Summary

PRDE20221364
Demolition
Closed
TROLSON NORMAN K
Demolition
Demolition of a wood framed house and shed including the foundation. septic will be pumped, crushed and filled, asbestos will be removed. (1042 VALLEY AVE NW)STOP WORK ORDER generated on 10/24/2022 by username 'Cheryl Trimble'.STOP WORK ORDER removed on 11/14/2022 by username 'Jeff Hill'.
09/02/2022
10/17/2022
08/09/2023
02/10/2023

Locations

Property
0420163077

Address
1042 VALLEY AVE NW, PUYALLUP, WA 98371

1042 VALLEY AVE NW, PUYALLUP, WA 98371

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 10/23/2022 10/17/2022
Engineering Review Approved 10/23/2022 10/17/2022
Planning Review Approved 10/23/2022 10/14/2022
Planning Review Approved 09/21/2022 09/21/2022
Engineering Review Failed 09/21/2022 09/09/2022
Building Review Failed 09/21/2022 09/08/2022

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection VOID 10/24/2022
Cheryl Trimble ((253) 290-9834)
Utility Capping Inspection Not Ready 10/24/2022 10/24/2022 10/24/2022
Michael Rosenau ((253) 344-6753)
decommissioning
Resolved
11/14/2022
1) Provide decommissioning cert. for septic system from TPCHD.

Other/Miscellaneous
Carried Forward
11/14/2022
1) Decommission heating oil tank.

decommissioning
Resolved
10/26/2022
1) Provide decommissioning cert. for private water well.

Engineering Final Inspection Not Ready 10/31/2022 10/31/2022 10/31/2022
Jeff Hill ((253) 204-5633)
Engineering Final Inspection Failed 11/14/2022 11/14/2022 11/14/2022
Jeff Hill ((253) 204-5633)
Other/Miscellaneous
Carried Forward
11/14/2022
remove silt fence

Other/Miscellaneous
Carried Forward
11/14/2022
Provide a PROVIDE DECOMMISSIONING REPORT and close permit PRUST20221681

Demolition Final Inspection Not Ready 10/31/2022 11/28/2022 11/28/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
11/28/2022
1. provide engineering final prior to building final 2. not ready

Comment Engineering Div Inspection VOID 12/07/2022
Jeff Hill ((253) 204-5633)
Comment Engineering Div Inspection VOID 12/07/2022
Jeff Hill ((253) 204-5633)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Resolved Standard Conditions
: Development Engineering standard demolition conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** 1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. Refer to the Stormwater Fact Sheet and City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. ** Attached in CityView ** 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: ** The applicant is responsible to demolish the existing private well per Pierce County Health Department Requirements. A decommissioning certificate is required to be filed with Pierce County and a copy shall be provided to the City of Puyallup. If the well is to remain for irrigation purposes a Reduced Pressure Backflow Assembly is required. See the attached City of Puyallup Standard Detail 03.04.02 ** ** The applicant is responsible to demolish the existing septic system per Tacoma Pierce County Health Department standards. A septic decommissioning certificate is required to be filed with Pierce County and a copy submitted to the City of Puyallup. ** ** Any future development of this site will be required to connect to city water. The new water service will meet all current city standards. This will include both a water meter and service line.** I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Open Planning Division Standard Conditions
: Demolition or clearing area is located in proximity a known or suspected critical area. Demolition or clearing must be limited to within 5 ft of all structes and a high visibility fence shall be erected along this perimeter. Please refer to the high visibility fencing detail available for download at: www.cityofpuyallup.org/DocumentCenter/View/13730/Tree-Protection-Detail?bidId=
Miscellaneous Condition Open Building Division Standard Conditions
: Will need letters for decommissioning the well and septic systems from Tacoma/Pierce County health department prior to final.

Related Permit & Planning Applications

Reference Number Status Type
PRAMR20221054 Closed Alternative Methods / Materials Request
PRCCP20231180 Permit(s) Issued Civil Construction Permit
PRSC20241750 Permit(s) Issued Utility Service Connection
PLPRE20210002 File Closed Pre-Application
PLPSP20220137 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
09/21/2022 Form PER APP1 (Flattened)
09/21/2022 Letter Permit Review Comment Notice
10/12/2022 Other Invoice #66197001
10/12/2022 Form PU PERMIT APP R2
10/12/2022 Other TPCHD EMAIL
10/17/2022 Plans 1042 REV SITE PLAN 10-1-22 R1 (Stamped)
10/17/2022 Other LTR OF COMP (Stamped)
10/17/2022 Permit Permit - Detailed
10/17/2022 Letter Permit Job Card
10/17/2022 Other PSCLAIR DEMO (Stamped)
10/17/2022 Plans SEDIMENT AND EROSION CONTROL 02.03.02 (Stamped)
10/24/2022 Report Inspection Report (Utility Capping Inspection)
11/14/2022 Report Inspection Report (Engineering Final Inspection)
11/28/2022 Report Inspection Report (Demolition Final Inspection)