PRPF20241231
Pre-Fabricated Building
Permit(s) Issued
(1) SINGLE PORTABLES FOR THE JR HIGH SCHOOL/SOUTH OF EXISTING HIGH SCHOOL CCS ELEMENTARY & JR HIGH SCHOOL PORTABLES LOCATION PROJECT * REVISION (1) - 11/21/2025 - FOR ADA ROUTE TO PLAYGROUND
08/05/2024
06/11/2025
06/07/2026

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Storm Review Approved 12/19/2025 12/08/2025
Engineering Review Approved 12/08/2025 12/05/2025
Building Review Approved 12/08/2025 12/01/2025
Planning Review Approved 06/02/2025 06/05/2025
Fire Review Approved 06/02/2025 05/28/2025
Engineering Review Approved 06/02/2025 05/20/2025
Engineering Traffic Review Approved 06/02/2025 05/19/2025
Engineering Storm Review Approved 06/02/2025 05/16/2025
Building Review Approved 06/02/2025 05/16/2025
Planning Review Approved 12/31/2024 01/07/2025
Engineering Review Failed 12/31/2024 12/30/2024
Engineering Storm Review Approved 12/31/2024 12/19/2024
Engineering Traffic Review Approved 12/31/2024 12/19/2024
Building Review Approved 12/31/2024 12/18/2024
Fire Review Approved 12/31/2024 12/16/2024
Planning Review Failed 11/04/2024 11/05/2024
Engineering Traffic Review Approved 11/04/2024 10/30/2024
Engineering Storm Review Approved 11/04/2024 10/29/2024
Engineering Review Failed 11/04/2024 10/23/2024
Fire Review Approved 11/04/2024 10/23/2024
Building Review Failed 11/04/2024 10/23/2024
Planning Review Failed 09/05/2024 09/10/2024
Engineering Review Failed 09/05/2024 09/09/2024
Engineering Traffic Review Approved 09/05/2024 09/04/2024
Fire Review Approved 09/05/2024 08/23/2024
Engineering Storm Review Approved 09/05/2024 08/16/2024
Building Review Failed 09/05/2024 08/14/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Stormwater Inspection Fee $360.00 $360.00 Paid 06/10/2025
Building Permit Fee $643.75 $643.75 Paid 06/10/2025
Building Plan Review Fee $418.44 $418.44 Paid 08/06/2024
Stormwater Report Review Fee $360.00 $360.00 Paid 08/06/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 06/10/2025
Traffic Impact Fee (Commercial) $39,600.00 $39,600.00 Paid 06/10/2025
Resubmittal/Revision Fee $180.00 $180.00 Paid 09/16/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 11/14/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 04/22/2025
Resubmittal/Revision Fee $180.00 $180.00 Paid 11/24/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Planning Final Inspection Pending
Residential Final Inspection Pending
Shannon King ((253) 840-6684)
Manufactured Or Modular Structure Setup Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
09/03/2025
From previous correction: Items 1, 2, 4, 5, 8 are completed for TCO. 3)Hazardous Locations: Glazing that is within 60 inches of the walking surface and does not meet the exception of 18 inches clear between the guard and the glazing is considered hazardous. Hazard glazing https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4 and https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4.6 For temporary solutions, please provide a concept that protects the exterior on the ramp/stair side. ***Temporary solution, see email dated 8/29/2025. Okay for TCO subject to reinspection when requested. 6) Playground – need a review of the playground code requires an accessible access to the play area. I will take a look tomorrow. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has vergbally proposed an accessible route. Follow up will verify route. 7) Engineering, Planning and TPCHD approvals are required. ***Unresolved

Building Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
09/30/2025
TCO approved for 30 calendar days. From previous correction: Items 1, 2, 4, 5, 7, 8 are completed for CO. TCO approved for 30 calendar days. Expires Friday October 3rd. 3)Hazardous Locations: ***Temporary solution, see email dated 8/29/2025. Okay for TCO subject to reinspection when requested. 6) Playground – Accommodation is need per State code for new equipment. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has verbally proposed an accessible route. Follow up with architect and construct route, design, slopes, grade and surface to code standards.

Building Final Inspection Pending
Shannon King ((253) 840-6684)
Manufactured Or Modular Structure Setup Passed 6/18/2025 6/18/2025 06/18/2025
Ted Christie ((253) 507-0191)
Fire Final Inspection Failed 8/27/2025 08/27/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
08/27/2025
1) Exit light test required. Reviewed several lights; need to be serviced for testing. 2) Portable Identification; post portable numbers visible from fire access. 4-inch characters minimum. 3) Fire Extinguishers - Tag as NEW with date or use an indelible marker on the tank NEW with Date.

Fire Final Inspection Passed 8/28/2025 8/28/2025 08/28/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Resolved
08/28/2025
1) Exit light test required. Reviewed several lights; need to be serviced for testing. 2) Portable Identification; post portable numbers visible from fire access. 4-inch characters minimum. 3) Fire Extinguishers - Tag as NEW with date or use an indelible marker on the tank NEW with Date.

