CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCNC20241090
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 10/18/2024 |
Planning Landscape Review Fee | $180.00 | $180.00 | Paid | 10/18/2024 |
Air Handling Unit (Up to 10,000 cfm) Fee | $42.30 | $42.30 | Paid | 10/18/2024 |
Exhaust Hood, With Make Up Air - Commercial Fee | $323.55 | $323.55 | Paid | 10/18/2024 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 10/18/2024 |
Unclassified Appliance or Equipment Fee | $451.20 | $451.20 | Paid | 10/18/2024 |
Suspended, Recessed Wall, or Floor unit Heater Fee | $136.85 | $136.85 | Paid | 10/18/2024 |
Building Permit Fee | $20,208.75 | $20,208.75 | Paid | 10/18/2024 |
Planning Building Permit Fee | $60.00 | $60.00 | Paid | 10/18/2024 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 10/18/2024 |
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 07/09/2024 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 10/18/2024 |
Sump, Sewage, or Ejector Pumps Fee | $13.00 | $13.00 | Paid | 10/18/2024 |
Water Heater Fee | $26.00 | $26.00 | Paid | 10/18/2024 |
Building Plan Review Fee | $13,135.69 | $13,135.69 | Paid | 07/09/2024 |
Mechanical Plan Review Fee | $661.64 | $661.64 | Paid | 07/09/2024 |
Plumbing Plan Review Fee | $68.25 | $68.25 | Paid | 07/09/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 10/18/2024 |
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 07/09/2024 |
Plumbing Fixtures Fee | $858.00 | $858.00 | Paid | 10/18/2024 |
Sewer System Development Charge | $74,424.40 | $74,424.40 | Paid | 10/18/2024 |
$74,392.09
|
||||
Water System Development Charge | $43,419.80 | $43,419.80 | Paid | 10/18/2024 |
$43,393.22
|
||||
Resubmittal Fee | $180.00 | $180.00 | Paid | 09/12/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 09/30/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 10/11/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 10/18/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 10/31/2024 |
Building Division Fee (Hourly) | $630.00 | $630.00 | Paid | 12/09/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 02/25/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/20/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $156,345.43 | $156,345.43 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Block Wall Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Shower Pan Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Daily Inspection | Pending | |||
Engineering Final Inspection | Pending | |||
Floodproof Certification Inspection | Pending | |||
Elevation Verification Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
10/31/2024
1:concrete progressing with geo tech and special inspection approval.
|
||||
Underfloor Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/23/2024
partial below slab approval as highlighted and dated on plans
|
||||
Plumbing Below Slab Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Below Slab Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | Pending | |||
Comment Building Div Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Pending | 6/13/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/11/2025
1:bathrooms upstairs ok to rock
2:elevator shafts and stairwell, both rated. rocked taped and mudded without inspections, Provide architects approval on stamped letter head prior to next inspection,
3:dbl layer of duct wrap installed at hood ducts without verification of laps, provide mech engineers stamped approval on company letter head prior to next inspection.
|
||||
Wallboard / Drywall Inspection | Pending | 6/3/2025 | 6/3/2025 | |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Pending | 6/3/2025 | 6/3/2025 | |
Monty Johnson ((253) 770-3326) | ||||
Erosion And Sediment Inspection | Passed | 10/31/2024 | 10/31/2024 | 10/30/2024 |
Jeff Hill ((253) 204-5633) | ||||
Job Start Inspection | Passed | 10/30/2024 | 10/30/2024 | 10/30/2024 |
Jeff Hill ((253) 204-5633) | ||||
Footing/Setback Inspection | Partial Pass | 10/31/2024 | 10/31/2024 | 10/31/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/31/2024
1:concrete progressing with geo tech and special inspection approval.
|
||||
Foundation/Rebar Inspection | Partial Pass | 10/31/2024 | 10/31/2024 | 10/31/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
10/31/2024
1:concrete progressing with geo tech and special inspection approval.
|
||||
Underfloor Inspection | Partial Pass | 11/4/2024 | 11/4/2024 | 11/04/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/04/2024
partial below slab approval as highlighted and dated on plans
|
||||
Underfloor Inspection | Partial Pass | 11/8/2024 | 11/8/2024 | 11/08/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/08/2024
partial below slab approval as highlighted and dated on plans
|
||||
Other/Miscellaneous
Outstanding
11/08/2024
1:below slab plumbing ok as highlighted and dated on approved plans.
