Summary

PRCA20220482
Commercial - Addition
Permit(s) Issued
STEP BY STEP FAMILY SUPPORT CENTER
Addition
We are finishing the construction of our greenhouse by connecting a 2nd module to the 1st and expanding the foundation to accommodate.This is a prefabricated greenhouse addition (2nd module) to be attached to our existing greenhouse. Most of the required information is included in the construction set or permit (E-21-0440). Structure Valuation $78,754.10 email March 3, 3023
03/10/2022
04/07/2023
10/22/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 04/19/2023 04/05/2023
Building Review Approved 04/19/2023 04/05/2023
Engineering Review VOID 04/19/2023 04/05/2023
Engineering Storm Review VOID 04/19/2023 04/05/2023
Planning Review VOID 04/19/2023 04/05/2023
Engineering Traffic Review Approved 04/19/2023 04/03/2023
Fire Review Approved 03/30/2023 03/17/2023
Building Review Failed 03/30/2023 03/17/2023
Engineering Storm Review VOID 03/30/2023 03/16/2023
Planning Review Approved 03/30/2023 03/13/2023
Engineering Review Approved 03/30/2023 03/10/2023
Engineering Traffic Review Approved 03/30/2023 03/09/2023
Engineering Traffic Review Approved 12/01/2022 03/03/2023
Fire Review Failed 12/01/2022 12/08/2022
Building Review Failed 12/01/2022 12/05/2022
Engineering Storm Review VOID 12/01/2022 12/02/2022
Engineering Review Approved 12/01/2022 11/18/2022
Planning Review Approved 12/01/2022 11/16/2022
Engineering Traffic Review Failed 05/06/2022 06/07/2022
Building Review Failed 05/06/2022 05/10/2022
Fire Review Failed 05/06/2022 05/10/2022
Planning Review Approved 05/06/2022 05/03/2022
Engineering Storm Review VOID 05/06/2022 04/21/2022
Engineering Review Approved 05/06/2022 04/19/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/07/2023
Building Permit Fee $1,833.75 $1,833.75 Paid 04/07/2023
Building Plan Review Fee $1,191.94 $1,191.94 Paid 03/10/2022
Stormwater Report Review Fee $260.00 $260.00 Paid 03/10/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 04/07/2023
Resubmittal Fee $130.00 $130.00 Paid 11/15/2022
Resubmittal Fee $130.00 $130.00 Paid 03/08/2023
Resubmittal Fee $130.00 $130.00 Paid 03/26/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Re-Roof Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Storm Inspection Pending
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Cover Inspection/Thrust Blocks Inspection Pending
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Comment Building Div Inspection Pending
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Outstanding
04/25/2024
Final inspection notes: On site for a fire alarm inspection. See A2.1 regarding the exits. a) Exit sign and exit illumination b) panic hardware c) door swing d) door landing and grade at exits These notes are provided for reference and are required to be completed for inspections.

Erosion And Sediment Inspection Not Ready 4/18/2023 4/18/2023 04/18/2023
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Passed w/ Conditions 4/18/2023 04/18/2023
Jason Little ((253) 435-3636)
Foundation/Rebar Inspection Not Ready 4/24/2023 4/24/2023 04/24/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/24/2023
1. provide city approved plans on site at time of next inspection as discussed with contractor

Foundation/Rebar Inspection Not Ready 4/25/2023 4/25/2023 04/25/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/25/2023
1. provide city approved plans on site at time of next inspection as discussed with contractor

Other/Miscellaneous
Carried Forward
04/25/2023
1. complete holes on each end of building as discussed with contractor 2. secure rebar cages to maintain soil to rebar clearances during the pouring process 3. verify the design mix of the concrete from engineer of record to determine if special inspections are needed 4. not ready

Footing/Setback Inspection Partial Pass 4/28/2023 4/28/2023 04/28/2023
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection Not Ready 4/28/2023 4/28/2023 04/28/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
04/28/2023
1. provide city approved plans on site at time of next inspection as discussed with contractor

Other/Miscellaneous
Resolved
04/28/2023
1. complete holes on each end of building as discussed with contractor 2. secure rebar cages to maintain soil to rebar clearances during the pouring process 3. verify the design mix of the concrete from engineer of record to determine if special inspections are needed 4. not ready

Other/Miscellaneous
Carried Forward
04/28/2023
1. Called in in error

Footing/Setback Inspection Not Ready 5/15/2023 5/15/2023 05/15/2023
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection Not Ready 5/15/2023 5/15/2023 05/15/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
05/15/2023
1. Called in in error

Other/Miscellaneous
Carried Forward
05/15/2023
1. provide corner bars at foundation as discussed with contractor 2. provide min clearance from rebar to forms 3. provide min clearance from rebar to ground 4. remove all rebar drove in the ground 5. protect pipe from concrete as discussed with contractor 6. provide test on plumbing as discussed with contractor at the time of next inspection

