Summary

PRCNC20241090
Commercial - New Construction
Permit(s) Issued
WESTERN WASHINGTON FAIR ASSOCIATION
New
Demolish the existing restaurant and rooftop bar (to be a separate demo permit) AND replace them with a new restaurant and rooftop bar. - WASHINGTON STATE FAIR - INTERNATIONAL VILLAGE at 110 9TH AVE SW * REVISION (1) - 10/18/2024 - UNDERGROUND PLUMBING ON FOUNDATION PLAN * REVISION (2) - 10/31/2024 FIELD REVISION TO INCLUDE MECHANICAL SYSTEMS, PLUMBING AND ENERGY.
07/08/2024
10/18/2024
07/12/2025

Locations

Property
0420331121

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 12/03/2024 12/02/2024
Planning Review Approved 12/03/2024 11/12/2024
Engineering Review Approved 12/03/2024 11/07/2024
Fire Review Approved 12/03/2024 10/31/2024
Engineering Review Approved 11/18/2024 10/24/2024
Building Review Approved 11/18/2024 10/24/2024
Engineering Traffic Review Approved 11/08/2024 10/17/2024
Fire Review Approved 11/08/2024 10/15/2024
Engineering Review Approved 11/08/2024 10/14/2024
Building Review Approved 11/08/2024 10/14/2024
Planning Review Approved 11/08/2024 10/14/2024
Design Review VOID 11/08/2024 10/14/2024
Engineering Review Failed 10/30/2024 10/10/2024
Building Review Failed 10/30/2024 10/08/2024
Planning Review Approved 10/30/2024 10/03/2024
Fire Review Approved 10/30/2024 10/03/2024
Engineering Traffic Review Approved 10/30/2024 10/02/2024
Design Review VOID 10/30/2024 10/02/2024
Building Review Failed 10/11/2024 09/25/2024
Planning Review Approved 10/11/2024 09/23/2024
Fire Review Approved 10/11/2024 09/19/2024
Engineering Traffic Review Approved 10/11/2024 09/18/2024
Engineering Review Failed 10/11/2024 09/16/2024
Design Review VOID 10/11/2024 09/13/2024
Design Review VOID 09/11/2024 08/14/2024
Engineering Review Failed 09/11/2024 08/14/2024
Building Review Failed 09/11/2024 08/13/2024
Engineering Traffic Review Failed 09/11/2024 08/12/2024
Fire Review Approved 09/11/2024 08/08/2024
Planning Review Approved 09/11/2024 07/22/2024
Design Review VOID 09/11/2024 07/22/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 10/18/2024
Planning Landscape Review Fee $180.00 $180.00 Paid 10/18/2024
Air Handling Unit (Up to 10,000 cfm) Fee $42.30 $42.30 Paid 10/18/2024
Exhaust Hood, With Make Up Air - Commercial Fee $323.55 $323.55 Paid 10/18/2024
Mechanical Duct Work Fee $24.00 $24.00 Paid 10/18/2024
Unclassified Appliance or Equipment Fee $451.20 $451.20 Paid 10/18/2024
Suspended, Recessed Wall, or Floor unit Heater Fee $136.85 $136.85 Paid 10/18/2024
Building Permit Fee $20,208.75 $20,208.75 Paid 10/18/2024
Planning Building Permit Fee $60.00 $60.00 Paid 10/18/2024
Mechanical Permit Fee $40.00 $40.00 Paid 10/18/2024
Backflow Preventor Fee $26.00 $26.00 Paid 07/09/2024
Plumbing Permit Fee $40.00 $40.00 Paid 10/18/2024
Sump, Sewage, or Ejector Pumps Fee $13.00 $13.00 Paid 10/18/2024
Water Heater Fee $26.00 $26.00 Paid 10/18/2024
Building Plan Review Fee $13,135.69 $13,135.69 Paid 07/09/2024
Mechanical Plan Review Fee $661.64 $661.64 Paid 07/09/2024
Plumbing Plan Review Fee $68.25 $68.25 Paid 07/09/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 10/18/2024
Backflow Preventor Fee $26.00 $26.00 Paid 07/09/2024
Plumbing Fixtures Fee $858.00 $858.00 Paid 10/18/2024
Sewer System Development Charge $74,424.40 $74,424.40 Paid 10/18/2024
$74,392.09
Water System Development Charge $43,419.80 $43,419.80 Paid 10/18/2024
$43,393.22
Resubmittal Fee $180.00 $180.00 Paid 09/12/2024
Resubmittal Fee $180.00 $180.00 Paid 09/30/2024
Resubmittal Fee $180.00 $180.00 Paid 10/11/2024
Resubmittal Fee $180.00 $180.00 Paid 10/18/2024
Resubmittal Fee $180.00 $180.00 Paid 10/31/2024
Building Division Fee (Hourly) $630.00 $630.00 Paid 12/09/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection Pending
Block Wall Rebar Inspection Pending
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Pending
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection Pending
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Pending
Monty Johnson ((253) 770-3326)
Frame Inspection Pending
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Pending
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Pending
Monty Johnson ((253) 770-3326)
Gas Test Inspection Pending
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection Pending
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection Pending
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection Pending
Monty Johnson ((253) 770-3326)
Shower Pan Inspection Pending
Monty Johnson ((253) 770-3326)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Daily Inspection Pending
Engineering Final Inspection Pending
Floodproof Certification Inspection Pending
Elevation Verification Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection Pending
Monty Johnson ((253) 770-3326)
Building Final Inspection Pending
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Pending
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
10/31/2024
1:concrete progressing with geo tech and special inspection approval.

