CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-20-0741


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0741
Residential - New Single Family Dwelling
Permit(s) Issued
FARRIS RICHARD A & KATHY L
New
NEW SFR - PERMIT RENEWED, PAID FEES
09/22/2020
08/23/2023
03/29/2026

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 07/27/2023 07/27/2023
Planning Review Approved 07/27/2023 07/24/2023
Engineering Review Approved 07/27/2023 07/21/2023
Engineering Storm Review Approved 07/27/2023 07/18/2023
Fire Review Approved 07/27/2023 07/17/2023
Fire Review Approved 05/05/2023 05/01/2023
Engineering Storm Review Failed 05/05/2023 04/28/2023
Building Review Failed 05/05/2023 04/28/2023
Engineering Review Failed 05/05/2023 04/28/2023
Planning Review Approved 05/05/2023 04/25/2023
Planning Review Approved 12/31/2022 01/06/2023
Engineering Review Failed 12/31/2022 12/29/2022
Engineering Storm Review Failed 01/06/2023 12/28/2022
Building Review Approved 12/31/2022 12/22/2022
Fire Review Approved 12/31/2022 12/22/2022
Building Review Approved 10/25/2021
Engineering Review Comments 10/07/2021
Fire Review Approved 12/10/2020
Building Review Incomplete 11/20/2020
Building Review Incomplete 11/03/2020
Planning Review In Progress 11/02/2020
Engineering Review Comments 10/28/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Planning Review Fee $2,219.26 $2,219.26 Paid 10/08/2020
No
Building Permit Fee $3,414.25 $3,414.25 Paid 08/22/2023
Mechanical Permit Fee $179.60 $179.60 Paid 08/22/2023
$40.00
Plumbing Permit Fee $580.00 $580.00 Paid 08/22/2023
$40.00
Planning Review Fee $30.00 $30.00 Paid 08/22/2023
Mechanical Plan Review Fee $116.74 $116.74 Paid 08/22/2023
WA State Building Code Council Fee (Residential) $6.50 $6.50 Paid 08/22/2023
Plumbing Plan Review Fee $377.00 $377.00 Paid 08/22/2023
Building Division Fee (Hourly) $180.00 $180.00 Paid 08/22/2023
Stormwater Report Review Fee $360.00 $360.00 Paid 08/22/2023
Traffic Impact Fee (SFR/ADU) $4,230.00 $4,230.00 Paid 08/22/2023
Water System Development Charge $5,218.00 $5,218.00 Paid 08/22/2023
Water Connection Fee $4,680.00 $4,680.00 Paid 08/22/2023
Storm System Development Charge $4,013.00 $4,013.00 Paid 08/22/2023
Park Impact Fee $4,017.30 $4,017.30 Paid 08/22/2023
Resubmittal Fee $180.00 $180.00 Paid 04/21/2023
Stormwater Inspection Fee $360.00 $360.00 Paid 08/22/2023
Resubmittal Fee $180.00 $180.00 Paid 07/11/2023
Miscellaneous Fee $235.50 $235.50 Paid 08/22/2023
$180.00
Miscellaneous Fee $207.50 $207.50 Paid 08/22/2023
$180.00
Miscellaneous Fee $208.50 $208.50 Paid 08/22/2023
$180.00
Miscellaneous Fee $208.50 $208.50 Paid 08/22/2023
$180.00
Building Permit Fee $1,707.13 $1,707.13 Paid 09/30/2025
$3,414.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Slab/Insulation Inspection Pending
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Engineering Final Inspection Pending
Comment Building Div Inspection Pending
Monty Johnson ((253) 770-3326)
Frame Inspection Pending
Monty Johnson ((253) 770-3326)
Residential Final Inspection Pending
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
09/29/2025
1. Provide engineering final prior to building final. 2. Plumbing final at time of building final.

Plumbing Final Inspection Pending
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
09/29/2025
1. Provide engineering final prior to building final. 2. Plumbing final at time of building final.

