CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRMU20241695
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 04/11/2025 |
Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 04/11/2025 |
Appliance Vent - Separate Fee | $230.40 | $230.40 | Paid | 04/11/2025 |
Exhaust Hood/Range Hood - Residential Fee | $338.40 | $338.40 | Paid | 04/11/2025 |
Exhaust Vent Fan (Bath) Fee | $831.90 | $831.90 | Paid | 04/11/2025 |
Building Permit Fee | $16,558.75 | $16,558.75 | Paid | 04/11/2025 |
Planning Building Permit Fee | $120.00 | $120.00 | Paid | 04/11/2025 |
Garbage Disposal Fee | $13.00 | $13.00 | Paid | 04/11/2025 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 04/11/2025 |
Plumbing Fixtures Fee | $2,340.00 | $2,340.00 | Paid | 04/11/2025 |
Water Heater Fee | $312.00 | $312.00 | Paid | 04/11/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 04/11/2025 |
Building Plan Review Fee | $10,763.19 | $10,763.19 | Paid | 11/01/2024 |
Plumbing Plan Review Fee | $1,758.25 | $1,758.25 | Paid | 11/01/2024 |
Mechanical Plan Review Fee | $936.46 | $936.46 | Paid | 11/01/2024 |
WA State Building Code Council Fee (Residential) | $52.50 | $52.50 | Paid | 04/14/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 02/07/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/26/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/11/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Traffic Impact Fee (Commercial) | $55,080.00 | $0.00 | $55,080.00 | Not Paid |
Park Impact Fee | $60,413.62 | $0.00 | $60,413.62 | Not Paid |
Water System Development Charge | $98,396.46 | $0.00 | $98,396.46 | Not Paid |
Sewer System Development Charge | $119,629.73 | $0.00 | $119,629.73 | Not Paid |
Totals: | $368,959.66 | $35,439.85 | $333,519.81 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$333,519.81 Add Fees to My Cart
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | Pending | |||
Underfloor Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Block Wall Rebar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Gas Test Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Shower Pan Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Final Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Building Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Erosion And Sediment Inspection | Pending | |||
Energy (Insulation) Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Plumbing Below Slab Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Water Service Inspection | Pending | |||
Storm Inspection | Pending | |||
Erosion And Sediment Inspection | Partial Pass | 4/15/2025 | 04/15/2025 | |
Jason Little ((253) 244-0387) | ||||
Footing/Setback Inspection | Failed | 4/21/2025 | 4/21/2025 | 04/21/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/21/2025
1 ; provide geo-tech approval report for soil bearing of 2,000 psf.
2 ; provide special inspection report at time of inspection.
3 ; provide approved site plans showing min. setbacks.
|
||||
Footing/Setback Inspection | Passed | 4/22/2025 | 4/22/2025 | 04/22/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/22/2025
1 ; provide geo-tech approval report for soil bearing of 2,000 psf.
2 ; provide special inspection report at time of inspection.
3 ; provide approved site plans showing min. setbacks.
|
||||
Foundation/Rebar Inspection | Passed | 4/25/2025 | 4/25/2025 | 04/25/2025 |
Shannon King ((253) 840-6684) | ||||
Storm Inspection | Partial Pass | 4/29/2025 | 04/29/2025 | |
Jason Little ((253) 244-0387) | ||||
Slab/Insulation Inspection | Passed | 4/30/2025 | 4/30/2025 | 04/30/2025 |
Ted Christie ((253) 507-0191) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control.
- Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow.
- Steps shall be taken to prevent drainage onto adjacent lots.
- All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District.
- Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection.
- Water meter box grade may have to be adjusted, at owners’ expense, due to the grade of the proposed driveway.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07:
(For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums.
(For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade).
- Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)).
- If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities.
- No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
- No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
|
||
Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM]
RECEIVED EMAIL STATING DOCE LLC W/B CONTRACTOR [Jeannesha Frazier @ 04/14/2025 3:10 PM]
|
||
Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM]
RECEIVED EMAIL STATING DOCE LLC W/B CONTRACTOR [Jeannesha Frazier @ 04/14/2025 3:09 PM]
|
||
Miscellaneous Condition | Open | Prior to Completion |
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition.
Multi-family Low Rise land use code 220 has a pm peak hour trip rate of 0.51 trips per unit. 24 units x 0.51 = 12.24 pm trips x $4500 = $55,080
|
||
Miscellaneous Condition | Open | Prior to Completion |
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size:
Park Impact Fee (Per residential dwelling Unit):
Less than 500 sqft $1,560.05
500 - 999 sqft $2,313.53
1,000 – 1,999 sqft $3,291.31
2,000 sqft or more $4,017.30
19 units (500-999 sqft) x 2313.53 = $43,957.07
5 units (1000-1999 sqft) x 3291.31 = $16,456.55
Total park impact fee for 24 units is $60,413.62
|
||
Fire Review Conditions | Open | Standard Conditions |
Fire Prevention
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
Backflow Protection Device - Commercial DCVA | Open | Prior to Completion |
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Payment of Deferred Impact Fees | Open | Prior to Completion |
Development & Permitting Services
Payment of Deferred Impact Fees must be paid within 18 months of permit issuance or prior to scheduling Final Building Inspection (which ever comes first).
|
||
Ready to Issue - Need School District Letter | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid.
RECEIVED 4.14.25 [Jeannesha Frazier @ 04/14/2025 12:48 PM] .
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
MUST RECEIVE IMPACT FEE DEFERRAL DOCUMENTS THAT HAVE BEEN NOTARIZED AND RECORDED BY PIERCE COUNTY.
[Jeannesha Frazier @ 04/11/2025 7:58 AM]
|
Reference Number | Status | Type |
---|---|---|
E-20-0206 | Closed | Water or Sewer Adequacy (for FOOD SERVICE ESTABLISHMENTS) |
E-21-0570 | Closed | Alternative Methods / Materials Request |
E-21-0571 | Closed | Alternative Methods / Materials Request |
PRMU20220123 | Canceled | Residential - New Multi-Unit |
PRCCP20240232 | Permit(s) Issued | Civil Construction Permit |
PRGR20241271 | Closed | Clear, Fill, & Grade Permit |
PRFS20250509 | In Plan Check | Fire Sprinklers |
P-21-0008 | File Closed | Preliminary Site Plan |
P-19-0101 | Expired | Pre-Application |
PLZNA20220126 | File Closed | Administrative Adjustment |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.