Underfloor Inspection Pending
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
12/23/2024
partial below slab approval as highlighted and dated on plans

Plumbing Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection Pending
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection Pending
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Pending
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Pending
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Partial Pass 10/31/2024 10/31/2024 10/31/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/31/2024
1:concrete progressing with geo tech and special inspection approval.

Foundation/Rebar Inspection Partial Pass 10/31/2024 10/31/2024 10/31/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
10/31/2024
1:concrete progressing with geo tech and special inspection approval.

Underfloor Inspection Partial Pass 11/4/2024 11/4/2024 11/04/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/04/2024
partial below slab approval as highlighted and dated on plans

Underfloor Inspection Partial Pass 11/8/2024 11/8/2024 11/08/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/08/2024
partial below slab approval as highlighted and dated on plans

Other/Miscellaneous
Outstanding
11/08/2024
1:below slab plumbing ok as highlighted and dated on approved plans.

Plumbing Rough In Inspection Partial Pass 11/13/2024 11/13/2024 11/13/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 11/13/2024 11/13/2024 11/13/2024
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Partial Pass 11/21/2024 11/21/2024 11/21/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/21/2024
progressing with special inspection.

Foundation/Rebar Inspection Partial Pass 12/5/2024 12/5/2024 12/05/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/05/2024
progressing with special inspector

Foundation/Rebar Inspection Partial Pass 12/12/2024 12/12/2024 12/12/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/12/2024
progressing with special inspector

Slab/Insulation Inspection Partial Pass 12/16/2024 12/16/2024 12/16/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/16/2024
Vapor barrier, slab rebar for interior kitchen spaces from grid 11-north

Underfloor Inspection Partial Pass 12/23/2024 12/23/2024 12/23/2024
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
12/23/2024
partial below slab approval as highlighted and dated on plans

Plumbing Below Slab Inspection Partial Pass 12/30/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/30/2024
below slab waste ok as highlighted and dated on plans

Comment Building Div Inspection Partial Pass 12/30/2024 12/30/2024 12/30/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/30/2024
called for below slab plumbing

Foundation/Rebar Inspection Partial Pass 12/30/2024 12/30/2024 12/30/2024
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/30/2024
progressing with special inspections