|
||||
Plumbing Rough In Inspection | Partial Pass | 11/13/2024 | 11/13/2024 | 11/13/2024 |
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | Partial Pass | 11/13/2024 | 11/13/2024 | 11/13/2024 |
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | Partial Pass | 11/21/2024 | 11/21/2024 | 11/21/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/21/2024
progressing with special inspection.
|
||||
Plumbing Rough In Inspection | Passed | 12/4/2024 | 12/4/2024 | 12/04/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/04/2024
1:below slab 12 line north ok.
|
||||
Foundation/Rebar Inspection | Partial Pass | 12/5/2024 | 12/5/2024 | 12/05/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/05/2024
progressing with special inspector
|
||||
Foundation/Rebar Inspection | Partial Pass | 12/12/2024 | 12/12/2024 | 12/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2024
progressing with special inspector
|
||||
Slab/Insulation Inspection | Partial Pass | 12/16/2024 | 12/16/2024 | 12/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/16/2024
Vapor barrier, slab rebar for interior kitchen spaces from grid 11-north
|
||||
Underfloor Inspection | Partial Pass | 12/23/2024 | 12/23/2024 | 12/23/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/23/2024
partial below slab approval as highlighted and dated on plans
|
||||
Plumbing Below Slab Inspection | Partial Pass | 12/30/2024 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/30/2024
below slab waste ok as highlighted and dated on plans
|
||||
Comment Building Div Inspection | Partial Pass | 12/30/2024 | 12/30/2024 | 12/30/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/30/2024
called for below slab plumbing
|
||||
Foundation/Rebar Inspection | Partial Pass | 12/30/2024 | 12/30/2024 | 12/30/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/30/2024
progressing with special inspections
|
||||
Slab/Insulation Inspection | Passed | 1/13/2025 | 1/13/2025 | 01/13/2025 |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Not Ready | 2/18/2025 | 2/18/2025 | 02/18/2025 |
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Partial Pass | 3/17/2025 | 3/17/2025 | 03/17/2025 |
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Not Ready | 3/19/2025 | 3/19/2025 | 03/19/2025 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Partial Pass | 3/26/2025 | 3/26/2025 | 03/26/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/26/2025
1:supply and dwv nw kitchen ok
2:overflow drains nw and ne kitchen approved,
3:gas test for nw kitchen ok at 30 psi
|
||||
Shear Wall Inspection | Partial Pass | 03/26/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/26/2025
ext shear nw and ne kitchens ok.
|
||||
Frame Inspection | Partial Pass | 3/26/2025 | 3/26/2025 | 03/26/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/26/2025
ok to install ft plywood behind electrical panels
|
||||
Plumbing Rough In Inspection | Partial Pass | 4/1/2025 | 4/1/2025 | 04/01/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/01/2025
1:north and south satellite kitchen roof drains and overflows ok.
|
||||
Frame Inspection | Failed | 4/1/2025 | 4/1/2025 | 04/01/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/01/2025
complete firestopping as discussed or provide alternate method from architect
|
||||
Comment Building Div Inspection | Partial Pass | 4/7/2025 | 4/7/2025 | 04/08/2025 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/08/2025
Met contartor on site regarding fire blocking questions.
1) Fire blocking is required due to the use of combustible FRT plywood. See 718.2.2
2) Is FRT plywood required. FRT plywood is allowed (required) by exception in Type II-B construction 603.1. Unable to find an exception to allow regular plywood.
3) Rain Screen fire blocking. 718.2.6, care must be taken to limit concealed spaces to less than 100 square feet.