Underfloor Inspection Not Ready 5/16/2023 5/16/2023 05/16/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection Not Ready 03/11/2024
Ray Cockerham ((253) 841-5585)
Comment Building Div Inspection Not Ready 04/25/2024
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
04/25/2024
Final inspection notes: On site for a fire alarm inspection. See A2.1 regarding the exits. a) Exit sign and exit illumination b) panic hardware c) door swing d) door landing and grade at exits These notes are provided for reference and are required to be completed for inspections.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: Deferred submittals are required to be submitted for review and issuance before beginning work for the deferred item(s). * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: 1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND THE TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION. 6. FIRE ALARM SYSTEM IS REQUIRED; THE STRUCTURE IS OVER 7500 SQUARE FEET PER PMC. 7. INTENED TO BE USED AS ASSEMBLY SPACE FOR EVENTS. OPPERATIONAL PERMITS ARE REQURIED FOR THE USE OF THE U-UTILTY GREENHOUSE FOR ASSEMBLY; SEE EMAIL ATTACHED FROM THE PROPERTY OWNER.
Engineering Commercial Standard Conditions Open Standard Conditions
: ** Prior to STARTING site work; request inspection for Erosion and Sediment. For sedimentation and erosion control methods please refer to approved Stormwater site plan dated April 27, 2018; Revised August 27, 2018; Job No. 17376. Also see approved civil plans of E-17-0536 ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. The downspouts of the new greenhouse will tie into the onsite stormwater system via the NW corner of the building as indicated on the record drawing civil plans of E-17-0536 Sheet C6 of 13 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. ** There is an existing decommissioned drain field under the easterly portion of the proposed greenhouse. All portion of this drain field must be removed from under the footprint of the new greenhouse. For any questions speak with the city's engineering inspector, Jason Little (253-244-0387). * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Open Building Division Prior to Completion
: B-17-0271 Complete for final prior to final this permit PRCA20220482

Related Permit & Planning Applications

Reference Number Status Type
PRFA20240544 Permit(s) Issued Fire Alarms

Documents & Images

Date Uploaded File Type Name
06/08/2022 Report 17376-D-SSWR-2022-01-15 (Flattened)
04/05/2023 Report Step by Step Greenhouse Expansion - Structural Calcs - 2022-03-08 (Stamped)
06/08/2022 Plans 2nd Greenhouse Construction Set0 (Flattened)
04/06/2023 Plans SBS GH-Rev01_Drawing-Code-Site (Stamped)
06/08/2022 Form Step by Step Greenhouse Expansion - Building Permit Application0 (Flattened)
03/10/2022 Receipt Receipt for transaction:2022-000462
04/06/2023 Form SbS Greenhouse Cert of Water Availability (Stamped)
11/10/2022 Other SBS GH-Rev01_Doc-2018 Geotech Report
03/03/2023 Other SBS GH-Rev01_Doc-Devel Agmt (Flattened)
04/05/2023 Report SBS GH-Rev01_Doc-Supp Strct Calc from AHBL (Stamped)
11/15/2022 Receipt Receipt for transaction:2022-002264
03/03/2023 Plans SBS GH-Rev01_Supp Drawing-Commons Code Sheet0 (Flattened)
03/06/2023 Report SBS GH-Rev02-Doc_Greenhouse Purchase Receipt
03/17/2023 Report SBS-GH-Rev02-Doc_Email regarding Traffic & Frontage (Flattened)
04/06/2023 Plans SBS GH-Rev03-Drawing_Arch (Stamped)
04/05/2023 Report SBS GH-Rev02-Strct-Note from AHBL (Stamped)
04/05/2023 Report SBS GH-Rev02-Strct-Original Calc from Harnois (Stamped)
04/05/2023 Report SBS GH-Rev02-Strct-Original Calc Letter from Harnois (Stamped)
03/08/2023 Receipt Receipt for transaction:2023-000372
04/05/2023 Other SBS GH-Rev03-Doc_Letter from the Owner (Flattened)
03/26/2023 Receipt Receipt for transaction:2023-000493
04/07/2023 Letter Permit - Detailed
04/07/2023 Receipt Receipt for transaction:2023-000591
04/17/2023 Letter Permit Job Card
04/18/2023 Report Inspection Report (Erosion And Sediment Inspection)
04/18/2023 Report Inspection Report (Erosion And Sediment Inspection)
04/25/2023 Report Inspection Report (Foundation/Rebar Inspection)
04/28/2023 Response from engineer on footings
04/28/2023 Report Inspection Report (Footing/Setback Inspection)
05/15/2023 Report Inspection Report (Footing/Setback Inspection)
05/15/2023 Report Inspection Report (Foundation/Rebar Inspection)
05/16/2023 Report Inspection Report (Foundation/Rebar Inspection)
05/16/2023 Report Inspection Report (Underfloor Inspection)
10/05/2023 Letter Permit Expiration Notice
03/05/2024 Letter Permit Expiration Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.