Carbon Monoxide Detectors Inspection Pending
Monty Johnson ((253) 770-3326)
Sidesewer Inspection Pending
Erosion And Sediment Inspection Not Ready 5/9/2024 (1:00 to 2:00) 5/9/2024 05/09/2024
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Partial Pass 8/6/2024 8/6/2024 08/06/2024
Jason Little ((253) 244-0387)
Footing/Setback Inspection Not Ready 8/12/2024 8/12/2024 08/12/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/12/2024
cancelled by contractor

Erosion And Sediment Inspection Partial Pass 8/20/2024 8/20/2024 08/20/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/20/2024
- Silt fence along west side may need to be extended east a few feet. We will take a look after grading has been completed. - Silt fence along east side may need to be added. After grading and SFR import we will need to take a look. - Protect new septic tanks. - No track out. Maintain rock cleanliness during the wet months. - No stock piles where dispersion trenches belong.

Foundation/Rebar Inspection Passed 8/20/2024 8/20/2024 08/20/2024
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Passed 8/20/2024 8/20/2024 08/20/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
08/20/2024
received geo tech report

Erosion And Sediment Inspection Not Ready 8/27/2024 8/27/2024 08/27/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/27/2024
- Silt fence along west side may need to be extended east a few feet. We will take a look after grading has been completed. - Silt fence along east side may need to be added. After grading and SFR import we will need to take a look. - Protect new septic tanks. - No track out. Maintain rock cleanliness during the wet months. - No stock piles where dispersion trenches belong.

Storm Inspection Partial Pass 8/27/2024 08/27/2024
Jason Little ((253) 244-0387)
Underfloor Inspection Passed 9/5/2024 9/5/2024 09/05/2024
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Passed 9/30/2024 9/30/2024 09/30/2024
Kevin Spruell ((253) 841-5590)
Water Service Inspection Not Ready 10/10/2024 10/10/2024 10/10/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Failed 10/10/2024 10/10/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
10/10/2024
- Silt fence along west side may need to be extended east a few feet. We will take a look after grading has been completed. - Silt fence along east side may need to be added. After grading and SFR import we will need to take a look. - Protect new septic tanks. - No track out. Maintain rock cleanliness during the wet months. - No stock piles where dispersion trenches belong.

Water Service Inspection Passed 10/10/2024 10/10/2024
Jeff Hill ((253) 204-5633)
Plumbing Rough In Inspection Passed 10/10/2024 10/10/2024 10/10/2024
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Not Ready 10/14/2024 10/14/2024 10/14/2024
Shannon King ((253) 840-6684)
Storm Inspection Partial Pass 12/3/2024 12/3/2024 12/03/2024
Jason Little ((253) 244-0387)
Comment Building Div Inspection Not Ready 12/19/2024 12/19/2024 12/19/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/19/2024
unsure nature of insp

Energy (Insulation) Inspection Not Ready 1/10/2025 1/10/2025 01/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/10/2025
no insulation at this time, frame has not been approved

Frame Inspection Failed 1/10/2025 1/10/2025 01/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/10/2025
1:install gas pipe. 2:tighten all holdown nuts 3:provide electrical approval 4:install exhaust fan ducts not ready,

Frame Inspection Failed 1/22/2025 1/22/2025 01/22/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/22/2025
1:complete range fan duct 2:firestop under tub/shower 3:gas test approved at 5 psi. ok to insulate

Energy (Insulation) Inspection Passed 1/28/2025 1/28/2025 01/28/2025
Monty Johnson ((253) 770-3326)
Shower Pan Inspection Passed 4/18/2025 4/18/2025 04/18/2025
Monty Johnson ((253) 770-3326)
Erosion And Sediment Inspection Partial Pass 6/20/2025 6/20/2025 06/20/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
06/20/2025
- Silt fence along west side may need to be extended east a few feet. We will take a look after grading has been completed. - Silt fence along east side may need to be added. After grading and SFR import we will need to take a look. - Protect new septic tanks. - No track out. Maintain rock cleanliness during the wet months. - No stock piles where dispersion trenches belong.