Monty will inspect progress on 4/8 with inspection requested.
|
||||
Energy (Insulation) Inspection | Partial Pass | 4/8/2025 | 4/8/2025 | 04/08/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/08/2025
east wall of nw kitchen ok to cover inside with firetreated plywood
|
||||
Plumbing Rough In Inspection | Partial Pass | 4/9/2025 | 4/9/2025 | 04/09/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/09/2025
dwv south kitchen ok.
|
||||
Plumbing Rough In Inspection | Partial Pass | 4/11/2025 | 04/10/2025 | |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/10/2025
1:lower floor restroom dwv approved.
|
||||
Energy (Insulation) Inspection | Partial Pass | 4/10/2025 | 4/10/2025 | 04/10/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/10/2025
1:n:e satellite kitchen insulation ok.
|
||||
Comment Engineering Div Inspection | Not Ready | 4/15/2025 | 4/15/2025 | 04/15/2025 |
Jeff Hill ((253) 204-5633) | ||||
Comment Building Div Inspection | Partial Pass | 4/15/2025 | 4/16/2025 | 04/16/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/16/2025
talked about ducts and terminations, ok to enclose shafts on north half
|
||||
Shear Wall Inspection | Passed | 4/30/2025 | 4/30/2025 | 04/30/2025 |
Ted Christie ((253) 507-0191) | ||||
Plumbing Rough In Inspection | Passed | 4/30/2025 | 4/30/2025 | 04/30/2025 |
Ted Christie ((253) 507-0191) | ||||
Plumbing Rough In Inspection | Partial Pass | 5/1/2025 | 5/1/2025 | 05/01/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/01/2025
1:gas pipe for south building inside only ok at 6 1/2 psi
|
||||
Comment Building Div Inspection | Partial Pass | 5/5/2025 | 5/5/2025 | 05/05/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/05/2025
ext walls from 18 line north ok.
|
||||
Frame Inspection | Partial Pass | 05/06/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/06/2025
2 interior walls around 17 to 18 line
|
||||
Energy (Insulation) Inspection | Not Ready | 5/6/2025 | 5/6/2025 | 05/06/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/06/2025
called for frame
|
||||
Energy (Insulation) Inspection | Partial Pass | 5/8/2025 | 5/8/2025 | 05/08/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/08/2025
gas test approved at 20 psi, retested to include main line to meter.
|
||||
Mechanical Rough In Inspection | Partial Pass | 5/8/2025 | 5/8/2025 | 05/08/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/08/2025
1:2 condensate drains in wall ok at 17.5 line
|
||||
Gas Test Inspection | Partial Pass | 5/8/2025 | 5/8/2025 | 05/08/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/08/2025
1:approved at 20 psi, retest to include main line to meter.
|
||||
Energy (Insulation) Inspection | Not Ready | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Not Ready | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Partial Pass | 5/13/2025 | 5/13/2025 | 05/13/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/13/2025
1: upper deck metal floor joist/framing approved.
|
||||
Energy (Insulation) Inspection | Partial Pass | 5/13/2025 | 5/13/2025 | 05/13/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/13/2025
south half of south kitchen approved.
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/15/2025 | 5/15/2025 | 05/15/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/15/2025
upstairs supply approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 5/20/2025 | 5/20/2025 | 05/20/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/20/2025
upper floor walls and floor ok.
|
||||
Light Test For Grease Duct Inspection | Passed | 5/23/2025 | 5/23/2025 | 05/23/2025 |
Ted Christie ((253) 507-0191) | ||||
Frame Inspection | Failed | 6/3/2025 | 6/3/2025 | 06/03/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/03/2025
complete rough ins and insulation
|
||||
Frame Inspection | Partial Pass | 6/11/2025 | 6/11/2025 | 06/11/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/11/2025
1:bathrooms upstairs ok to rock
2:elevator shafts and stairwell, both rated. rocked taped and mudded without inspections, Provide architects approval on stamped letter head prior to next inspection,
3:dbl layer of duct wrap installed at hood ducts without verification of laps, provide mech engineers stamped approval on company letter head prior to next inspection.
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• A separate permit will be required for the Hood Suppression Systems. We would allow one permit for all Hoods or individually.
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down with Fire Alarm
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code to be installed at time of Fire Final
• Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20241189 for approved method of control.
