Summary

PLPSP20220137
Valley Avenue Yard
Preliminary Site Plan
Preliminary Site Plan
Waiting for Conditions
08/22/2022
TROLSON GERALDINE M
Proposed Outdoor Storage Yard use for truck/trailer parking on a combined 73,937 square foot site. No new structures or buildings proposed. Project site to be cleared, graded, paved, improved and landscaped/screened.

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review No Comments 05/15/2023 05/26/2023
Planning Review No Comments 05/15/2023 05/19/2023
Fire Review No Comments 05/15/2023 05/15/2023
Building Review No Comments 05/15/2023 05/11/2023
Engineering Review No Comments 05/15/2023 05/09/2023
Building Review Revisions Required 11/06/2022 11/03/2022
Planning Review Revisions Required 11/06/2022 11/01/2022
Engineering Review Revisions Required 11/06/2022 11/01/2022
Engineering Traffic Review Revisions Required 11/06/2022 11/01/2022
Fire Review Revisions Required 11/06/2022 11/01/2022

Fees

Paid Fees Amount Paid Owing Date Paid
SEPA Checklist Fee (with planning permit) $250.00 $250.00 Paid 08/23/2022
Preliminary Site Plan Fee $1,890.00 $1,890.00 Paid 08/23/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Application(s) will not be processed until outstanding fees have been paid in full.

$0.00

Meetings

There are no hearings for this planning application.

Conditions

Condition Status Department Category Expiration Date Due Date
Sign Posted On Site Resolved Planning Division Public Noticing
: Sign Posted On Site must be provided.
Signed Affidavit Resolved Planning Division Public Noticing
: Signed Affidavit must be provided.
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: Due to land disturbing activities that exceed one acre this project is required to apply for a Construction Stormwater General Permit from the Washington State Department of Ecology.
Miscellaneous Condition Resolved Engineering Division Standard Conditions
:
Miscellaneous Condition Open Building Division Submit With Building Permit Application
: Separate permit would be required for the 8' high fences shown on site plans. And as indicated in pre-app notes for PLPRE2021002 separate permits would be required for all the demolition of the houses and for the changing the one building into an office. See those notes.
Miscellaneous Condition Open Planning Division Submit With Building Permit Application
: Additional Submittal Item Required: If exterior changes are proposed to the existing buildings on site, Industrial Design Review application (to be included with your building permit application) will be required. Your project is subject to administrative design review for industrial style buildings see PMC 20.26.400 for specific design standards. Since this is an administrative process, your design submittal will be reviewed by the Director or designee who will approve, approve with conditions, or deny your design. Your design review application must be submitted as a supplemental form with your building permit application. Please contact case planner for application form.
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: Provide all details of water and dry utility improvements with civil permit.
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: Provide confirmation of water well and septic drain field decommissioning with civil submittal.
Miscellaneous Condition Resolved Engineering Division Submit With Civil Permit Application
: The review and negotiation of the Liscensing Agreement to retain the ramp in the right of way shall be completed during civil review. In the meantime the City will reveiw the draft, including legal review, and provide commnets during the 1st submittal of the civil plans.

Related Permit & Planning Applications

Reference Number Status Type
PRAMR20221054 Closed Alternative Methods / Materials Request
PRDE20221364 Closed Demolition
PRCCP20231180 Permit(s) Issued Civil Construction Permit
PLPRE20210002 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
11/08/2022 Other 2022_01_31 Puyallup Pre App Notes (Flattened)
08/22/2022 Other 2022_07_13 Geotech Report
08/22/2022 Other 2022_08_04 Tree Risk Assessment
03/31/2023 Plans 2023_03_31 Revised Prelim Site Plan - Full Plan Set
11/08/2022 Form 2022_08_22 Industrial DR App (Flattened)
11/08/2022 Other 2022_08_22 Industrial DR App0 (Flattened)
08/22/2022 Drawing 2022_07_28 Prelim LS Plans
03/31/2023 Form 2023_03_28 ValleyAveYard Traffic Scoping Update
03/31/2023 Form 2023_03_31 Revised SEPA Checklist Valley Ave Yard
03/31/2023 Study 2023_03_31 Revised Prelim Drainage Report Valley Ave
08/22/2022 Form 2022_07_08 Critical Area ID form
11/08/2022 Map 2022_08_18 Valley Ave Vicinity Map (Flattened)
03/31/2023 Plans 2023_03_31 Revised Prelim Site Plan Valley Ave
11/08/2022 Form 2022_08_22 Prelim SPR App (Flattened)
08/23/2022 Receipt Receipt for transaction:2022-001655
09/22/2022 Letter Application Accepted Letter
10/04/2022 AFFIDAVIT OF NOTICE
11/08/2022 Letter DRT Letter
03/31/2023 Other 2007_09_10 Previous BLD Permit #21320 Docs
03/31/2023 Other 2023_03_28 Valley Ave Septic Inspection Report
03/31/2023 Other 2023_03_30 Valley Ave ROW Ramp Lic Agreement Draft
03/31/2023 Other 2023_03_31 Valley Ave Yard SPR - Comm Response Letter #1
04/03/2023 Drawing 2023_03_22 Revised Prelim LS Plans 21-248
04/03/2023 Map 2023_03_23 Revised Valley Ave Vicinity Map
06/01/2023 Letter Final DRT Letter
06/29/2023 Letter SEPA Determination
07/03/2023 Letter SEPA NOD_Legal Notice to TNT (Generate SEPA NOD Legal Notice To TNT)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.