Fire Final Inspection Passed 8/12/2025 8/14/2025 08/14/2025
David Drake ((253) 864-4171)
Fire Sprinkler Cover Inspection VOID 08/14/2025
David Drake ((253) 864-4171)
Fire Sprinkler Final Inspection VOID 08/14/2025
David Drake ((253) 864-4171)
Comment Engineering Div Inspection VOID 09/16/2025
Jason Little ((253) 244-0387)
Soil Amendment Inspection VOID 09/16/2025
Jason Little ((253) 244-0387)
Frontage/Driveway Inspection Passed 9/16/2025 09/16/2025
Jason Little ((253) 244-0387)
Service Backflow Inspection VOID 09/16/2025
Jason Little ((253) 244-0387)
Storm Inspection Passed 9/16/2025 09/16/2025
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Passed 9/16/2025 9/16/2025 09/16/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
09/16/2025
- Silt fence along west side may need to be extended east a few feet. We will take a look after grading has been completed. - Silt fence along east side may need to be added. After grading and SFR import we will need to take a look. - Protect new septic tanks. - No track out. Maintain rock cleanliness during the wet months. - No stock piles where dispersion trenches belong.

Residential Final Inspection Not Ready 9/29/2025 9/29/2025 09/29/2025
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/29/2025
1. Provide engineering final prior to building final. 2. Plumbing final at time of building final.

Plumbing Final Inspection Not Ready 9/29/2025 9/29/2025 09/29/2025
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/29/2025
1. Provide engineering final prior to building final. 2. Plumbing final at time of building final.

Carbon Monoxide Detectors Inspection Not Ready 9/29/2025 9/29/2025 09/29/2025
James LaVergne ((253) 841-5590)
Sidesewer Inspection Not Ready 9/29/2025 9/30/2025 09/30/2025
Jason Little ((253) 244-0387)

Conditions

Condition Status Category
General Permit Conditions Open Standard Conditions
Development & Permitting Services
PERMIT CONDITIONS:
Engineering Residential Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard residential conditions: - The contractor shall take caution not to damage the storm pump line from 1030 23RD ST NW to W STEWART as the exact location cannot be verified. - All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal. - Prior to starting site work, request an erosion and sediment inspection through the CityView portal. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. - Stormwater control of roof downspouts shall be controlled as approved by the City. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. Any public curb, gutter, or sidewalk broken now or during the course of construction shall be removed and replaced per City Standards. - Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage per City standards. - Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup. - The water meter box and/or water service may need to be relocated or adjusted, at owner's expense, to accommodate for site and grade changes. The new location and grade must be approved by the City of Puyallup. The water meter box shall not be located in hard surfaces. - Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Pipeline Notfication Rcw 19.122.033 Open Standard Conditions
Development & Permitting Services
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Plat Conditions Resolved Prior to Occupancy
Engineering Division
Applicable plat conditions per SP AFN 201902055001 resolved under civil permit E-16-0234. No building permits will be issued for the lots within this subdivision until such time as code required street improvements are designed by the property owner and approved by the city along the frontage of both lots 1 and 2. Improvements shall include curb, gutter, sidewalk, asphalt, drainage, and streetlighting. Occupancy for new construction will not be allowed for the lots within this subdivision until such time as the required street improvements along the frontage of both lots 1 and 2 are constructed by the property owner and approved by the City. [Yianni Charitou @ 12/28/2022 12:43 PM]
Frontage Improvements - Residential Infill Lot Resolved Prior to Issuance
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, residential infill lot projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) are required to complete improvements along the property's street frontage. Frontage improvements constructed and approved under civil permit E-16-0234.
FEMA Floodplain - Levee Seclusion Zone Open Standard Conditions
Engineering Division
The subject property is located within a FEMA designated Levee Seclusion Zone which is an area currently being studied for potential flood hazards by FEMA. Although the proposed construction is not required to incorporate specific flood protection measures under current floodplain regulations, the applicant should contemplate incorporating flood control measures (elevating, venting, anchoring, etc.) in anticipation of this area being mapped into a regulated flood zone in the future.
Stormwater Maintenance Agreement (SWA) Resolved Prior to Occupancy
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
The applicant shall coordinate and pay the water turn-on fee with City of Puyallup Utility Billing by contacting them at copbilling@puyallupwa.gov, 253-841-5550, or by visiting City Hall. [Yianni Charitou @ 12/29/2022 8:20 AM]
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
The access, water, and storm drainage covenant easements must be recorded and received by the City prior to permit issuance. [Yianni Charitou @ 07/21/2023 8:47 AM]
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
READY TO ISSUE, NEED CONTRACTOR INFO & COP BUSINESS LICENCE, PSD LETTER & FEES PAID [Julie Johnson @ 07/27/2023 2:44 PM] PSD LETTER RECEVIED & ATTACHED IN DOCS & IMAGES, MR.FARRIS SAID HE WOULD BE ACTING AS CONTRACTOR [EMallott @ 08/08/2023 2:04 PM]

