CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRMU20241695


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMU20241695
Residential - New Multi-Unit
In Plan Check
DOCE LLC
New
Construction of a three-story, 24 unit apartment building.~ 2ND STREET APARTMENTS
10/31/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Pending 01/29/2025
Engineering Review Pending 01/29/2025
Engineering Traffic Review Pending 01/29/2025
Fire Review Pending 01/29/2025
Planning Review Pending 01/29/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $10,763.19 $10,763.19 Paid 11/01/2024
Plumbing Plan Review Fee $1,758.25 $1,758.25 Paid 11/01/2024
Mechanical Plan Review Fee $936.46 $936.46 Paid 11/01/2024
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Planning Landscape Review Fee $300.00 $0.00 Not payable Not Paid
Appliance Vent - Separate Fee $230.40 $0.00 Not payable Not Paid
Exhaust Hood/Range Hood - Residential Fee $338.40 $0.00 Not payable Not Paid
Exhaust Vent Fan (Bath) Fee $831.90 $0.00 Not payable Not Paid
Building Permit Fee $16,558.75 $0.00 Not payable Not Paid
Planning Building Permit Fee $120.00 $0.00 Not payable Not Paid
Garbage Disposal Fee $13.00 $0.00 Not payable Not Paid
Plumbing Permit Fee $40.00 $0.00 Not payable Not Paid
Plumbing Fixtures Fee $2,340.00 $0.00 Not payable Not Paid
Water Heater Fee $312.00 $0.00 Not payable Not Paid
Mechanical Permit Fee $40.00 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Residential) $52.50 $0.00 Not payable Not Paid
Traffic Impact Fee (Commercial) $55,080.00 $0.00 Not payable Not Paid
Park Impact Fee $60,413.62 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk, and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Water meter box grade may have to be adjusted, at owners’ expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). - Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)). - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f). - No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
Ready to Issue - Need Contractor Info Open Development & Permitting Services Prior to Issuance
: Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM]
Ready to Issue - Need Business License Endorsement Open Development & Permitting Services Prior to Issuance
: Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM]
Miscellaneous Condition Open Traffic Division Prior to Completion
: The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. Multi-family Low Rise land use code 220 has a pm peak hour trip rate of 0.51 trips per unit. 24 units x 0.51 = 12.24 pm trips x $4500 = $55,080
Miscellaneous Condition Open Traffic Division Prior to Completion
: Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size: Park Impact Fee (Per residential dwelling Unit): Less than 500 sqft $1,560.05 500 - 999 sqft $2,313.53 1,000 – 1,999 sqft $3,291.31 2,000 sqft or more $4,017.30 19 units (500-999 sqft) x 2313.53 = $43,957.07 5 units (1000-1999 sqft) x 3291.31 = $16,456.55 Total park impact fee for 24 units is $60,413.62

Related Permit & Planning Applications

Reference Number Status Type
E-20-0206 Closed Water or Sewer Adequacy (for FOOD SERVICE ESTABLISHMENTS)
E-21-0570 Closed Alternative Methods / Materials Request
E-21-0571 Closed Alternative Methods / Materials Request
PRMU20220123 Canceled Residential - New Multi-Unit
PRCCP20240232 Ready for Issuance Civil Construction Permit
PRGR20241271 Closed Clear, Fill, & Grade Permit
P-21-0008 File Closed Preliminary Site Plan
P-19-0101 Expired Pre-Application
PLZNA20220126 File Closed Administrative Adjustment

Documents & Images

Date Uploaded File Type Name
11/01/2024 Receipt Receipt for transaction:2024-002277
11/04/2024 Letter Incomplete Application Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.