Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Paid Fees
Amount
Paid
Owing
Date Paid
Clear Fill and Grading Review Fee
$1,000.00
$1,000.00
Paid
06/21/2023
Record Drawing Review Fee
$200.00
$200.00
Paid
06/21/2023
Outstanding Fees
Amount
Paid
Owing
Date Paid
Engineering Inspection Fee (3%)
$28,245.69
$0.00
$28,245.69
Not Paid
Clear Fill Grading Permit Fee
$190.00
$0.00
$190.00
Not Paid
Totals:
$29,635.69
$1,200.00
$28,435.69
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
There are no inspections for this engineering permit application, or you are not authorized to view them.
Condition
Status
Department
Category
Expiration Date
Due Date
Civil Standard Conditions
Open
Engineering Division
Standard Conditions
:
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting
Open
Engineering Division
Prior to Issuance
:
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Miscellaneous Condition
Open
Engineering Division
Prior to Issuance
:
NEEDS STORMWATER PERFORMANCE BOND - 125%. THIS BOND SHOULD CARRY OVER TO THE CIVIL PERMIT PRCCP20231096. ONCE STORM IS COMPLETE, A MAINTENANCE BOND SHOULD BE RECEIVED & THE PERF BOND RELEASED. [Robyn Buck @ 03/05/2024 8:41 AM]
Certificate of Insurance/CG2012
Open
Engineering Division
Prior to Issuance
:
Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond
Open
Engineering Division
Prior to Issuance
:
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information.
Miscellaneous Condition
Open
Traffic Division
Standard Conditions
:
Northern driveway with shared access easement shall not be used for egress to 15th ST SE during clear, fill, grade operations.
Miscellaneous Condition
Open
Planning Division
:
In response to the issuance of the SEPA DNS for Fortress (PLPSP20220155), the Department of Ecology has recommended that pollution in the environment be remediated in compliance with WAC 173-340 before or during site development and while contaminated soil and/or groundwater are more accessible. The proponent for this project has entered into Ecology’s Expedited Voluntary Cleanup Program (VCP) and provided a cleanup plan to Ecology who provided concurrence on this plan on July 24, 2023.
Ecology’s issuance of a No Further Action (NFA) determination for the Site is anticipated to follow construction of the vapor intrusion mitigation system (installed during building construction) as well as after groundwater monitoring wells have achieved cleanup levels for a minimum of four consecutive quarterly monitoring events. Groundwater monitoring activities could extend beyond completion of construction of the new warehouse. Due to the extent of remediation necessary for this cleanup, the proponent should continue to work towards an NFA and may be issued their civil permit and clear, fill, and grade permit during which they can begin construction and conduct appropriate cleanup of the site concurrently.
Overtime Inspection and Watermain Shutdown Fee
Open
Engineering Division
Prior to Issuance
:
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Inadvertent Discovery Plan (IDP)
Open
Engineering Division
Prior to Issuance
:
Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
Ready to Issue - Need Contractor Info
Open
Development & Permitting Services
Prior to Issuance
:
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Miscellaneous Condition
Open
Development & Permitting Services
:
Treatment/Testing of contaminated stormwater is required prior to sending any stormwater runoff downstream. Provide treatment design from the Department of Ecology.