Manufactured Or Modular Structure Setup Failed 8/28/2025 8/28/2025 08/28/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
08/28/2025
1) Some exit lighting and exit signs are not working in PE 17; PE 14 and PE 22 and Men’s room at PE26? (One of the men’s restrooms had the device removed from the wall). 2) On accessible routes: openings at thresholds and others as applicable are limited to ½ inch maximum. This an excerpt of code from the 2021 IBC. https://codes.iccsafe.org/content/IBCACCPB2024P1/chapter-3-building-blocks#IBCACCPB2024P1_Pt03_Ch03_Sec302.3 3) Hazardous Locations: Glazing that is within 60 inches of the walking surface and does not meet the exception of 18 inches clear between the guard and the glazing is considered hazardous. Hazard glazing https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4 and https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4.6 For temporary solutions, please provide a concept that protects the exterior on the ramp/stair side. 4) Gaps and openings into the crawlspace and structure; please continue to seal. Review in accordance with manufacture and applicable standards to seal openings into the structure (noted at hollow framed doors) and the crawlspace. 5) Fire Final is complete less verification of the device map at the main fire alarm panel, this item will not delay occupancy. 6) Playground – need a review of the playground code requires an accessible access to the play area. I will take a look tomorrow. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 7) Engineering, Planning and TPCHD approvals are required. 8) Work was continuing competing the ventilation at the skirting. Continued progress is expected.

Manufactured Or Modular Structure Setup Failed 8/29/2025 8/29/2025 08/31/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Resolved
08/31/2025
1) Some exit lighting and exit signs are not working in PE 17; PE 14 and PE 22 and Men’s room at PE26? (One of the men’s restrooms had the device removed from the wall). 2) On accessible routes: openings at thresholds and others as applicable are limited to ½ inch maximum. This an excerpt of code from the 2021 IBC. https://codes.iccsafe.org/content/IBCACCPB2024P1/chapter-3-building-blocks#IBCACCPB2024P1_Pt03_Ch03_Sec302.3 3) Hazardous Locations: Glazing that is within 60 inches of the walking surface and does not meet the exception of 18 inches clear between the guard and the glazing is considered hazardous. Hazard glazing https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4 and https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4.6 For temporary solutions, please provide a concept that protects the exterior on the ramp/stair side. 4) Gaps and openings into the crawlspace and structure; please continue to seal. Review in accordance with manufacture and applicable standards to seal openings into the structure (noted at hollow framed doors) and the crawlspace. 5) Fire Final is complete less verification of the device map at the main fire alarm panel, this item will not delay occupancy. 6) Playground – need a review of the playground code requires an accessible access to the play area. I will take a look tomorrow. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 7) Engineering, Planning and TPCHD approvals are required. 8) Work was continuing competing the ventilation at the skirting. Continued progress is expected.

Other/Miscellaneous
Carried Forward
08/31/2025
From previous correction: Items 1, 2, 4, 5, 8 are completed for TCO. 3)Hazardous Locations: Glazing that is within 60 inches of the walking surface and does not meet the exception of 18 inches clear between the guard and the glazing is considered hazardous. Hazard glazing https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4 and https://codes.iccsafe.org/content/IBC2021P2/chapter-24-glass-and-glazing#IBC2021P2_Ch24_Sec2406.4.6 For temporary solutions, please provide a concept that protects the exterior on the ramp/stair side. ***Temporary solution, see email dated 8/29/2025. Okay for TCO subject to reinspection when requested. 6) Playground – need a review of the playground code requires an accessible access to the play area. I will take a look tomorrow. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has vergbally proposed an accessible route. Follow up will verify route. 7) Engineering, Planning and TPCHD approvals are required. ***Unresolved

Storm Inspection Passed 09/02/2025
Jeff Hill ((253) 204-5633)
Engineering Final Inspection Passed 09/02/2025
Jeff Hill ((253) 204-5633)
Building Final Inspection Partial Pass 9/3/2025 9/3/2025 09/03/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/03/2025
TCO approved for 30 calendar days. From previous correction: Items 1, 2, 4, 5, 7, 8 are completed for CO. TCO approved for 30 calendar days. Expires Friday October 3rd. 3)Hazardous Locations: ***Temporary solution, see email dated 8/29/2025. Okay for TCO subject to reinspection when requested. 6) Playground – Accommodation is need per State code for new equipment. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has verbally proposed an accessible route. Follow up with architect and construct route, design, slopes, grade and surface to code standards.

Building Final Inspection Partial Pass 9/30/2025 9/30/2025 09/30/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/30/2025
TCO approved for 30 calendar days. From previous correction: Items 1, 2, 4, 5, 7, 8 are completed for CO. TCO approved for 30 calendar days. Expires Friday October 3rd. 3)Hazardous Locations: ***Temporary solution, see email dated 8/29/2025. Okay for TCO subject to reinspection when requested. 6) Playground – Accommodation is need per State code for new equipment. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has verbally proposed an accessible route. Follow up with architect and construct route, design, slopes, grade and surface to code standards.

