facility. A pre-treatment application is required as are civil plans stamped by a qualified Professional Engineer (PMC 14.06).
- The 3 Stage Parts Washer is only permitted to connect to City water under permit PRCTI20221916. The 16 water fixture units totaled in the Plumbing Fixture Count Summary were used to calculate and assess water system development fees for PRCTI20221916. The 3 Stage Parts Washer shall not connect to City sanitary sewer at this time. Discharged water shall be pumped and hauled off site for treatment. The sanitary sewer connection for the 3 Stage Parts Washer shall be reviewed under the future manufacturing TI application. The standard CoP Plumbing Fixture Worksheet is not required for this permit since the 3 Stage Parts Washer is not a standard fixture.
- All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation.
- Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Occupancy | ||
:
The applicant shall contact the Puyallup Water Pollution Control Plant by calling 253-841-5511 to revise the existing pre-treatment/discharge permit and provide an updated report on any potential pollutants. Written approval to proceed with the installation, connection, and use of the proposed manufacturing systems must be obtained from the Puyallup Water Pollution Control Plant prior to resolving this condition. [Yianni Charitou @ 03/12/2024 9:46 AM]
Under the direction of Jamie Carter, the pretreatment condition has been resolved as explained in the attached email RE: Pretreatment Streamlining Rule. [Yianni Charitou @ 04/10/2024 7:39 AM]
|
Reference Number | Status | Type |
---|---|---|
PRRWF20220381 | Canceled | Retaining Wall |
PRCTI20220873 | Closed | Commercial - Tenant Improvement/Remodel |
PRFS20221095 | Closed | Fire Sprinklers |
PRSG20221172 | Closed | Sign/Awning |
PRFA20221284 | Closed | Fire Alarms |
PRCTI20221624 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221709 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230034 | Closed | Fire Alarms |
PRCTI20230167 | Closed | Commercial - Tenant Improvement/Remodel |
PRFA20230302 | Closed | Fire Alarms |
PRCTI20230447 | Closed | Commercial - Tenant Improvement/Remodel |
PRCP20230511 | Closed | Carport |
PRFS20230711 | Closed | Fire Sprinklers |
PRCP20230996 | Closed | Carport |
PRCTI20230997 | Closed | Commercial - Tenant Improvement/Remodel |
PRMH20231156 | Closed | Mechanical - COMMERCIAL ONLY |
PRFS20231516 | Closed | Fire Sprinklers |
PRFS20240612 | Closed | Fire Sprinklers |
PRCTI20240671 | Closed | Commercial - Tenant Improvement/Remodel |
PRCCP20241039 | Returned for Correction | Civil Construction Permit |
Date Uploaded | File Type | Name |
---|---|---|
02/06/2023 | Receipt | Receipt for transaction:2023-000172 |
02/18/2023 | Receipt | Receipt for transaction:2023-000256 |
02/23/2023 | Plans | Red Dot Shop TI - Paint Booth Install Plumbing Set 2 (Stamped) |
02/23/2023 | Plans | Red Dot Shop TI - Paint Booth Install Resubmit Set 2 (Stamped) |
02/24/2023 | Letter | Permit - Detailed |
02/24/2023 | Receipt | Receipt for transaction:2023-000287 |
04/10/2023 | Receipt | Receipt for transaction:2023-000596 |
04/14/2023 | Letter | Permit Review Correction Letter |
04/14/2023 | Plans | Red Dot Shop TI - Paint Booth Install Resubmit Set 5 (Flattened) |
04/14/2023 | Report | Red Dot Shop TI - Paint Booth Install Roof Pens Structural Calcs (Flattened) |
05/03/2023 | Report | Inspection Report (Comment Building Div Inspection) |
05/07/2024 | Letter | Permit Expiration Notice |
09/05/2023 | Letter | Permit Expiration Notice |
10/06/2023 | Receipt | Receipt for transaction:2023-001926 |
12/23/2022 | Receipt | Receipt for transaction:2022-002484 |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.