Permit Application Status
PRCNC20241917
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $3,336.94 | $3,336.94 | Paid | 12/13/2024 |
Mechanical Plan Review Fee | $206.31 | $206.31 | Paid | 12/13/2024 |
Plumbing Plan Review Fee | $331.01 | $331.01 | Paid | 12/13/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/01/2025 |
Latecomer Sewer Contribution Fee | $95,986.23 | $95,986.23 | Paid | 03/13/2025 |
$0.00
|
||||
Latecomer 4% Administration Fee | $3,839.44 | $3,839.44 | Paid | 03/13/2025 |
$0.00
|
||||
Latecomer 4% Administration Fee | $3,561.16 | $3,561.16 | Paid | 03/13/2025 |
$0.00
|
||||
Latecomer Sewer Contribution Fee | $89,040.21 | $89,040.21 | Paid | 03/13/2025 |
$89,029.19
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
Planning Landscape Review Fee | $90.00 | $0.00 | Not payable | Not Paid |
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $71.90 | $0.00 | Not payable | Not Paid |
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $19.40 | $0.00 | Not payable | Not Paid |
Exhaust Hood, With Make Up Air - Commercial Fee | $143.80 | $0.00 | Not payable | Not Paid |
Mechanical Duct Work Fee | $14.10 | $0.00 | Not payable | Not Paid |
Ventilation System (apart from Heating/AC) Fee | $28.20 | $0.00 | Not payable | Not Paid |
Building Permit Fee | $5,133.75 | $0.00 | Not payable | Not Paid |
Planning Building Permit Fee | $30.00 | $0.00 | Not payable | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $0.00 | Not payable | Not Paid |
Plumbing Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Grease Trap or Interceptor Fee | $13.00 | $0.00 | Not payable | Not Paid |
Water Heater Fee | $26.00 | $0.00 | Not payable | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | Not payable | Not Paid |
Plumbing Fixtures Fee | $390.00 | $0.00 | Not payable | Not Paid |
Traffic Impact Fee (Commercial) | $221,850.00 | $0.00 | Not payable | Not Paid |
Water System Development Charge | $14,783.57 | $0.00 | Not payable | Not Paid |
Sewer System Development Charge | $23,243.90 | $0.00 | Not payable | Not Paid |
Totals: | $462,729.17 | $196,481.30 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20241846 for approved method of control.
- Stormwater control of roof downspouts required.
- Steps shall be taken to prevent drainage onto adjacent lots.
- All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required as directed by the City of Puyallup.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Ready to Issue - Need Contractor Info | Open | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Ready to Issue - Need Business License Endorsement | Open | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
External Gravity Grease Interceptor | Open | Prior to Issuance |
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project. The grease interceptor must be installed, inspected, approved, and fully operational prior to granting building occupancy.
|
||
Stormwater Maintenance Agreement (SWA) | Open | Prior to Occupancy |
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
Right-of-Way (ROW) Dedication | Open | Prior to Issuance |
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. Building permit PRCNC20241917 cannot be issued until boundary line adjustment PLBDJ20240103 is approved and recorded which depicts the required right-of-way dedication. The building permit site plan must match the approved boundary line adjustment. [Yianni Charitou @ 03/06/2025 10:36 AM]
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Engineering Division
Building permit PRCNC20241917 cannot be issued until civil construction permit PRCCP20241846 is issued first. The building permit site plan must match the approved civil plan. [Yianni Charitou @ 03/06/2025 10:36 AM]
|
||
Miscellaneous Condition | Open | Prior to Occupancy |
Engineering Division
Occupancy will not be granted until civil construction permit PRCCP20241846 has been completed and the final inspection has been passed. [Yianni Charitou @ 03/06/2025 10:38 AM]
|
||
FEMA Floodplain - AE Flood Zone - Commercial | Resolved | Prior to Occupancy |
Engineering Division
This property lies within a regulated flood zone. According to the FEMA LOMR Case Number 21-10-0191P issued on April 27, 2022 and effective September 8, 2022, the flooding zone has been revised and the proposed building is no longer within the AE flood zone.
|
||
Backflow Protection Device - Commercial DCVA | Open | Prior to Occupancy |
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Fire Sprinkler Protection System Water Service and Backflow Protection Device | Open | Prior to Occupancy |
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Williams Gas Pipeline Survey | Open | Prior to Issuance |
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Open | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil construction permit application PRCCP20240569 has been issued.
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Open | Prior to Occupancy |
Engineering Division
Your project is required to install frontage improvements in accordance with Puyallup Municipal Code 11.08.135. Building permit occupancy shall not be granted until the frontage improvements are completed and accepted, and civil construction permit PRCCP20240569 is finaled/closed.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
There are conflicting building permit applications for this location. Building permit applications PRCNC20241917 and PRCNC20231714 both propose a new commercial building in this location. The conflict shall be resolved by cancelling one of the two building permit applications prior to building permit issuance. [Yianni Charitou @ 03/06/2025 1:51 PM]
PRCNC20231714 was cancelled in March 2025. [Yianni Charitou @ 03/18/2025 2:11 PM]
|
||
Latecomer Agreement | Resolved | Prior to Issuance |
Engineering Division
Per Puyallup Municipal Code Chapter 11.24, the property is subject to two recorded sanitary sewer latecomer's agreements. The property owner will be required to submit a development contribution latecomer fee for the Viking JV, LLC sanitary sewer main extension and sanitary sewer lift station/force main as defined in latecomer's agreements recorded under AFNs 202107061306 and 202406210039, respectively. The latecomer's development contribution fees have been assessed on building permit application PRCNC20241917.
Latecomer contribution fees paid under PRCNC20241917 on 3/13/2025. [Yianni Charitou @ 03/18/2025 12:30 PM]
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Engineering Division
According to PMC Chapter 19.06.020, contiguous parcels are required to be combined when they share common facilities including but not limited to access, parking, utilities, open space, landscaping, signage, etc., for which no easements or other legal instruments exist to ensure continuous ownership, use and maintenance of such facilities. In this particular case, the East Town Crossing parcels share such facilities including driveway access, parking, landscaping, trash enclosures, and utilities. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument for the continuous ownership, use, and maintenance of the common facilities in compliance with Puyallup Municipal Code.
|
Reference Number | Status | Type |
---|---|---|
PRCCP20241846 | Returned for Correction | Civil Construction Permit |
PRWSA20241974 | Closed | Water or Sewer Adequacy (for FOOD SERVICE ESTABLISHMENTS) |
PR20250459 | Pending |
Date Uploaded | File Type | Name |
---|---|---|
12/13/2024 | Letter | Incomplete Application Notice |
12/13/2024 | Receipt | Receipt for transaction:2024-002596 |
01/03/2025 | Other | TRAFFIC SCOPING - TRIP GEN |
03/10/2025 | Letter | Permit Review Correction Letter |
03/10/2025 | Form | Building Permit Application - completed (Flattened) |
03/10/2025 | Drawing | ARCH ELEVATIONS (Flattened) |
03/10/2025 | Other | PROJECT DESCRIPTION LETTER (Flattened) |
03/10/2025 | Form | Plumbing fixture worksheet_202012021825172385 (Flattened) |
03/10/2025 | Report | HAZARDOUS MATERIALS FORM (Flattened) |
03/10/2025 | Report | No Truss Doc Required - Email Brian Snowden (Flattened) |
03/10/2025 | Plans | No Truss Doc Required - Email Brian Snowden0 (Flattened) |
03/10/2025 | Plans | No Truss Doc Required - Email Brian Snowden1 (Flattened) |
03/10/2025 | Form | Envelope - Mechanical Energy Code Worksheets (Flattened) |
03/13/2025 | Receipt | Receipt for transaction: 2025-000496 |
04/01/2025 | Receipt | Receipt for transaction:2025-000622 |
04/03/2025 | Letter | Incomplete Application Notice |