CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRWF20250216
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $145.11 | $145.11 | Paid | 02/11/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Building Permit Fee | $223.25 | $0.00 | Not payable | Not Paid |
Resubmittal Fee | $180.00 | $0.00 | $180.00 | Not Paid |
Totals: | $548.36 | $145.11 | $180.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$180.00 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Miscellaneous Condition | Open | Submit With Civil Permit Application |
Development & Permitting Services
Figure 2 from Page 7/28 from the Retaining Wall Design Letter dated Nov 19th, 2024 should be reprinted in the white space on G-14 of the civil plans. This detail clearly shows the fabric liner, the drainage area, and the proper slopes. Our City Detail for rock retaining walls requires a 6 inch perf pipe, but the block manufacturer and the Geotech both call for four inch, so that will be allowed.
• The plans need to match the Retaining Wall Design Letter. The design letter doesn’t say that there is a 3:1 maximum backslope, but it does say that 3:1 is the design assumption for their analysis. Provide a response to the memos request if all backslopes cannot be made 3:1 or less.
• Ensure drainage pipes are designed to discharge to appropriate locations
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20240845 for approved method of control.
- Steps shall be taken to prevent drainage onto adjacent lots.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Engineering Division
The retaining wall building permit cannot be issued until civil permit PRCCP20240845 is issued first. The two permit plans must match. It is the applicant's responsibility to coordinate the building permit submissions with the status of the civil permit to avoid redundant reviews and permit fees. [Yianni Charitou @ 03/05/2025 11:03 AM]
|
||
Miscellaneous Condition | Open | Prior to Issuance |
Engineering Division
The retaining wall building permit cannot be issued until demolition permits PRDE20231242 and PRDE20230753 are finaled first. [Yianni Charitou @ 03/05/2025 11:19 AM]
|
Reference Number | Status | Type |
---|---|---|
PRDE20230753 | Permit(s) Issued | Demolition |
PRFUP20230968 | Permit(s) Issued | Franchise Utility Permit |
PROLP20231232 | Closed | Oversized Load/House Move Permit |
PRDE20231242 | Permit(s) Issued | Demolition |
PRUSR20231244 | Canceled | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRUSR20231267 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRCNC20240278 | In Plan Check | Commercial - New Construction |
PRMU20240279 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240280 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240281 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240282 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240283 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240284 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240285 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240286 | Returned for Correction | Residential - New Multi-Unit |
PRCCP20240845 | In Plan Check | Civil Construction Permit |
PRAMR20241578 | Canceled | Alternative Methods / Materials Request |
PRAMR20250141 | Returned for Correction | Alternative Methods / Materials Request |
PRRWF20250214 | Returned for Correction | Retaining Wall |
PRRWF20250217 | Returned for Correction | Retaining Wall |
PRRWF20250233 | Returned for Correction | Retaining Wall |
PRRWF20250235 | Returned for Correction | Retaining Wall |
PRRWF20250237 | Returned for Correction | Retaining Wall |
P-19-0105 | Expired | Pre-Application |
P-21-0098 | File Closed | Pre-Application |
PLDDG20220021 | File Closed | Downtown Design Review |
PLPSP20220049 | File Closed | Preliminary Site Plan |
Date Uploaded | File Type | Name |
---|---|---|
02/11/2025 | Receipt | Receipt for transaction:2025-000289 |
03/06/2025 | Letter | Permit Review Correction Letter |
03/06/2025 | Form | Building Permit Application - Final (Flattened) |
03/06/2025 | Plans | Timberlane_BradleyHeights_RW0 (Flattened) |
03/06/2025 | Form | Not Applicable (Flattened) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.