CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRDE20230753
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee (Demolition) | $391.25 | $391.25 | Paid | 06/24/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $391.25 | $391.25 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Pending | |||
Job Start Inspection | Pending | |||
Comment Engineering Div Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Demolition Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | Stop Work | 8/8/2023 | 08/08/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Outstanding
08/08/2023
install erosion control
|
||||
Utility Capping Inspection | Failed | 9/8/2023 | 9/8/2023 | 09/08/2023 |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
09/08/2023
Submit decommission cert from TPCH on the septic tanks
|
||||
Erosion And Sediment Inspection | Failed | 01/19/2024 | ||
Jeff Hill ((253) 204-5633) | ||||
Job Start Inspection | Failed | 9/27/2024 | 09/27/2024 | |
Jason Little ((253) 244-0387) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Demolition Standard Conditions | Open | Engineering Division | Prior to Completion | ||
:
Development Engineering standard demolition conditions:
1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work.
2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law.
Site-specific Conditions:
- The applicant is responsible to demolish the existing septic system(s) per Tacoma Pierce County Health Department standards. Septic decommissioning certificates are required to be filed with Pierce County and copies submitted to the City of Puyallup.
- The applicant shall coordinate water service removal with Fruitland Mutual Water Company.
I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
SEPA Determination Required | Resolved | Planning Division | Prior to Issuance | ||
:
Permit scope subject to SEPA Environmental Review. Permit cannot be issued until associated SEPA Determination appeal period has expired without appeal.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Completion | ||
:
The City may agree to delay the septic decommissioning as long as there is a guarantee of funds made available to the City. The guarantee would be in the amount of $10,000.00 by means of a bond or an assignment of funds. The demolition permit has been conditioned that a final approval shall not be granted until the TPCHD septic decommissioning certificate are provided to the City by the permit holder. If the septic decommission certificates are not provided prior to demolition permit expiration, and there is a financial guarantee on file with the City, the City will request or withhold the bond or assignment of funds. No development permits shall be issued for this site until the TPCHD septic decommissioning certificates are provided to the City. [Yianni Charitou @ 06/22/2023 8:35 AM] Septic tanks decommissioned. Jeff Hill
|
|||||
Plumbing FUW Utility Service Credit | Open | Engineering Division | Standard Conditions | ||
:
Upon demolition of the existing structures, utility service credits become available for the subject site. It is the property owner’s responsibility to retain a copy of available utility service credits and to submit them to the City for future utility development credit. Utility service credits are only valid for a period of six years from the date of permit issuance for which the credits are granted. 4 storm ESUs are granted for the four demolished units (21, 44, 45, & 47). Storm ESU credits can be redeemed on civil permits only. [Yianni Charitou @ 08/30/2023 3:59 PM]
|
Reference Number | Status | Type |
---|---|---|
PRFUP20230968 | Permit(s) Issued | Franchise Utility Permit |
PROLP20231232 | Closed | Oversized Load/House Move Permit |
PRDE20231242 | Permit(s) Issued | Demolition |
PRUSR20231244 | Canceled | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRUSR20231267 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRCNC20240278 | Returned for Correction | Commercial - New Construction |
PRMU20240279 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240280 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240281 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240282 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240283 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240284 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240285 | Returned for Correction | Residential - New Multi-Unit |
PRMU20240286 | Returned for Correction | Residential - New Multi-Unit |
PRCCP20240845 | Returned for Correction | Civil Construction Permit |
PRAMR20241578 | Canceled | Alternative Methods / Materials Request |
P-19-0105 | Expired | Pre-Application |
P-21-0098 | File Closed | Pre-Application |
PLDDG20220021 | File Closed | Downtown Design Review |
PLPSP20220049 | File Closed | Preliminary Site Plan |
Date Uploaded | File Type | Name |
---|---|---|
01/19/2024 | Report | Inspection Report (Erosion And Sediment Inspection) |
06/10/2024 | Letter | Permit Expiration Notice |
06/22/2023 | Plans | CoP Stormwater Pollution Prevention Plan Factsheet for projects less than 2000 SF |
06/23/2023 | Other | ASBESTOS ABATEMENT (Stamped) |
06/23/2023 | Other | POWER OF ATTORNEY (Stamped) |
06/23/2023 | Other | PUGET SOUND AIR (Stamped) |
06/23/2023 | Plans | SITE PLAN (Stamped) |
06/24/2023 | Receipt | Receipt for transaction:2023-001195 |
07/11/2023 | Permit | Permit - Detailed |
08/08/2023 | Report | Inspection Report (Comment Engineering Div Inspection) |
09/27/2024 | Report | Inspection Report (Job Start Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView