Permit Application Status
B-21-0905
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Resubmittal Fee | $130.00 | $130.00 | Paid | 05/19/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 05/19/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 07/13/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Building Permit Fee | $3,708.75 | $2,410.69 | Not payable | Not Paid |
No
|
||||
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
Unclassified Appliance or Equipment Fee | $14.10 | $0.00 | Not payable | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Stormwater Report Review Fee | $260.00 | $0.00 | Not payable | Not Paid |
Building Plan Review Fee | $2,410.69 | $0.00 | Not payable | Not Paid |
Mechanical Plan Review Fee | $51.97 | $0.00 | Not payable | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | Not payable | Not Paid |
Gas Piping (Mechanical) Fee | $6.30 | $0.00 | Not payable | Not Paid |
$0.00
|
||||
AC Unit Fee | $19.55 | $0.00 | Not payable | Not Paid |
$0.00
|
||||
Sewer System Development ChargeFee - Tenant Improvment/Addition | $789.26 | $0.00 | Not payable | Not Paid |
Traffic Impact Fee (Commercial) | $45,000.00 | $0.00 | Not payable | Not Paid |
Totals: | $52,980.62 | $2,800.69 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
General Permit Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
* TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
* Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456
** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH PRCCP20220035 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED **
* THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING.
** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. See Civil permit PRCCP20220035 for approved method of control.
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. See Civil permit PRCCP20220035.
* Curb, gutter, sidewalk and approach must be poured per City Standards.
* Driveway approach must be a minimum of 30' wide.
* The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
* No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
PERMIT CONDITIONS:
1- COMPLY WITH 2018 IFC AND 2018 IBC
2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP
3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER
4- A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED
5- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN.
6- FIRE EXTINGUISHERS REQUIRED PER CODE
7- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING
8- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX
9- EXISTING BUILDINGS WILL NEED TO CONTACT CENTRAL PIERCE FIRE & RESCUE AND UPDATE THE KEY IN THE KNOX BOX
10- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL
INSPECTION REQUEST CODES:
2252 EXIT LIGHT TEST
9200 FIRE BUILDING FINAL
SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS.
DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
|
||
Pipeline Notfication Rcw 19.122.033 | Open | Standard Conditions |
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
Reference Number | Status | Type |
---|---|---|
PRCCP20220035 | Permit(s) Issued | Civil Construction Permit |
PRCA20231436 | Permit(s) Issued | Commercial - Addition |
PRFA20240600 | Canceled | Fire Alarms |
PRFA20242005 | Permit(s) Issued | Fire Alarms |
PRFS20250343 | Permit(s) Issued | Fire Sprinklers |