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
04/18/2023 Report Farrs SP Lot 2 Covenant Easement - Storm
04/21/2023 Receipt Receipt for transaction: 2023-000679
05/01/2023 Letter Permit Review Correction Letter
07/05/2023 Other Farris Covenant Easement - Access rev1
07/05/2023 Form Farris SP lot 2 resub letter 070223
07/05/2023 Other Farris Covenant Easement - Water
07/05/2023 Other Farris SP Covenant Easement - Storm rev1
07/11/2023 Receipt Receipt for transaction: 2023-001304
07/27/2023 Plans PHS19_056 - Danny Foster - Foster Residence - 6-7-23 (Flattened)
07/27/2023 Plans SITE PLAN (Stamped)
07/27/2023 Plans b-20-0741 resub 2 plans.pdf (Stamped)
07/27/2023 Plans ENERGY CODE WORKSHEET (Stamped)
07/27/2023 Plans STRUCTURAL CALS (Stamped)
07/27/2023 Plans b-20-0741 resub 1 truss floor (Stamped)
07/27/2023 Plans b-20-0741 resub 1 truss roof layout (Stamped)
07/27/2023 Plans b-20-0741 resub 1 truss layout (Stamped)
07/27/2023 Plans GEOTECHNICAL REPORT (Stamped)
07/27/2023 Form B-20-0741 TPCHD Approved Septic Site Plan (Stamped)
07/27/2023 Plans Drainage Report 121822 (Stamped)
07/27/2023 Report Farris SP Lot 2 O and M 041223 (Stamped)
07/27/2023 Report Farris Lot 2 Drainage Report 41225 - RESUB (Stamped)
07/27/2023 Plans CONSTRUCTION PLAN SET (Stamped)
08/01/2023 Agreement 2345 W STEWART B200741 RECORDED
08/18/2023 Easement Farris Covenant Easement - Water
08/18/2023 Easement Farris SP Covenant Easement - Storm rev2
08/18/2023 Easement Farris Covenant Easement - Access rev3
08/22/2023 Receipt Receipt for transaction: 2023-001608
08/22/2023 Receipt Receipt for transaction: 2023-001608
08/23/2023 Permit Permit - Detailed
08/23/2023 Letter Permit Job Card
01/09/2024 Letter Permit Expiration Notice
05/09/2024 Report Inspection Report (Erosion And Sediment Inspection)
08/20/2024 Report Inspection Report (Erosion And Sediment Inspection)
08/27/2024 Report Inspection Report (Storm Inspection)
09/30/2024 Report Inspection Report (Shear Wall Inspection)
10/10/2024 Report Inspection Report (Erosion And Sediment Inspection)
10/14/2024 Report Inspection Report (Comment Building Div Inspection)
12/03/2024 Report Inspection Report (Storm Inspection)
07/07/2025 Letter Permit Expiration Notice
09/05/2025 Letter Permit Expiration Notice
09/05/2025 Letter Permit Expiration Notice
09/16/2025 Report Inspection Report (Erosion And Sediment Inspection)
09/16/2025 Report Inspection Report (Fire Final Inspection)
09/30/2025 Receipt Receipt for transaction: 2025-001898


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.