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • A separate permit will be required for the Hood Suppression Systems. We would allow one permit for all Hoods or individually. • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20241189 for approved method of control. - Stormwater control of roof downspouts required. See approved civil plan PRCCP20241189 for approved method of control. - The applicant is responsible to schedule all utility inspections prior to backfilling - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Stormwater Maintenance Agreement (SWA) Open Engineering Division Prior to Occupancy
: The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Miscellaneous Condition Resolved Engineering Division Prior to Issuance
: Building permit PRCNC20241090 cannot be issued until civil construction permit PRCCP20241189 is issued first. [Yianni Charitou @ 08/12/2024 2:25 PM] PRCCP20241189 issued on 10/16/2024. [Yianni Charitou @ 10/16/2024 2:43 PM]
Miscellaneous Condition Resolved Engineering Division Prior to Issuance
: Building permit PRCNC20241090 cannot be issued until demolition building permit PRDE20241420 is issued first. [Yianni Charitou @ 09/16/2024 2:40 PM] Demolition permit PRDE20241420 issued on 10/1/2024. [Yianni Charitou @ 10/09/2024 1:43 PM]
Miscellaneous Condition Resolved Engineering Division Prior to Issuance
: Disregard. [Yianni Charitou @ 10/09/2024 1:44 PM]
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings Resolved Engineering Division Prior to Issuance
: In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. “As the fairgrounds is contributing $1 million to the City 9th Street reconstruction project, no additional frontage improvements are being required at this time with this building permit for the International Village.” - Ken Cook. See attached emails with subject line RE: PRCNC20241090 Frontage Improvement Review. [Yianni Charitou @ 10/11/2024 8:50 AM]
Backflow Protection Device - Commercial RPBA Open Engineering Division Prior to Completion
: An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
Fire Sprinkler Protection System Water Service and Backflow Protection Device Open Engineering Division Prior to Completion
: A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
External Gravity Grease Interceptor Open Engineering Division Prior to Occupancy
: In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project under civil construction permit PRCCP20241189. The grease interceptors must pass inspection prior to building occupancy. [Yianni Charitou @ 08/12/2024 3:04 PM]
Miscellaneous Condition Resolved Engineering Division Prior to Occupancy
: In accordance with the Uniform Plumbing Code and City Design Standard 402.2, an oil/water separator is required to be designed by a professional engineer and installed on the side sewer per City Standards. A professional engineer shall provide sizing calculations and a report stating that the oil/water separator has adequate capacity to serve the connected facilities. The oil/water separator must pass inspection prior to building occupancy. [Yianni Charitou @ 09/16/2024 2:53 PM] Hydraulic elevator replaced with electric elevator so oil/water separator no longer required. [Yianni Charitou @ 10/09/2024 1:09 PM]
Stormwater - Greater than 5,000 SF New/Replaced Hard Surface Open Engineering Division Standard Conditions
: The City adopted the Department of Ecology’s 2019 Stormwater Management Manual for Western Washington which requires mitigation and site-specific stormwater testing for projects that add or replace 2,000 square feet or more of hard surfaces. Your proposed project exceeds the 5,000 square foot threshold of the manual. Therefore, your project requires a small-scale Pilot Infiltration Test (PIT) to determine site specific infiltration testing. In addition to infiltration testing, the seasonally high groundwater must be measured weekly for the duration of the wet season (December 21st – March 21st). A Development Engineer will also be assigned to complete the stormwater review of your project. Alternatively, you may revise your scope and plans to propose less new plus replaced hard surface area such that additional testing and mitigation are not required.
Miscellaneous Condition Open Engineering Division Prior to Occupancy
: Occupancy shall not be granted until all civil work associated with PRCCP20241189 has been completed and approval has been provided. [Yianni Charitou @ 08/14/2024 11:26 AM]
Plumbing FUW Utility Service Credit Open Engineering Division Standard Conditions
: Utility service credits are available for the subject site from the demolition of the existing International Village under demolition permit PRDE20241420. 47 water and 70 sewer FUW credits have been redeemed on building permit PRCNC20241090. Storm FUW credits can be redeemed on civil permits only. Utility service credits from other planned demolitions have not been redeemed on this permit, specifically the M Barn, Snack Shack, and Emergency Generator areas. [Yianni Charitou @ 10/03/2024 1:17 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20241189 Permit(s) Issued Civil Construction Permit
PRDE20241420 Closed Demolition
PRHM20241860 Closed Hydraulic Modeling
PRFS20250027 Permit(s) Issued Fire Sprinklers
PLPRE20230120 File Closed Pre-Application
PLPSP20240052 Waiting for Conditions Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
07/09/2024 Receipt Receipt for transaction:2024-001413
07/09/2024 Receipt Receipt for transaction:2024-001414
09/12/2024 Receipt Receipt for transaction:2024-001904
09/30/2024 Receipt Receipt for transaction:2024-002051
10/17/2024 Form BLDG ENERGY REQUIREMENTS (Stamped)
10/17/2024 Form ENERGY COMPLIANCE - (Stamped)
10/17/2024 Other MECHANICAL CALCS (Stamped)
10/17/2024 Form PLUMBING FIXTURE WORKSHEET (Stamped)
10/17/2024 Plans SITE MAP - (Stamped)
10/17/2024 Report STRUCTURAL CALCS (Stamped)
10/17/2024 Plans WALKIN PANEL SHOP DRAWING - (Stamped)
10/18/2024 Permit Permit - Detailed
10/18/2024 Letter Permit Job Card
10/18/2024 Receipt Receipt for transaction: 2024-002182
10/18/2024 Receipt Receipt for transaction:2024-002187
10/31/2024 Receipt Receipt for transaction:2024-002265
11/13/2024 Report Inspection Report (Foundation/Rebar Inspection)
11/13/2024 Report Inspection Report (Plumbing Rough In Inspection)
12/03/2024 Plans CONSTRUCTION PLAN SET - REVISION 2 - FULL SET (Stamped)
12/03/2024 Form ENERGY CODE WORKSHEET - REV (2) (Stamped)
12/09/2024 Receipt Receipt for transaction:2024-002543
12/23/2024 Report Inspection Report (Underfloor Inspection)