Building Final Inspection Partial Pass 10/1/2025 10/1/2025 10/01/2025
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Outstanding
10/01/2025
TCO approved for 30 calendar days. 6) Playground – Accommodation is need per State code for new equipment. https://codes.iccsafe.org/lookup/content-id/35128943 & https://codes.iccsafe.org/content/IBC2021P2/chapter-11-accessibility#IBC2021P2_Ch11_Sec1111.4.13 ***Applicant has verbally proposed an accessible route. Follow up with architect and construct route, design, slopes, grade and surface to code standards.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Miscellaneous Condition Open Standard Conditions
Development & Permitting Services
Engineering Storm Review to be completed under civil permit PRCCP20241229. No work shall commence on this permit until the civil permit review is approved and the permit is issued. [Jamie Carter @ 08/16/2024 8:34 AM]
Fire Review Conditions Open Standard Conditions
Development & Permitting Services
• A minimum of one 2a-10bc fire extinguisher is required in each room • A fire alarm system is required • A separate permit is required for fire alarm Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Miscellaneous Condition Resolved Prior to Issuance
Traffic Division
Issuance of this building permit is dependent upon Conditional Use Permit approval (PLCUP20240037). With the approval of the current CUP proposal (PLCUP20240037), the vested capacity would increase to 1341 students.
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings Resolved Prior to Completion
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a civil permit issued. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved. You can initiate the civil permit by completing and submitting an application found here: https://www.cityofpuyallup.org/450/Permits-and-Applications.
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f).
Stormwater Maintenance Agreement (SWA) Resolved Prior to Completion
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification. Being tracked on permit PRCCP20241229
Backflow Protection Device - Commercial DCVA Resolved Prior to Completion
Engineering Division
N.A, no backflow associated with these specific portables.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Building permit PRPF20241231 cannot be issued until civil construction permit PRCCP20241229 is issued first.
Miscellaneous Condition Resolved Prior to Completion
Development & Permitting Services
Occupancy shall not be granted until all civil work associated with PRCCP20241229 has been completed and approval has been provided.
SEPA Determination Required Resolved Prior to Issuance
Planning Division
Permit scope subject to SEPA Environmental Review. Permit cannot be issued until associated SEPA Determination appeal period has expired without appeal.

Related Permit & Planning Applications

Reference Number Status Type
PRGR20241060 Canceled Clear, Fill, & Grade Permit
PRDE20241092 Closed Demolition
PRCWSA20241097 Closed Certificate of Water/Sewer Availability
PRFA20241113 Closed Fire Alarms
PRFA20241133 Closed Fire Alarms
PRCCP20241229 Permit(s) Issued Civil Construction Permit
PRPF20241230 Closed Pre-Fabricated Building
PRMH20241661 Closed Mechanical - COMMERCIAL ONLY
PRPF20250508 Closed Pre-Fabricated Building
PRFA20250588 Closed Fire Alarms
PLCUP20240037 Waiting for Conditions Conditional Use Permit
PLLC20240075 File Closed Lot Combination

Documents & Images

Date Uploaded File Type Name
08/05/2024 Other VENTILATION LETTER
08/05/2024 Form APPLICATION BLD/MECH ONLY
08/06/2024 Receipt Receipt for transaction:2024-001625
09/10/2024 Letter Permit Review Correction Letter
09/13/2024 IMG_0007
09/13/2024 IMG_0006
09/13/2024 IMG_0002
09/13/2024 IMG_0010
09/13/2024 IMG_0008
09/13/2024 IMG_0003
09/13/2024 IMG_0009
09/13/2024 IMG_0005
09/13/2024 IMG_0001
09/13/2024 IMG_0004
09/13/2024 IMG_0029
09/13/2024 IMG_0030
09/13/2024 IMG_0025
09/13/2024 IMG_0011
09/13/2024 IMG_0027
09/13/2024 IMG_0028
09/13/2024 IMG_0026
09/13/2024 IMG_0031
09/13/2024 IMG_0024
09/13/2024 IMG_0032
09/16/2024 Receipt Receipt for transaction:2024-001923
11/06/2024 Letter Permit Review Correction Letter
11/14/2024 Receipt Receipt for transaction:2024-002388
01/07/2025 Letter Permit Review Correction Letter
04/22/2025 Receipt Receipt for transaction:2025-000780
06/10/2025 Plans SITE PLAN - RESUB (Stamped)
06/10/2025 Plans RAMP STAIRS - RESUB (Stamped)
06/10/2025 Other PLAN SET - RESUB (Stamped)
06/10/2025 Plans CCS Elem 813 Rev01-Drawing_General Code - RESUB (Stamped)
06/10/2025 Plans 21FBS2400126_ATCO_appr (Stamped)
06/10/2025 Plans FOUNDATION DETAILS - CCS Elem 813 Rev02-Drawing_Portable-Foundation (Stamped)
06/10/2025 Receipt Receipt for transaction:2025-001119
06/11/2025 Permit Permit - Detailed
11/24/2025 Receipt Receipt for transaction:2025-002237
12/09/2025 Plans PLAYGROUND ADA EXTENSION SHEET C13 - REV (1) (Stamped)