- Stormwater control of roof downspouts required. See approved civil plan PRCCP20241189 for approved method of control.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Stormwater Maintenance Agreement (SWA) | Open | Prior to Occupancy |
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Building permit PRCNC20241090 cannot be issued until civil construction permit PRCCP20241189 is issued first. [Yianni Charitou @ 08/12/2024 2:25 PM]
PRCCP20241189 issued on 10/16/2024. [Yianni Charitou @ 10/16/2024 2:43 PM]
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Building permit PRCNC20241090 cannot be issued until demolition building permit PRDE20241420 is issued first. [Yianni Charitou @ 09/16/2024 2:40 PM]
Demolition permit PRDE20241420 issued on 10/1/2024. [Yianni Charitou @ 10/09/2024 1:43 PM]
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Disregard. [Yianni Charitou @ 10/09/2024 1:44 PM]
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Resolved | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering.
“As the fairgrounds is contributing $1 million to the City 9th Street reconstruction project, no additional frontage improvements are being required at this time with this building permit for the International Village.” - Ken Cook. See attached emails with subject line RE: PRCNC20241090 Frontage Improvement Review. [Yianni Charitou @ 10/11/2024 8:50 AM]
|
||
Backflow Protection Device - Commercial RPBA | Open | Prior to Completion |
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Fire Sprinkler Protection System Water Service and Backflow Protection Device | Open | Prior to Completion |
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
External Gravity Grease Interceptor | Open | Prior to Occupancy |
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project under civil construction permit PRCCP20241189. The grease interceptors must pass inspection prior to building occupancy. [Yianni Charitou @ 08/12/2024 3:04 PM]
|
||
Miscellaneous Condition | Resolved | Prior to Occupancy |
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.2, an oil/water separator is required to be designed by a professional engineer and installed on the side sewer per City Standards. A professional engineer shall provide sizing calculations and a report stating that the oil/water separator has adequate capacity to serve the connected facilities. The oil/water separator must pass inspection prior to building occupancy. [Yianni Charitou @ 09/16/2024 2:53 PM]
Hydraulic elevator replaced with electric elevator so oil/water separator no longer required. [Yianni Charitou @ 10/09/2024 1:09 PM]
|
||
Stormwater - Greater than 5,000 SF New/Replaced Hard Surface | Open | Standard Conditions |
Engineering Division
The City adopted the Department of Ecology’s 2019 Stormwater Management Manual for Western Washington which requires mitigation and site-specific stormwater testing for projects that add or replace 2,000 square feet or more of hard surfaces. Your proposed project exceeds the 5,000 square foot threshold of the manual. Therefore, your project requires a small-scale Pilot Infiltration Test (PIT) to determine site specific infiltration testing. In addition to infiltration testing, the seasonally high groundwater must be measured weekly for the duration of the wet season (December 21st – March 21st). A Development Engineer will also be assigned to complete the stormwater review of your project. Alternatively, you may revise your scope and plans to propose less new plus replaced hard surface area such that additional testing and mitigation are not required.
|
||
Miscellaneous Condition | Open | Prior to Occupancy |
Engineering Division
Occupancy shall not be granted until all civil work associated with PRCCP20241189 has been completed and approval has been provided. [Yianni Charitou @ 08/14/2024 11:26 AM]
|
||
Plumbing FUW Utility Service Credit | Open | Standard Conditions |
Engineering Division
Utility service credits are available for the subject site from the demolition of the existing International Village under demolition permit PRDE20241420. 47 water and 70 sewer FUW credits have been redeemed on building permit PRCNC20241090. Storm FUW credits can be redeemed on civil permits only. Utility service credits from other planned demolitions have not been redeemed on this permit, specifically the M Barn, Snack Shack, and Emergency Generator areas. [Yianni Charitou @ 10/03/2024 1:17 PM]
|
Reference Number | Status | Type |
---|---|---|
PRCCP20241189 | Permit(s) Issued | Civil Construction Permit |
PRDE20241420 | Closed | Demolition |
PRHM20241860 | Closed | Hydraulic Modeling |
PRFS20250027 | Permit(s) Issued | Fire Sprinklers |
PRFA20250627 | Returned for Correction | Fire Alarms |
PRFS20250708 | Permit(s) Issued | Fire Sprinklers |
PLPRE20230120 | File Closed | Pre-Application |
PLPSP20240052 | Waiting for Conditions | Preliminary Site Plan |